{{#Wiki_filter:FE NOC' ~ FirstEnergy Nuclear Operating Company Marty L. Richey Site Vice President L-17-002 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Beaver Valley Power Station P.O. Box 4 Shippingporl, PA 15077 10 CFR 50.55a(g) 724-682-5234 Fax: 724-643-8069 Twenty-Fourth Refueling Outage lnservice Inspection Summary Report In accordance with 10 CFR 50.55a, "Codes and standards," and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Article IWA-6000, "Records and Reports," enclosed please find the inservice inspection summary report for examinations performed prior to and during the twenty-fourth refueling outage at Beaver Valley Power Station, Unit No. 1 (BVPS-1). Class 1, 2, 3, and IWE component inservice inspection examinations addressed in the report are part of the BVPS-1 third period of the fourth ten-year interval and were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 2001 Edition, 2003 Addenda. The inservice inspection term at BVPS-1 covered by this report includes the period from May 23, 2015 to October 25, 2016. There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-6810. Sincerely, ~, ~, ~ Marty L. Ri\\ hey
Enclosure:
Beaver Valley Power Station, Unit No. 1, Twenty-Fourth Refueling Outage lnservice Inspection Summary Report January 13, 2017
Beaver Valley Power Station, Unit No. 1 L-17-002 Page 2 cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative
Enclosure L-17-002 Beaver Valley Power Station, Unit No. 1 Twenty-Fourth Refueling Outage Inservice Inspection Summary Report (146 Pages Follow)
BEAVER VALLEY POWER STATION, UNIT 1 Route 168, Shippingport, PA Outage 24, Year 2016 Inspection Tenn: 5/23/2015 to 10/25/2016 Issue date: I /6 /17 I Owner: FirstEnergy Nuclear Operating Company (FENOC) 76 South Main St. Akron, OH 44308 NRC Docket Number: 50-334 Reactor Supplier: Westinghouse Electric Corporation Commercial Service Date: September 30, 1976 Reviewed by: -------~-' _ ____,: ~1------- l~ci 'r/e,11,-( ~ Date: J'/=/t 7 Supv, Nuclear Programs Approved by: _t_A_, _t_IA..-"'-V-=-L.-"--'.J_CJ.{ ~-=---~~--=------ Manager, Technical Services Engineering Date: / )1, /;? -41,..........1""--'---
Cover Page Tab]e of Contents FonnNIS-1 Outage Summary 90-DAY REPORT TABLE OF CONTENTS ASME XI Vessel, Piping and Support Examinations
- 1. Class 1
- 2. Class 2
- 3. Class 3
- 4. IWE/IWL IWE/IWL Examinations Pressure Testing Deficiency Resolution NIS-2 Forms Appendix I - Completed Code Examinations Appendix II-Repair/Replacement Abstract and NIS-2 Forms 2
Page Number 1 2 3-4 5 5 5 5 5 6 6 6 6 AI-1 thru Al-4
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules I. Owner FirstEnergy Nuclear Operating Company (FENOC), 76 South Main St. Akron, OH 44308 (Name and Address of Owner)
- 2. Plant Beaver Valley Power Station, P.0. Box 4, Shippingport, PA, 15077 (Name and Address of Plant)
- 3. Plant Unit
- 4. Owner Certificate of Authorization (if required)
NIA ~~~~~~~~~~
- 5. Commercial Service Date 9130176
- 6. National Board Number for Unit NIA
- 7. Components Inspected Manufacturer or Component or Manufacturer or Installer State or National Aoourtenance Installer Serial No.
Province No. Board No. Reactor Vessel Combustion Engineering 69103 105642B 21011 lB Steam Generator Westinghouse NP03065 l/2MB2 591602V 83 1 C Steam Generator Westinghouse NP03065 l/3MB2 591603V 84 cl-~.,,..~ ~.,,,.. Pressurizer Westinghouse 1311 434676V MOV-RC-595 Westinghouse A-2328-Al NIA Reactor Coolant Piping Southwest Fabricating NIA NIA Auxiliary Pioing Schneider Power NIA NIA Component Supports Various NIA NIA Containment NIA N/A 4630 Note: Supplemental sheets in fonn oflists, sketches, or drawings may be used, provided (1) size is 8 Y2 in. x 11 in., (2) infonnation in items I though 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form. This fonn (E0029) may be obtained from the ASME Order Dept., 22 Law Drive, Box 2300. Fairfield, NJ 07008-2300 3 68-50 NIA NIA NIA NIA NIA
- 8. Examination Dates 5/23/20 l S to FORM NIS-1 (Back) 10/2512016
- 9. Inspection Period Identification:
12/3/2014 to 3/31/2018 (3'd Inspection Period of 4th Interval)
- 10. Inspection Interval Identification:
411/2008 to 3/31/2018 (41h IO-Year Inspection Interval)
- 11. Applicable Edition of Section XI 2001 Addenda 2003
- 12. Date/Revision oflnspection Plan: _11
..... 2_-AD M_-_2..... 03..... 9........... R..... e_vi..... s..... io..... n..... I..._.5 _________________ _
- 13. Abstract of Examination and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. See Appendix I (Code Exams) for exams performed during 1 R24. 1 R24 was the second outage in the 3n:1 Period of the 411\\ Ten-Year Interval. The 4tn Interval examination requirements will be met in 1R25, within the 1 year IWA-2430(d)(3) extension allowance, for the following Examination Categories: 8-A, B-O, B-M-2, B-N-2, B-N-3, and R-A. The remaining examinations of these categories are associated with the Reactor Vessel 10-yr. ISi examination. The 4th Interval examination requirements for all other Examination Categories have been completed. Relief requests documenting 4111 Interval impractical examinations will be submitted to the NRC within the 10CRF50.55a specified time period.
