Inservice Inspection Owners Activity Report 1-5-1-2, for Refueling Outage S1R27, First Period of the Fifth ISI Interval
ML17040A407
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/06/2017
From: Lawrence D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
S1R27 1-5-1-2
Download: ML17040A407 (7)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 6, 2017 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 Serial No.

SPS-LIC/CGL Docket No.

License No.

INSERVICE 'INSPECTION OWNER'S ACTIVITY REPORT (OAR)17-037 RO 50-280 DPR-32 In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric and Power Company (Dominion) hereby submits the lnservice Inspection Owner's Activity Report (Form OAR-1) for Surry Unit 1 refueling outage S1R27, which ended on November 11, 2016. This document contains the reporting requirements for the second refueling outage of the first period in the fifth ten-year inservice inspection interval for Surry Unit 1.*

-If you have any questions concerning this information, please contact Mrs. Candee G. Lovett at (757) 365-2178.

Very truly yours,

~w~

Douglas C. Lawrence tf'/J'f-Director Station Safety & Licensing Surry Power Station

Attachment:

Owner's. Activity Report (Form OAR-1),

Surry Unit 1

Refueling Outage S1 R27, First Period of the Fifth ISi Interval Commitments made in this letter:

None

cc:

U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Ms. K. Cotton Gross NRG Project Manager-Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Ms. B. Mozafari NRG Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 H-12 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Autho'rized Nuclear Inspector Surry Power Station Serial No.: 17-037 Docket No.: 50-280 Page 2 of 2

ATTACHMENT OWNER'S ACTIVITY REPORT (FORM OAR-1 ),

SURRY UNIT 1 REFUELING OUTAGE S1R27, FIRST PERIOD OF THE FIFTH ISi iNTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Serial No.: 17-037 Docket No.: 50-280

CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 1-5-1-2(Unit1. 5th Interval. 1st Period. 2nd Report)

Plant Surry Power Station. 5570 Hog Island Road. Surry, VA 23883 CASE N-532-5 Unit No*----~--=,1___,..,....,------

(if applicable)

Commercial service date ----=1=2~/2=2~/1'°"'9"""7_,,2~-

Refueling outage no. __

___,.S=1"'-'R2=7~-

Current inspection interval ---------------~-~~5=th,_,___~~~-------------

  • c1st, 2nd, 3rd, 4th, other)

Current inspection period 1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition Date and revision of inspection plans Surry Unit 1, 5th Int. ISI Plan, Revision 1, Aug. 18, 2015 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code cases used for inspection and evaluation: -~S=e=e=S=u~rrv~U~n=it~1~. =5t=h~I~n=t.~I=S~I ~Pl=a~n,~R~e=v~.1~Se=c=ti=o~n~6~n=o~r =co=m~p=le=t=e~li=st~o=f__,c=o=de==ca=s=e=s __ _

(if applicable, including cases modified by case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the

-ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of S1R27 conform to the equire e!1ts of Se *on XI.

(refueling outage number)

  • Signed Date ____ 4
),._,?.'-l-'l__,/r
....2"""~........ 17+----------

CERTIFICATE. OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

---<1@_=...."--'--* -~---

....c...L..-=-~---'""I ___ Commissions ----~----,__,_N,._B-_,_7_,,_9""33"'--'-'N=S,_, =IS~:__,V'-'-A,,.8""83""(..,_R,,_l ___ ~-----

Inspector's Signature National Board, State, Province, and Endorsements Date_..._,/ J~~___,i /t_!~/ __ _

/

I

Page 1of2 CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 CASE N-532-5 Abstract of Repair/replacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 1

01-Sl-PP-12.00-Sl-PIPE-Two rejectable indications were 10/31/2016 2016-104 45-1502 identified on an integral attachment weld. Indications were cleared.

3 01-CC-PP-3.00-CC-PIPE-Performed repairs for throughwall leak 11/3/2016 2016-102 248-151 identified on 01-CC-PP-3.00-CC-PIPE-248-151.

3 01-CW-PP-96.00-WC-Performed weld repairs on 01-CW-PP-10/26/2016 2016-097 PIPE-2-10 96.00-WC-PI PE-2-10.

3 01-SW-PP-2.00-WS-PIPE-Performed repairs for throughwall leak 9/16/2015 2015-181 315-9107 identified on piping downstream of 1-SW-327.

3 01-SW-PP-2.00-WS-PIPE-Performed repairs for throughwall leak 11/6/2015 2015-241 317-9107 identified on 01-SW-PP-2.00-WS-PIPE-317-9107.

3 01-SW-PP-2.00-WS-PIPE-Performed repairs for throughwall leak 9/25/2015 2015-202 317-9107 identified on 01-SW-PP-2.00-WS-PIPE-317-9107.

3 01-SW-PP-2.00-WS-PIPE-Performed repairs for throughwall leak 12/11/2015 2015-206 318-9107 identified on 01-SW-PP-2.00-WS-PIPE-318-9107.

3 01-SW-PP-2.00-WS-PI PE-Performed repairs for throughwall leak 10/1/2015 2015-205 318-9107 identified on 01-SW-PP-2.00-WS-PIPE-318-9107.

3 01-SW-PP-3.00-WS-PIPE-Performed repairs for throughwall leak 6/16/2016 2016-041 313-9107 identified on 01-SW-PP-3.00-WS-PIPE-313-9107.

3 01-SW-PP-3.00-WS-PIPE-Performed repairs for throughwall leak 1/22/2016 2016-009 321-9107 identified on 01-SW-PP~3.00-WS-PIPE-321-9107.

Page 2 of2 CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 CASE N-532-5 Abstract of Repair/replacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement Descriotion of Work Completed Plan Number 3,

01-SW-PP-3.00-WS-PI PE-Performed repairs for throughwall leak 11/13/2015 2015-251 326-9107 identified on 01-SW-PP-2.00-WS-PIPE-326-9107.

3 01-SW-PP-3.00-WS-PIPE-Performed repairs for throughwall leak 4/9/2016 2016-017 56-136 identified on 01-SW-PP-3.00-WS-PIPE-56-136.

3 01-SW-PP-6.00-WS-PIPE-Performed repairs for throughwall leak 1/7/2016 2016-003 307-9107 identified on 01-SW-PP-6.00-WS-PIPE-307-9107.

3 02-SW-PP-2.00-WS-PIPE-Performed repairs for throughwall leak 10/13/2015 2015-212 318-9107 identified on 02-SW-PP-2.00-WS-PIPE-318-9107.

Page 1of1 CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNER'S ACTIVITY REPORT Table 1 CASE N-532-5 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number None