ML17263A892

From kanterella
Jump to navigation Jump to search
Forwards Rev 21 to QA Program for Station Operation
ML17263A892
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/21/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17263A890 List:
References
NUDOCS 9412290329
Download: ML17263A892 (5)


Text

pa.roe.rrv z

REGULAT(NTNRNICLIBTURElTASBRlSEETIONSTEM (RZDS)

ACCESSION NBR:9412290329 DOC.DATE: 94/12/21 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G '5000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Document Control Branch (Document Control Desk)

SUBJECT:

Forwards rev 21 to QA program for station operation.

-=

P r

I DISTRIBUTION CODE'004D COPIES RECEIVED'LTR ENCL SIZE TITLE: QA Topical Report,

Change, Amendment, or Correspondence (Docket/Utili NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 I

RECIPIENT ID CODE/NAME JOHNSON,A INTERNAL: DRS/RGN1 DRS/RGN8 E

C NTZ Ol NRR/DOTS/TQMB RGNl FILE EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME DRS/RGN2 DRS/RGN4 NRR/DISP/IMS OC/LFDCB IHS COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

0 u

YOTE TO ALL"RIDS" RECIPIENTS:.

PLEASE HELP US TO REDUCE 'O'ASTE! CONTACTTHE DOCUMENTCOYTROL DESK, ROOM Pl-37 (EXT. 504-20S3

) TO ELIMIYATEYOUR YAMEI'ROTI DISTRIBUTIONLISTS I'OR DOCUKIEYTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

AHD ROCHESTER GASANDELECTRIC CORPORATION ~ 89 EASTAVEIVUE,ROCHESTER, N. Y IrI649-000I ROBERT C MECREDY Vice President Cinna Nuclear Production December 21, 1994 AREA CODE716 546.2700 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ATTN:

Mr. Allen R. Johnson Project Directorate I-3

SUBJECT:

Revised Submittal of Quality Assurance Program for Station Operation (Revision 21)

R. E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Johnson:

In accordance with 10 CFR 50.54(a)(3), enclosed is revision 21 to the Quality Assurance Program for Station Operation.

The program has been reformatted to follow the format of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants", Section 17.3.

The reformatting results in less detail in the text than was found in Revision 20.

However, the basic commitments to the Regulatory Guides made in Revision 21 are the same as those made in Revision 20.

The utilization of the SRP Section 17.3 structure provides a standardized organization outline to support more efficient review and to facilitate ease of potential future enhancements.

As noted in NRC Inspection Report 50-244/94-22, on September 28, 1994, RGSE management met with NRC staff. At that time the proposed revision to the Quality Assurance Plan was discussed including the licensing basis and potential initiatives for inclusion.

Some of the key aspects associated with this change are:

~

QA reporting responsibility reassigned to the Vice-President, Nuclear Operations.

9412290329 94i22i PDR i', ADOCK 05000244 P

- 'DR ppsI

l P

L 4 tl

~

QA Manual being phased out following implementation of Nuclear Directives in a Nuclear Policy Manual.

Increasing the emphasis on the line organization's responsibility for self-instituted and self-assessed quality reviews.

~

Adjusting assessment frequencies based on safety significance and the assessed area's performance.

~

A performance-based approach is emphasized more than a compliance-based approach including recognition of assessment functions other than auditing.

~

Elements of the N45.2 daughter standards not previously addressed are now more clearly described.

Since the reformatting resulted in a complete rewrite of the program, no revision bars are used to denote the changes.

We request that upon NRC approval, the QA Program changes should be considered effective immediately and implemented concurrently.

We will be prepared to discuss the contents of this submittal with NRC at any time after the staff has had the opportunity to review the document.

Please don't hesitate to contact us if we can provide any further clarifications.

Very t y yours, Robert C. Mecred

Enclosure:

QA Program for Station Operation Revision 21 xc:

U.S. Nuclear Regulatory Commission Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate 1-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

F C