- 14. Abstract of Results of Examination and Tests. See text of summary report.
J 5. Abstract of Corrective Measures. Replacement of River Water piping was required as a result of a pressure test during 1 R24. Also, corrective measures were required due to discovery of boric acid leakage on pipe flange and valve bolting. The Boric Acid Corrosion Control (BACC) Team evaluated each condition and detennined the necessary corrective actions to resolve the UNSAT condition. We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XL Certificate of Authorization No. (if applicable) Date Ja /I t-J // b Signed CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Pennsylvania and employed by The Hartford Steam Boiler Inspection and of Insurance Company of Connecticut Hartford, Connecticut have inspected the components described in this 0Vl'I!er's Report during the period .512312015 to l 0/25/2016 and state that to the best of my knowledge and belief, the Owner has perfonned examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XL By signing this certificate neither the Inspector nor his employer make any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthennore, neither the inspector I nor his employer shall be liable in any manner for any personal injmy or property damage or a loss of any kind arising I from or connected with
- s inspecti
~.J, Commissions NB 9428 ANIB, PA 2384 National Board, State, Province and Endorsements Date 4
OUTAGE
SUMMARY
During the Twenty-fourth Refueling Outage (1R24) at the Beaver Valley Power Station Unit 1, Inservice Inspection (ISI) examinations were performed on Class 1, 2, 3 and the contaimnent components. This was the second outage in the third period of the fourth ten-year interval. ASME XI Class l, 2, 3 and IWE Credited Exams (See Appendix I)
- 1. Sixty-four (64) Class 1 exams were performed and are divided as follows:
- a. Vessels and Welds Visual Exams Ultrasonic Exams
- b. Class 1 bolting Visual Exams Ultrasonic Exams
- c. Pipe Supports (VT-3)
- d. RI-ISi piping VT-2 Exams 9
2 36 4 3 10
- 2. Thirty-two (32) Class 2 exams were performed and are divided as follows:
- a. Welded Attachments (PT) 3
- b. Pipe Supports (VT-3) 7
- c. RI-ISi piping VT-2 exams 22
- 3. Two (2) visual exams of Class 3 Supports:
- a. Supports, {VT-3) 2
- 4. Five (5) IWE/IWL exams were performed as follows:
- a. Liner/Moisture Barrier (GV) 2
- b. Liner UTT exam follow-up 2
- c. Containment Concrete (GV) 1 Examinations were performed by FirstEnergy Nuclear Operating Company (FENOC) NDE Technicians, supplemented with contracted NDE technicians from IDDEAL Concepts, International Quality Consultants (IQC), and Wesdyne. Appendix I compiles the examinations that have been credited toward fulfilling the Ten-Year Plan requirements.
5
IWE/IWL Examinations The 1 R24 IWE/IWL examinations included a general visual of the accessible areas of the liner plate, penetrations, moisture barrier and the concrete containment. All of the reported deficiencies were docmnented and resolved in the corrective action program. None of the reported deficiencies challenged the structural integrity of the contaimnent. No liner plate repairs were necessary. Pressure Testing The Class l piping System Leakage Test was performed prior to plant start-up from IR24. All Class I and 2 bolted connections associated with insulated components were examined during 1 R24. Boric Acid leakage was evident on eleven components. See deficiency resolution paragraph below. Also, Class 2 and 3 system functional and system inservice tests were performed in accordance with 40-month pressure testing requirements. One Class 3 pressure test resulted in replacement of a section of piping in the River Water System due to a through-wall leak. Deficiency Resolution As noted above, river water piping replacement was necessary due to through-wall leak discovered during a Class 3 pressure test. The boric acid deficiencies associated with the pressure testing of bolted connections were documented on Condition Reports and evaluated and resolved by the Boric Acid Corrosion Control Team. NIS-2 Forms Included as Appendix II are the NIS-2 Forms associated with ASME XI repairs and replacements performed since the last 90-Day ISi Summary Report. 6
