UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 24, 2017 Mr. Joseph W. Shea Site Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801
SUBJECT:
UPDATED INSPECTION PLAN FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 (REPORTS 05000259, 05000260, 05000296/2017005)
Dear Mr. Shea:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the Browns Ferry Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
J. Shea 2
Please contact me at (404) 997-4415 with any questions you have regarding this letter.
Sincerely,
/RA/
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68
Enclosure:
Browns Ferry Inspection/Activity Plan (09/01/2017- 06/30/2019) cc Distribution via ListServ
J. Shea 3
SUBJECT:
UPDATED INSPECTION PLAN FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 (REPORTS 05000259, 05000260, 05000296/2017005)
August 24, 2017 DISTRIBUTION:
M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML OFFICE RII:DRP NAME ABlamey DATE 8/24/2017 OFFICIAL AGENCY RECORD 17236A197
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/17/2017 10:12:40 MODS
- PLANT MODIFICATIONS INSPECTION 4
1, 2, 3 IP Evaluations of Changes, Tests, and Experiments 7111117T 12/04/2017 12/08/2017 EPU
- EROSION AND FLOW ACC COROSION PROGRAMS 1
1, 2, 3 IP Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 49001 01/22/2018 01/26/2018 1, 2, 3 IP Power Uprate 71004 01/22/2018 01/26/2018 ISI
- UNIT 3 IN-SERVICE INSPECTION 1
3 IP Inservice Inspection Activities - BWR 7111108G 02/26/2018 03/02/2018 RP
- RAD HAZARDS AND TRANSPORTATION 2
1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/05/2018 03/09/2018 1, 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 03/05/2018 03/09/2018 DBAI
- DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2, 3 IP Design Bases Assurance Inspection (Teams) 7111121M 04/09/2018 04/13/2018 1, 2, 3 IP Design Bases Assurance Inspection (Teams) 7111121M 04/30/2018 05/04/2018 1, 2, 3 IP Design Bases Assurance Inspection (Teams) 7111121M 05/14/2018 05/18/2018 EP
- EP PROGRAM INSPECTION 3
1, 2, 3 IP Alert and Notification System Testing 7111402 04/16/2018 04/20/2018 1, 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/16/2018 04/20/2018 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 04/16/2018 04/20/2018 1, 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/16/2018 04/20/2018 1, 2, 3 IP Performance Indicator Verification 71151 04/16/2018 04/20/2018 OL EXAM
- INITIAL LICENSE EXAM PREP 3
1 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES V23515 06/18/2018 06/22/2018 RP
- RP PUBLIC INSPECTION 2
1, 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/18/2018 06/22/2018 1, 2, 3 IP Radiological Environmental Monitoring Program 71124.07 06/18/2018 06/22/2018 1, 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 06/18/2018 06/22/2018 1, 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/18/2018 06/22/2018 OL EXAM
- INITIAL LICENSE EXAM 3
1 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES V23515 07/16/2018 08/03/2018 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
1, 2, 3 IP Problem Identification and Resolution 71152B 08/06/2018 08/10/2018 1, 2, 3 IP Problem Identification and Resolution 71152B 08/20/2018 08/24/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/17/2017 10:12:40 OL RQ
- REQUAL INSPECTION 2
1, 2, 3 IP Licensed Operator Requalification Program 7111111B 09/10/2018 09/14/2018 ISI
- UNIT 1 IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - BWR 7111108G 10/22/2018 10/26/2018 TFPI
- BROWNS FERRY NFPA 805 3
1, 2, 3 IP Fire Protection - NFPA 805 (Triennial) 7111105X 02/11/2019 02/15/2019 1, 2, 3 IP Fire Protection - NFPA 805 (Triennial) 7111105X 03/04/2019 03/08/2019 ISI
- UNIT 2 IN-SERVICE INSPECTION 1
2 IP Inservice Inspection Activities - BWR 7111108G 03/11/2019 03/15/2019 RP
- RP OCCUPATIONAL WEEK 1 3
1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/11/2019 03/15/2019 1, 2, 3 IP Occupational ALARA Planning and Controls 71124.02 03/11/2019 03/15/2019 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/11/2019 03/15/2019 1, 2, 3 IP Occupational Dose Assessment 71124.04 03/11/2019 03/15/2019 1, 2, 3 IP Radiation Monitoring Instrumentation 71124.05 03/11/2019 03/15/2019 1, 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 03/11/2019 03/15/2019 1, 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/11/2019 03/15/2019 RP
- RP OCCUPATIONAL WEEK 2 2
1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2019 03/29/2019 1, 2, 3 IP Occupational ALARA Planning and Controls 71124.02 03/25/2019 03/29/2019 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/25/2019 03/29/2019 1, 2, 3 IP Occupational Dose Assessment 71124.04 03/25/2019 03/29/2019 1, 2, 3 IP Radiation Monitoring Instrumentation 71124.05 03/25/2019 03/29/2019 1, 2, 3 IP Occupational Exposure Control Effectiveness 71151-OR01 03/25/2019 03/29/2019 1, 2, 3 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/25/2019 03/29/2019 EP
- EP EXERCISE INSPECTION 6
1, 2, 3 IP Exercise Evaluation 7111401 06/24/2019 06/28/2019 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 06/24/2019 06/28/2019 1, 2, 3 IP Exercise Evaluation - Scenario Review 7111408 06/24/2019 06/28/2019 1, 2, 3 IP Performance Indicator Verification 71151 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.