Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 21 / Refuel 21
ML17242A237
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/30/2017
From: Jarrell J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3FI -2017-0063
Download: ML17242A237 (6)


Text

Entergy Operations, Inc.

17265 River Road KiUona, LA 70057-3093 Tel 504-739-6685 Ii Fax 504-739-6698 jjarrelentergycom John P Jarretl III Manager, Regulatory Assurance Waterford 3 W3FI -2017-0063 August 30, 2017 us. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 21 / Refuel 21 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Attached is the subject report which covers the Owners Activity Report Form, OAR-I, for Waterford 3 Operating Cycle 21 I Refuel 21, enclosed as Attachment I

. This report is being submitted in accordance with ASME Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, which was adopted for use at Waterford 3 commencing its incorporation into Regulatory Guide 1.147 and subsequent revision to CEP-RR-001 ASME Section XI Repair/Replacement Program on March 16, 2017.

The OAR-I form is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-I form provides: (I) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division I and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division I acceptance criteria. A copy of this letter and the attached report is also being submitted to the office of the Louisiana State Fire Marshall.

There are no new commitments contained in this submittal.

Please contact John P. Jarrell, Regulatory Assurance Manager, at (504) 739-6685 should you have any questions regarding this submittal.

ncer PJ/

B hment:

I Owners Activity Report for Inservice Inspection Performed During Operating Cycle 21 / Refuel 21

W3FI -2017-0063 Page 2 cc:

Regional Administrator RidsRgn4MailCenternrc.gov U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, TX 76011-4511 NRC Senior Resident Inspector Frances.Ramireznrc.gov Waterford Steam Electric Station Unit 3 Chris.Speernrc.gov P.O. Box 822 KIllona, LA 70066-0751 NRC Project Manager for Waterford 3 ApriI.PuIvirentinrcgov Mail Stop O-07D1 Washington, DC 20555-0001 Mr. H. Butch Browning, Jr.

Office of the State Fire Marshall 8181 Independence Blvd.

Baton Rouge, LA 70806

ATTACHMENT I To W3FI -2017-0063 Owners Activity Report for Inservice Inspection Performed During Operating Cycle 21 I Refuel 21

CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-I OWNERS ACTIVITY REPORT Report Number Cycle 21 I Refuel 21 Plant Waterford Steam Electric Station, 17265 River Road, Killona, La. 70057 Unit No.

3 Commercial service date 09/24/1985 Refueling outage no.

21 (If applicable)

Current inspection interval 3rd

( lst2nd 3td 4th other)

Current inspection period 3rd

( lSt2fld 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 Edition, Through 2003 Addenda Date and revision of inspection plans 4/27/2017 Revision 006 SEP-ISl-104 Edition and Addenda of Section Xl applicable to repairlreplacement activities, if different than the inspection plans Same as above.

Code Cases used:

N-532-5 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repairlreplacement activitie and evaluations supporting the completion of Refuel 21 conform to the require ents of Section Xl.

+ca i c (refueling outage number)

Signed

/

Date 2

I Owner or Owr(ers DesigniTitle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Louisiana and employed by The Hartford Steam Boiler Inspection andinsuranceCopypfConnecticut of Hartford, CT have inspected the items described in this Owners Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in Accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repairl replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in anymanner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commission 10562 A

N I LA 1658 Inspe ors Signature National Board, State, Province, and Endorsements Date

.2LL/ ):/?

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item_Number None None None

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Date Repair/Replacement Work Completed Plan Number None None None None None