APPENDIX I 1R24 COMPLETED CODE EXAMS Sum No. Component ID Description Class Category Item No. Method lso No. Class 1 Vessels and Welds 151050 1 RV-BMl-PENE-00 RV LOWER HEAD BMI NOZZLES 1 N-722 615.80 VE E-0010-2 151060 1 RV-BMl-TUBE-WELDS BMI TUBE WELDS 1 N*722 815.100 VE E-0010-2 162000 RC-R-1-ACC-INT INTERIOR 1 6-N-1 813.10 VT-3 E-001F-3 186100 RC-E-18-RADIUS(2H) NOZZLE INSIDE RADIUS 1 B-0 63.140 VT-1 E-001M-3 186200 RC-E-1 B-RADIUS(2C) NOZZLE INSIDE RADIUS 1 8-0 83.140 VT-1 E-001M-3 189600 RC-E-1 C-RADIUS(3H) NOZZLE INSIDE RADIUS 1 8-0 83.140 VT-1 E-001M-3 189700 RC-E-1 C-RADI US(3C) NOZZLE INSIDE RADIUS 1 8-0 83.140 VT-1 E-001M-3 193100 RC-TK-1-RAD I US-S NOZZLE INSIDE RADIUS 1 8-0 83.120 VT-2 E-001P-3 193150 RC-TK-1-HTR-SLEEVES PZR HEATER SLEEVE 1 WCAP OG09140 VT-2 E-001P-3 318000 Sl-30-5-S-02 BUTIWELD 1 R-A R1.11 UT 02238-5 189640 RC-E-1C-N-11 NOZZLE TO SAFE END (HOT LEG} 1 R-A R1.11 UT E-001M-3 Class 1 Bolting 100010 BC-MOV-1 RH-700 BOLTED CONNECTION 1 8oltcon Bolt1 VT-2 074A-3 100012 BC-FE-1RC-480 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0354A-1 100013 BC-FE-1 RC-481 BOLTED CONNECTION 1 8oltcon Bolt1 VT-2 03548-1 100014 BC-FE-1RC-482 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0354C-1 100015 BC-MOV-1 RC-590 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 L-001A-5 100016 BC-MOV-1 RC-591 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 L-001A-5 100017 BC-MOV-1 RC-592 BOLTED CONNECTION 1 8oltcon Bolt1 VT-2 L-002A-5 100018 BC-MOV-1 RC-593 SOL TED CONNECTION 1 8oltcon Bolt1 VT-2 L-002A-5 100019 BC-MOV-1RC-594 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 L-003A-5 100020 BC-MOV-1 RC-595 BOL TEO CONNECTION 1 Boltcon Bolt1 VT-2 L-003A-5 100021 BC-1Sl-20 BOL TEO CONNECTION 1 Boltcon Bolt1 VT-2 02228-5 100022 BC-181-21 SOL TED CONNECTION 1 Boltcon Bolt1 VT-2 0220C-5 100023 BC-151-22 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 02238-5 100024 BC-181-23 BOL TEO CONNECTION 1 Boltcon Bolt1 VT-2 0375E-5 100025 BC-151-24 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0375F-7 100026 BC-1Sl-25 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0375C-5 100030 BC-LCV-1CH-460A BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0242A-3 100031 BC-LCV-1 CH-4608 BOLTED CONNECTION 1 Bolte on Bolt1 VT-2 0242A-3 100032 BC-1CH-32 80L TED CONNECTION 1 Boltcon Bolt1 VT-2 0253A-4 Page Al-1
APPENDIX I 1R24 COMPLETED CODE EXAMS Sum No. Component ID Description Class Category Item No. Method lso No. 100033 BC-RC-E-1A-Pri Manways BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 E-001N-5 100034 BC-RC-E-1 B-Pri Manways BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 E-001N-5 100035 BC-RC-E-1C-Pri Manways BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 E-001N-5 100038 BC-1Sl-51 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0106A-5 100039 BC-181-52 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 01078-3 100040 BC-1Sl-53 BOLTED CONNECTION Boltcon Bolt1 VT-2 01088-5 100052 BC-RV-1RC-551A BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 03508-4 100053 BC-RV-1RC-551 B BOLTED CONNECTION 1 Bolte on Bolt1 VT-2 03508-4 100054 BC-RV-1 RC-551 C BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 03508-4 100055 BC-MOV-1 RC-535 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0350A-3 100056 BC-MOV-1 RC-536 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0350A-3 100057 BC-MOV-1 RC-537 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0350A-3 100058 BC-PCV-1 RC-456 BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0350A-3 100059 BC-PCV-1 RC-455C BOLTED CONNECTION 1 Bolte on Bolt1 VT*2 0350A-3 100060 BC-PCV-1RC-455D BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 0350A-3 100061 BC-PZR Manway bolts SOL TED CONNECTION 1 Boltcon Bolt1 VT-2 E-001P-3 100062 BC-RV Main Fig Bolts BOLTED CONNECTION 1 Boltcon Bolt1 VT-2 E-001L-1 154800 RC-R-1-UG-01 TO 19 THREADS IN FLG_ 1 B-G-1 86.40 UT E-0018-2 156700 RC-R-1-LIG-20 TO 38 THREADS IN FLG_ 1 B-G-1 86.40 UT E-0018-2 158600 RC-R-1-LIG-39 TO 58 THREADS IN FLG. 1 B-G-1 86.40 UT E-0018-2 221700 MOV-RC-595-83-25 TO 48 BOLTING 1 B-G-1 86.210 UT E-002A-1 Class 1 Pipe Supports (VT-3) 144900 DL W-LOOP2-8-HSS-103 SNUBBER F-A F1.10N VT-3 09998-2 145000 DLW-LOOP2-8-HSS-104 SNUBBER 1 F-A F1.10N VT-3 09998-2 152900 RC-ES-1 NEUTRON SHIELD TANK/SKIRT 1 F-A F1.40E VT-3 E-001A-3 Class 1 RI-ISi Piping VT-2 Exams 020650 CH-047 RHSI SEGMENT 1 R-A R1.12 VT-2 0242A-3 033350 CH-102 RI-ISi SEGMENT 1 R-A R1.12 VT-2 0246A-3 036750 CH-103 RI-ISi SEGMENT 1 R-A R1.12 VT-2 0247A-3 040050 CH-104 RI-ISi SEGMENT 1 R-A R1.12 VT-2 0248A-4 069650 CH-043 RI-ISi SEGMENT 1 R-A R1.12 VT-2 0254A-4 085450 RC-056 RI-ISi SEGMENT 1 R-A R1.12 VT-2 03480-1 Page Al-2
