ML17047A621
Jump to navigation
Jump to search
| ML17047A621 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/14/2017 |
| From: | NRC Region 1 |
| To: | |
| Miller E | |
| References | |
| Download: ML17047A621 (9) | |
Text
NRC Resident Inspector Exit Meeting 4th Quarter 2016 ML17047A621
Overview
- Summary
- Inspectors
- NCVs/Findings
- LER Closeout
- PI&R Samples
- Observations 2
Inspectors
- E. Miller, Senior Resident Inspector (Acting)
- B. Sienel, Resident Inspector
- J. DeBoer, Emergency Preparedness Inspector
- P. Finney, Senior Resident Inspector
- S. Horvitz, Resident Inspector
- D. Kern, Senior Reactor Inspector
- S. Pindale, Senior Reactor Inspector 3
Green NCV
- NRC-identified Green Non-Cited Violation of Technical Specification 5.4, Procedures was identified because Entergy staff did not implement procedure AP-12.06, Equipment Status Control, as required. Specifically, Entergy personnel did not recognize the impact of a change associated with the tagout of 10MOV-13C, the C Residual Heat Removal system suction containment isolation valve.
- Created reasonable doubt of operability, which was unrecognized. This resulted in failure to declare the PCIV inoperable and enter TS 3.6.1.3.
4
Green NCV
- Cornerstone: Barrier Integrity
- More than minor: Similar to Example 3.j in Inspector Manual Chapter 0612, Appendix E
- Significance: Green - Inspector Manual Chapter 0609 Appendix H for Containment Integrity
- Cross-Cutting Aspect: H.11 - Human Performance, Challenge the Unknown 5
License Event Reports Closed
- LER 05000333/2016-001-00, System Actuations during Manual Scram in Response to Frazil Ice Blockage and Residual Transfer
- LER 05000333/2016-002-00, Sticking DC Pilot Solenoid Valve Cluster Assembly Results in Slow MSIV Closures 6
Problem Identification and Resolution Annual Samples
- Adequacy of corrective actions for four October 2014 reactor recirculation pump (RWR) trips as they relate to an August 2016 A RWR pump trip
- A Emergency Diesel Generator Fuel Supply and Return Lines Swapped; Operability Evaluation
- Equipment Reliability in Relation to Preventive Maintenance Deferrals
- Safety Relief Valve Issues 7
Observations
- Site Trend associated with Human Performance Events
- Radiation Protection, Operations, and Supplemental Workforce
- Broader look through common cause evaluation?
- Tube Leaks associated with Heat Exchangers and Unit Coolers
- Accuracy of Licensing Basis Documents
- Actuator Preventive Maintenance associated with Control Room Emergency Ventilation System Damper 70MOD-108A(OP) 8
Questions?
9