ML17269A032
| ML17269A032 | |
| Person / Time | |
|---|---|
| Site: | Mcguire, McGuire |
| Issue date: | 09/19/2017 |
| From: | Capps S Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| MNS-17-039 | |
| Download: ML17269A032 (2) | |
Text
e/'DUKE
~JENERGY September 19, 2017 Serial No: MNS-17-039 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001
Subject:
Duke Energy Carolinas, LLC McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Renewed License Nos. NPF-9 arid NPF-17 Emergency Plan, Revision 17-1 Steven D. Capps Vice President McGuire Nuclear Station Duke Energy MG01VP J 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 50.54(q)
Please find attached Revision 17-1 to the McGuire Nuclear Station Emergency Plan. This revision is submitted in accordance with the requirements of 10 CFR 50.54(q) and does not result in a reduction in the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.
Questions regarding this submittal should be directed to Jeff Thomas, McGuire Regulatory Affairs Manager, at (980) 875-4499.
j{)~
Steven D. Capps Attachments
U.S. Nuclear Regulatory Commission September 19, 2017 Page 2 (Two Copies) cc:
Catherine Haney, Regional Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 (One Copy)
Director Office of Nuclear Material Safety and Safeguards Mail Stop 14 A12 Washington, D. C. 20555-0001 (w/o attachments)
Michael Mahoney, Project Manager U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 Mr. Andy Hutto NRC Senior Resident Inspector McGuire Nuclear Station