APPENDIX I 1R24 COMPLETED CODE EXAMS Sum No. Component ID Description Class Category Item No. Method lso No. 136450 RC-017 RI-ISi SEGMENT 1 R-A R1.12 Vf-2 0375A-5 137250 RC-018 RI-ISi SEGMENT 1 R-A R1.12 Vf-2 0358A-5 138650 RC-019 RI-ISi SEGMENT 1 R*A R1.12 vr-2 0359A-5 267350 RC-057 RI-ISi SEGMENT 1 R-A R1.12 Vf-2 L-003A-5 Class 2 Welded Attachments (PT) 398000 Sl-82-2-A-04 WELDED A TT SUPPORT PS-R-10 2 C-C C3.20 PT 0192A-6 587500 CH-P-1B-A-01 WELDED ATT SUPPORT WS-4 2 C-C C3.30 PT E-003H-4 899320 QS-2-38-A-01 WELDED ATT SUPPORT R-230 2 C-C C3.20 PT 0111C-3 Class 2 Pipe Supports (VT -3) 371200 WFPD-23-3-HSS-208A SNUBBER 2 F-A F1.20N Vf-3 00628-6 371500 WFPD-23-3-HSS-208 SNUBBER 2 F-A F1.20N Vf-3 00626-6 398100 Sl-82-PS-R-10 SUPPORT 2 F-A F1.20R Vf-3 0192A-6 401600 Sl-83-PS-R-20 SUPPORT 2 F-A F1.20R Vf-3 0192A-6 421400 CH-79-PS-R-12 SUPPORT 2 F-A F1.20R Vf-3 0265A-7 614500 Sl-2-R-170 SUPPORT 2 F-A F1.20R Vf-3 0083C-6 686500 RC-E-1A-SUP-1 UPPER RESTR ASSEMBLY 2 F-A F1.40E Vf-3 E-001N-5 Class 2 RI-ISi piping (VT-2) 397750 Sl-051A RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0192A-6 420150 CH-021C RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0265A-7 420250 CH-0218 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0265A-7 422650 CH-0208 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0265A-7 422750 CH-020C RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0265A-7 425050 CH-0198 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0265A-7 425250 CH-019C RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0265A-7 436050 CH-121 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0267A-5 440050 CH-122 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0267A-5 443850 CH-123 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0267A-5 470350 CH-130 RI-ISi SEGMENT 2 R-A R1.12 vr-2 0268A-5 509250 CH-028 RI-ISi SEGMENT 2 R-A R1.12 vr-2 0273A-3 707550 RH-009 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0075A-5 709250 RH-004 RI-ISi SEGMENT 2 R-A R1.12 Vf-2 0075A-5 Page Al-3
APPENDIX I 1R24 COMPLETED CODE EXAMS Sum No. Component ID Description Class Category Item No. Method lso No. 711650 RH-13-1-F-02 RI-ISi SEGMENT 2 R-A R1.12 VT-2 00758-3 713850 RH-024 RI-ISi SEGMENT 2 R-A R1.12 VT-2 0207A-3 913870 CH-120 RI-ISi SEGMENT 2 R-A R1.12 VT-2 01708-3 914850 CH..051 RI-ISi SEGMENT 2 R-A R1.12 VT-2 1254A-4 916250 CH-050A RI-ISi SEGMENT 2 R-A R1.12 VT-2 1254A-4 929500 CH-095 RI-ISi SEGMENT 2 R-A R1.12 VT-2 1518A-1 929600 CH-096 RI-ISi SEGMENT 2 R-A R1.12 VT-2 1538A-1 929700 CH-097 RI-ISi SEGMENT 2 R-A R1.12 VT-2 1510A-1 Class 3 Supports {Vf-3) 875500 WR-9-HSS-313 SNUBBER 3 F-A F1.30N VT-3 0068A-4 893760 WR-P-1A-RSTR-2 PUMP SUPPORT 3 F-A F1.40P VT-3 E-010A-1 IWEllWL Exams 930000 1CNMT-LINER CONTAINMENT LINER MC E-A E1.11 GV 930100 1 CNMT-MOISTBARR MOISTURE BARRIER MC E-A E1.30 GV 930010 1 CNMT-LINER-AREA-3 CONTAINMENT LINER MC E-A E1.11 UTT 930020 1CNMT-LINER-1R22 1 R22 THROUGH WALL NIA NIA NIA UTT 930400 1 CNMT-CONCRETE CONTAINMENT CONCRETE cc L-A L1.10 GV Page Al-4
APPENDIX II REPAIR/REPLACEMENT ABSTRACT AND NIS-2FORMS
INTENTIONALLY BLANK PAGE
REPAIR I REPLACEMENT ABSTRACT FORM NO. FUNCnONALLOCAnON ORDER NO. COMMENTS 3253 1RW-128 200666536 Corrected 3554 1RC-E-1A 47623378 Installed 3555 1RC-E-1B 47623378 Installed 3556 1RC-E-1C 47623378 Installed 3562 1RC-58 200398414 Removed 3564 1RC-238 200482469 Removed 3585 1WR-P-1A 200530365 Corrected 3799 2.5"QS-85-153A-Q3 200589774 Installed 3799 4 "QS-92-153A-Q3 200589774 Installed 3799 1QS-210 200589774 Installed 3866 2"CH-42-153W-03 200590731 Corrected 3866 2"CH-40-153W-Q3 200590731 Installed 3866 1CH-117 200590731 Installed 3873 CH-41 200590730 Corrected 3873 CH-36 200590730 Installed 3873 1CH-113 200590730 Installed 3885 RV-1CH-257 200589721 Corrected 3889 HCV-1CH-105 200638196 Corrected 3890 RC-150 200643802 Corrected 3897 1RW-185 200553517 Installed 3898 1RW-186 200584866 Installed 3899 WR-66 200454935 Removed 3900 WR-8 200589778 Corrected 3900 WR-111 200589778 Installed 3900 WR-112 200589778 Installed 3900 WR-114 200589778 Installed 3900 1RW-971 200589778 Installed 3900 1RW-973 200589778 Installed 3900 1RW-970 200589778 Installed 3900 1RW-972 200589778 Installed 3902 1RS-E-1A 200645626 Corrected 3904 1RS-E-1C 200645628 Corrected 3907 1RC-12 200398396 Removed 3910 1RC-38 200398407 Removed 3915 MOV-1RW-102C2 200418391 Installed 3917 SV-1MS-101A 200646446 Installed 3918 SV-1MS-102A 200646694 Installed 3919 SV-1MS-103A 200646447 Installed 3920 SV-1MS-104A 200646448 Installed 3921 SV-1MS-105A 200646449 Installed 3922 RV-1CH-203 200647290 Installed 3923 VS-357-1 200648689 Installed 3924 Sl-HSS-522 200648678 Installed 3925 Sl-HSS-523A 200646679 Installed Page 1of2
