Forwards Insp Rept 50-244/94-05 on 940208-0308 & Notice of Violation
ML17263A571
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/06/1994
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17263A572 List:
References
NUDOCS 9404120024
Download: ML17263A571 (6)


See also: IR 05000244/1994005

Text

APR

6 rgb

Docket No. 50-244

Dr. Robert C. Mecredy

Vice President,

Ginna Nuclear Production

Rochester

Gas and Electric Corporation

89 East Avenue

Rochester,

New York 14649

Dear Dr. Mecredy:

SUBJECT:

NOTICE OF VIOLATION50-244/94-05

This letter transmits the February 8, 1994 to March 8, 1994 inspection findings of Messrs.

T. Moslak'and E. Knutson at the R. E. Ginna Nuclear Power Plant.

At the end of the

inspection, the findings were discussed with Mr. J. Widay and other members of your staff.

The inspection was focused on areas

relevant to public health and safety and examined

the

control of operations,

maintenance,

engineering,

and plant support activities conducted during

this period.

Based

on the results of this inspection,

certain

testing activities relating to

demonstrating

that safety related

components will perform satisfactorily appeared

to be in

violation of NRC requirements,

as specified in the enclosed Notice of Violation (Notice). The

violation is ofconcern because your failure to demonstrate satisfactory component performance

during testing could have compromised the operation of safety related equipment.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response.

In your response,

you should document the

specific actions taken and any additional actions you plan to prevent recurrence.

Afterreviewing

your response to this Notice, including your proposed corrective actions and the results of future

inspections, the NRC willdetermine whether further NRC enforcement action is necessary

to

ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure willbe placed in the NRC Public Document Room.

The response

directed by this letter and the enclosed Notice are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, Public Law No. 96.511.

OPP~CXAL REGORO GGPY

9404120024

940406

PDR

ADOCK 05000244

Q

PDR

Dr. Robert C. Mecredy

Your cooperation with us in this matter is appreciated.

APR

6 lee

Sincerely,

orlglnal Sigoed g

James

C. bnv>lie

James C. Linville, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Region I Inspection Report 50-244/94-05 with Attachments

cc w/encls:

R. Smith, Senior Vice President, Production and Engineering

Central Records (5 copies)

Director, Energy and Water Division

State of New York, Department of Law

¹ Reynolds, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident Inspector

State of New York, SLO Designee

OFFICE RECORD CCR'V

~

~

P

I

I

'

~

II

P

la%

rk'h p

'4 i

yai~i g Qj

pg4Qp J

Dr. Robert C. Mecredy

bcc w/encls:

Region I Docket Room (with concurrences)

W. Lazarus, DRP

D. Lew, DRP

M. Oprendek, DRP

bcc w/encls (VIAE-MAIL):

A. Johnson, PM, NRR

V. McCree, OEDO

W. Butler, NRR

M. Campion, ORA

M. Shannon, ILPB

APR

6 l994

RI:DRP

RI:DRP

RI:DRP

RI:D

Knutson/meo

3/28/94

Moslak

Li ie

OFFICIALRECORD COPY

A:GIN9405.MEO

~'

~

'I