FORM NO. 3926 3928 3929 3929 3930 3936 3942 3943 3944 3945 3948 3952 3959 3959 3968 3974 3975 3976 3977 3977 3977 3977 3977 3978 3978 3978 3978 3978 3983 3985 REPAIR f REPLACEMENT ABSTRACT FUNCTIONAL LOCATION Sl-HSS-5238 PS-244-VS-1 3"-Sl-321-153A-02 1Sl-88 TV-1 MS-105A TV-1MS-105B WR-HSS-309 RC-HSS-1 RC-HSS-2 RH-HSS-113 Sl-HSS-512 RV-1RC-551B WAPD-64 1FW-83 1RH-E-1A PCV-1RC-455A WR-20 WR-20 AOV-1 EE-217 INJ-1EE-2A 1.5"-ASC-230-MFR-03 ASC-229-PSR-3 ASC-230-PSR-1 AOV-1 EE-218 INJ-1EE-2B 1.5"-ASC-235-MFG-03 ASC-234-PSR-3 ASC-235-PSR-1 REJ-1 RW-27 A RV-1FW-155 ORDER NO. 200648677 200648690 200648689 200648689 200579805 200579830 200648706 200648692 200648693 200648699 200477725 200643912 200571938 200571938 200646202 200651450 200692196 200692287 200687690 200687690 200687690 200687690 200687690 200687688 200687688 200687688 200687688 200687688 200643918 200643946 Page 2 of 2 COMMENTS Installed Installed Corrected Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Corrected Corrected Corrected Corrected Installed Installed Corrected Corrected Corrected Installed Installed Corrected Corrected Corrected Installed Corrected
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3253
- 1. Owner FirstEnerg:t Nuclear Oi;ierating Com12an)!
(NAME) I Date November 10. 2016 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant l}aver Valle:t: Power Station (BVPS}
(NAME) P.O. Box 4, ShiQQing12ort, PA 150n Order #200666536 (ADDRESS) Repar/Replacement Orgenlzation P.O. No., Job No., ete.
- 3. Work Performed By BVPS Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shi1212ing12ort, PA 15077 Authorization No. NIA (ADDRESS) ---~***--*--*-*------~~---~---* -"'- _,.. ____. Expiration Date NIA . ---*---~.-~ -*--*~
- 4. Identification of System River Water (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1
.12§I..Edition, S'71 Addenda, Code Case= (b) Appllcable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. ldentification-ef.Gomponent-s----*- * ~
Corrected, National
- Removed, ASME Name of Name of Manufacturer
-Board Other Year or Code Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No) Ball Valve BNL Industries 8021016-1-2 NIA 1RW-128 2003 Corrected No End Piece BNL Industries NIA NIA Trace Code: 2010 Installed No 04729 Pipe, 6" NPS Energy & NIA N/A Ht. 2004 Installed No Process
- 811818M01 Flange, 6" Energy &
NIA NIA Ht #8578 2002 Installed No NPS Process
- 7. Description of Work Re12laced valve end 12ieces1 [:!iQe, and ~i!lQ§
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure [gl ExemptD Other D Pressure psi Test Temp. <>F Page 1of2
FORM NIS*2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC.5703-02 Rev. 02 Re ort Number 3253 "Record test pressun> and temperature
- 9. Remarks No Code Data Report available. Previous NIS-2 Data Report No. 1571.
Applicable Manufacture(e Data Repo~* to be attached CERTIFICATE OF COMPLIANCE I certify thalthe statement$ ma.de_ in. the. report are correct a.nd that this conforms to the requirements of th~_A$ME;_ Code, Section XI.
- 1yp~oorrsymM1-Stamp~~1A~*--_-_------------
Certificate of Authorization No. Signed Thomas White Owner or Owner' Expiration Date En ineer V Date November 1 Qth Title CERTIFICATE OF INSERVICE INSPECTION N/A J 20...:.;16..____ I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boller Inspection and Insurance Company of Connecticut of 1 Hartford, CT have inspected the components described in this Owner's Report during the period I ..)....._ ). ).. ~IS to 11-J f'"-( '1 , and state that to the best of my knowledge and belief, the I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection. -~'------"-_,J_ _ _,.-J=>"'-'Vl...,.' J-=, .......,.;_ ___ Commission..... cJ,..._.,...,d_.9..,..V.._il--.....___f"'-=-,A.-.d:--='.z;;J=------ lnspecto~nature National Board Number and Endorsement Date _ __.__/ l._-_f_.J_-_.. ___, 20 ti_ Page2 of 2 I I I I I I I I I I
( -."'{ FORM NIS*2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703-42 Rev. 02 RMort Nllll'lber 31554
- 1. Owner First Energ!l Nuclyr Oi;ieratlng C2m~nv I 0ate 10-12-16 CNAME) 76 South Main St!lH!t -Akmo1 QI:! 44308 Sheet 1
of 1 (ADDRESS) Unit No. 1
- 2. Plant B§aver Valle!£ Power StatiQn (BVPS}
(NAME) P.O. Box 4, Shioelngno!l. ~a 15077 Westingbouse PO 4762~37§ (ADDRE8$l ~- OrpnbtationP.O. No.. Jell No.,.cc.
- 3. Work Performed By Techai~I §~~1'1.l (;!Jginiirlng Type Code Symbol Stamp NlA (NAME) e.o. BQ}l 4, §b1Q!;!{D9R!:Art; PA 15077 (ADDRESS)
Authorization No. N/6 Expiration Date NIA
- 4. ldentifJCatlon of System B.uctor Qoo~nt
- 5. {*) Appllaable Conttrllotion Code ASM& Section Ill 89 EdlHon,.J:il2 Addenda, Code C88e l:j[A (b)
Applk:able Edition of Section XI Utlllzed ftlr Repair/Replacement Activity 2001 Ftf!lion. 2003 Addenda (o) Appllcable Section XI Code Case(&): ~
- 6. ldentif1CBtion of Components Coirected, National
- Removed, ASME Nameaf Name of Manufacturer Board other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) 1RC*E-1A Westinghouse NP030651/ 82 NIA 2005 Installed Yes 1MB2
- 7. Description of Work:
l!J§fal~ welded insert Qlates lnto the 4.0" insoection 2orts in lfeu of gaskets 2 IQfddis}!JS Rfl[ §~ (l;Ql:*1 §:QjH7l, tl!2 tl.!12§.1 rggl:!I~ 2!uggin9.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic" D Nominal Operating Pressure 181 ExemptD OtherO Pressure psi TestTemo. "F
FORM NIS~2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY J At. Required by ll'le Provisions of the ASME Code Section XI ( NOP-CC-6703-02 Rev. 02 Report Number 3!1!14 -Racardleo!l presaUlll and tenperatute
- 9. Remarks: Prima!}'. side work orders - 200504313, 200504323. lnsta~ed two ~ri!!!lil!X m§mY§I ga§kets A?pilcable ManllfQclurer's Data Reports IO Ile ellSellec!
S!oond&!X side work orders - 2Q0643885 & iQQa~~§31. Installed four§" hand ho!~ gaskets and welded two iaseci n1ates intQ the~.. ios~ction ~on§. CERTIFICATE OF COMPLIANCE I certify that ttie statements made In the report are correct and that this conforms to the requirements of the ASME COde~ Section XJ.
- Type Code Symbol stamp NIA Certificate of Authorization No.
NIA Expiration Date NJA G.D. Albert\\ SG !nle!ilMQr.* \\~ Signed: Date 10/12 I /201§__ Owner or Owner's Deslgnee, T~ I \\ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Be>ll&r and Pressure Vessel Inspectors and employed by The Har!fgcg filfiWD Boiler lns~ction aad Insurance ComRan:t of Connecticut of Hi!rtford, CT have Inspected the components described in this Owner's Report during the period s--e.,J.-/.J to /a -1.1-/ c , and stale that to the besl of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance With the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected wilh this inspection. Je.-, J#-- Commission Jtf? £:""-f If-,.I _r<f" rns;Jecto~ National Board Number and Endorsement Date /G -/)- 20 ff, ~...
FORM NIS-2 OWNER'S REPORT FOR Rl!PAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Cude Section XI NOP.CC-5703-02 Rev. 02 ReDOft Number 3!i5!i
- 1. Owner Fi!Jt En~rg~ Nuclear O~a!!tilJg ComMnlt'.
I Date 10-12-16 (NAME) 76 §oyth Maio Streit -Akron, OH 443Q§ Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Bea~r Vi!Hex Power Statioa tBVP§)
!HAMEi P.O. aox4, Shiiing1;10!1, PA 1507Z W!§tlnghouse PO 47623378 tADbR ) ~aammil OrQWl!mlkm P.O. No.. Job No., tlb;;.
- 3. Work Performed By I~hnlcal ServlQti 51l91Dndag (HAMEi Type Code Symbol Stamp N/8 P.O. BQX 4, Sbigr,:!ingR.Qrt. PA 15QZZ Authorization No.
Nl8 (ADCRE88) Expiration Date NIA
- 4. Identification of System Beacto[ Q2olant
- 5. (a) Applcable Constructloo Code ASME Section Ill
,ti Edition, -1!!! Addenda, Code Case WA (b) Applicable Edition of Section XI Utillzed for Repair/Replacement Actllllty 2001 Edition 2003 8ddenda (c) Applicable Section XI Code Case(a): N.IA
- 6. ldentlficalion of components Corrected.
National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed Ne& or No) 1RC-E-1B Westinghouse NP0306S11 83 NIA 2005 Installed Yes 2MB2
- 7. Description of Worl<: Reelaced R[:imaty mi!nwa:i: hot leg nut #4, hot !Ba studs #5 and #11. Installed w~ldeg lasert
!2lilil IDl!Ulll ~.Q" IDIWil.~IQD Rmts in ljey Qf g11ls.m, 2 locatioos e1r SG (ECf:-:Hi-0347}. No tubes reguired elugglag,
- 8. Tests Conducted:
Hydrostatic'* D Pneumatic" D Nomrnal Operating Pressure 181 ExemptO OtnerO Pressure psi Test Temp. <>f
FORM NIS-2 OWNER*S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Coda Section XI NOP-CC-5703-02 Re11. 02 Reoort Number 3!Wi 'Reccird lest """'"""'Md lemperstUM
- 9. Remarks: fcimar~ side work orders* 200504319, 200509019. Installed two Qrima!I manwai gaskets ApplioMIB Manulacl....,r'* Dato Repo!!e !o be lllta:hod S!iJr&D!:li.!~ side work orders - 20064369i, 200643928, & 200643832. ln!fall!i!d fouc 6" ha[ld hgle gaskets, two seconda~ manwaj'. gaslllcable Edition or section XI Utilized for Repair/Replacement Activity 2001 Edition. 2003 8ddenda (c)
Appllceble Section XI Code Cass(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Otller Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No} 1RC-c-1C Westinghouse NP030651/ 84 NIA 2005 Installed Yes 3MB2
- 7. Description of Work: Re12laced 12rima[l! manwai hot leg stud #8 i!ng ~kl~ §tyg '112. Installed welded insert el11tu into tt!e ~Mr inSl2i!!iitlOn 122!:11 i!l lieu Qf gasket§. 2 IQQ!i!~Qn§ 12i!;[ §!:Z (sQe-j §::.Q;M7). Ng b,!bes regulr!Q elyggiQg.
B. Tests Conducted: Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure l8I ExemptO OtherD Pressure psi Test Temp. OF
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provision& of the ASME Code Section XI NOP-CC-5103.02 Rev. 02 Reoort Number 3fll:A
- Raoord IC$1,...,oillJl'e end lenQlereturo
- 9. Remarks: Primi)!)'. §jge wo!:!S gf!i!s ~ 200504321, 200509020. Installed two i;irimaix manwa~ gask§ts Apillfclll:lle Menufilclurllr'll Da!aR..... to be stlaltllld SecondaQ:: §ide work orders - 200643893 & 20064~~33. Installed four 6" hand hole gail9!!!& ~Dd m!lded two iD~ oliltmi iatg lll~ ~.. io1121!al21:1 12Q!:1i-CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of lhe ASME Code, Section XI.
Type Code Symbol Stamp NIA Certificate of Authorization No. NIA Expiration Date N/A G.D,-SGProlectM!lr. ~~ Signed: Date 10112
- /20.1.§.__
owner or Owner's Designee:"" TIU CERTIFICATE OF INSERVICE -INSPECTION I, the undersigned, holding a valid commlSsion Issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Th! Hartford Steam Boiler lnsP!f!ioll io2 !nsuran!,i!."!;!!l!lli!"~ of Conaecticut of Hartforg, ~T have inspected the components described In this Owner's Report during the period s--~)--(..r to t_d~f1-L.' . and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concernrng the examinations and corrective measures described In this Owner's Report. Furthermore, neither tile inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection. ,JL...JJt:* L CommissiOn,J,/ 7<tJ.'l i'f,..l:z:-,ef lns~Slgnature National Board Number and Endorsement Date t:.. ~ "-I' l. ~ '20 Lf_
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3562
- 1. Owner FirstEnerg)'. Nuclear 0Qerating Comgan~
I Date October 21, 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valle~ Power Station (BVPS)
(NAME) P.O. Box 4, ShiQ(,!ing12Qrt, PA 15077 Order #200398414 (ADDRESS) Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
P.O. Box 4, ShiQQinggort, PA 15077 I Authorization No. NIA (ADDRESS) Expiration Date _.. N/A
- 4. Identification of System Reactor Coolant {01 l
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition. S'71 Addenda, Code Case --
(b) Applicable Edition of Section XI Ullllzed for Repair/Replacement Activity 2001 E-2003A (C) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components *-
Corrected, National
- Removed, ASME Name of.
Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No. No. Identification ~ Installed !Yes or No) Globe Valve Rockwell N/A N/A 1RC-58 1976* Removed No International Pipe,%" NPS Energy & NIA NIA Ht. #539092 2016 Installed No Process Cap,%" NPS Energy & NIA N/A Ht. #JXR 2015 Installed No Process
- 7. Description of Work Removeg valve aad installed eiee and ca12.
- 8. Tests Conducted:
Hydrostatic* 0 Pneumatic* D Nominal Operating Pressure 0 Exempt 181 Other 0 Pressure psi Test Temp. OF Page 1 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC.5703..02 Rev. 02 Report Number 3562 T 'Record test pressure and temperature
- 9. Remarks No Code Data Rei;iort available. *Year Qlaced in service.
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE 1 c;ertjfy ttia_t ttie statements. m_ade in the report are correct and that this conforms to the requirements of the ASMI; Code, Section XI. . --ry-pe-Coae Symbo1*stamp-- NIA --~- Certificate of Authorization No. NIA Expiration Date NIA Signed Thomas M Calko, Engineer Ill c ~.JI~ Date October 21 51, 20 16 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler lns12ection and Insurance Com12anl( of Connecticut of I Hartford CT have inspected the components described in this Owner's Report during the period I s -,}.d...,.. L.J-to /0 -,)_/-/ (:, , and state that to the best of my knowledge and belief, the I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance I I with the requirements of the ASME Code, Section XL I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. r ~J.2J I Commission ~ P7 fY cJ-Y- /I.,.) :i:-fi I I Inspect~ Signature National Board Number and Endorsement I Date LSJ--J.l-20 I C::. Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5!03-02 Rev. 02 Reoort Number 3564
- 1. Owner FirstEnergy: Nuclear O(?!rating ComQany:
f.oate Oi;:tober 20, 2Q:l 6 (NAME) 76 South Main Street-Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valley: Power Station (BVPS}
(NAME) P.O. Box 4, ShiQgingQort, PA 15077 Order #200482459 (ADDRESS) Repair/Replaoement Orgarii2:alion P.O. No., Jab No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NM4E)
P.O. Box 4, Shigging12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date***
- NIA
"*"*****~ ~-
- 4. Identification of System Reactor Coolant (Q1)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case =
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E*2003A (c) Applicable Section XI Code Case(s): NIA
- 5. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Installed (Yes or No) Globe Valve Rockwell NIA NIA 1RC-238 1976* Removed No International Cap,%" NPS Energy & N/A NIA Ht. #258999 2016 Installed No Process I i
- 7. Desc,ription of Work Removed valve and installed caQ.
B. Tests Conducted: Hydrostatic* D Pneumatic* D Nominal Operating Pressure 0 Exempt [81 Other 0 Pressure psi Test Temp. OF 'Record test pre>>Ure and temperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3564
- 9. Remarks No Code Data Report available. *-vear placed into service.
Applicable Manufacturer's Dale Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the req~irements of the ASME Code, Section XI. Type Code Symbol Stamp.._N""'"/A....._ _________ Certificate of Authorization No. '20~16~- CERTIFICATE OF INSERVICE INSPECT.JON... I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period I J-- dl-a! - / r to /I -,A. I-I k , and state that to the best of my knowledge and belief, the I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _....~-~-d_.._._~r;--= ~~......_/ ____ Commission rflf4'J-[T d,...,1:r..fl lnspe~ National Board Number and Endorsement Date _..._l_O_~ _..l_I_-____ _ 20!..L_ Page 2 of2 I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions oHhe ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3585
- 1. Owner FirstEnerg)l Nuclear O~rating Comi;ian)l I Date February 24. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1
of +z ~ 1,&J-. (ADDRESS) Unit No. 1
- 2. Plant Beaver Valle)l Power Station (BVPS}
(NAME) P.O. Box 4, Shii;i12ing12ort, PA 15077 Work Order 200530365 (ADDRESS) RepairlReplecemenl Organizalion P.O. No., Job No., etc.
- 3. Work Performed By BVPS Maintenance Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shi1212ing12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System River Water (03}
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Pump Johnston 01JC1702S NIA 1WR-P-1A 2001 Corrected No Pump Suction Bell Johnston NIA N/A Mtl. #100057354, 2002 Installed No Pump PIN 504600604001 Discharge Johnston NIA NIA MU. #100057354, 2002 Installed No Bowl Pump PIN 504600605001 Bottom Johnston NIA NIA Mtl. 2002 Installed No Column Pump
- 100089717 Intermediate Johnston NIA NIA Mtl.
2002 Installed No Columns Pump
- 100089720 Top Column Johnston NIA NIA Mtl.
2002 Installed No Pump
- 100089718 Page 1of3
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 RePOrt Number 3585 Seal Box Sulzer Pump 10896009 NIA Ht. #9115 2015 Installed No Seal Gland Sulzer Pump NIA NIA Ht. #33029 2015 Installed No w x 1-112" Nova Machine NIA NIA CR206060 2011 Installed No Capscrew 1" Nut Nova Machine NIA NIA Ht. Code 2014 Installed No 0554 1" x 2-314" Nova Machine NIA NIA Ht. #87071-2000 Installed No Bolt RRT 1" x 4" Bolt Nova Machine NIA NIA Ht. #OF17 2013 Installed No 718" X 2-112n Trust NIA N/A Ht. #M37482 2012 Installed No Bolt Manufacturing 1" Stud Nova Machine NIA NIA Trace Code 2014 Installed No 9560 %" x2-1/2" Nova Machine NIA N/A Trace Code 2014 Installed No Bolt 05X8 %"Nut Nova Machine NIA N/A 5Y02 2011 Installed No
- 7. Description of Work Overhauled ~um12 b~ reglil!cing: Suction Bell, Discharge Bowl, Columns, Seal Box, Studs and Nuts.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure ~ ExemptO Other D Pressure --- psi Test Temp. -- OF 'Record test preseure end temperalure
- 9. Remarks No Cgde Oat~ R~12orts available. Previous NIS-2 Data Rei;;iort No. 3163. The Suction Bell, Discbarge Bowl, Applicable Manufacturer's Date Repone to be attached and tb~ Columns lT012. Intermediate, Bottom} w~re removed from the 1WR-P-1C location (work Orger #2003i!5849} and re-used on 1WR-P-1A. The Discharge Bowl was weld rei;iaired b;t Sulzer Pum(2s under PO 45448328. The bottom and inte[mediate 12umg ~olymns were weld re1;2ai~d b¥ BVPS under work Orders 200594284 & 200594285 (see NIS-2 #3726}.
Page 2 of 3
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 585 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp..;.N=/A:..;._ __________ _ Expiration Date NIA '20...:..16~- CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Conneticut of Hartford, CT have inspected the components described in this Owner's Report during the period S-- J. J- -r S-to ,L -,J..J- / 0 , and state that to the best of my knowledge and belief, the Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Commission ~I' f'f)..';f ;1-4I.t1 National Board Number and Endorsement Date ---""ol=--..;.tJ.._J""":_-___ _ 20 /b Page 3 of 3
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3799 I Date November 30 2016
- 1. Owner FirstEnergl£ Nuclear Ogerating Com12anl£ (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1
of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Vallel£ Power Station (BVPS)
(NAME) P.O. Box4, Shigginggort, PA 15077 Order#2005R9774 (ADDRESS) Repair/Replacemenf Organization t".U. No., Job No., etc.
- 3. WorkPerformed.By. BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Box4, Shigging12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA -~ ~
~-~------
~~*
- -*-----~--.
- 4. Identification of System Containment Depressurization Sl£stem, BV-1-13-System CQ3)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S '71 Addenda, Code Case =
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Editjon to 2003 Addenda (c) Applicable Section XI Code Case(s): NIA
- 6. -ldentificatlon-of-GemponeAts------~---- - - --
-~ ---**-***-- Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other
- Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Pipe Cap Energy & NIA N/A Heat# 2008 Removed No Process 247870 Pipeline First Energy NIA NIA 2.S"QS 2016 Installed No 153A-03 Reducer Taylor Forge NIA NIA Heat# 2016 Installed No Stainless NADG-2 Pipeline First Energy NIA NIA 4"QS 2016 Installed No 153A-03 Ball Valve BNL Industries A141009-20-1 N/A Valve ID 2015 Installed Yes 108:-210
- 7. Description of Work Removed gi(!e ca[:! and installed reducer and ball valve for Flex Mod (!iging.
Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3799 . ~-~
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure CE:! ExemptO Other 0 Pressure psi TestTemp. OF "Record lest Pf11$Sure and temperature
- 9. Remarks Code Data Re~ort for the ball valve is attached to this NIS-2. Prior NIS-2 regort #3405. This ASME Section Ill valve is installed into a 831.1 line.
Applicable Manufacturers Data Reports to be attached CERTIFICATE OF COMPLIANCE I certifjlharth_e.staleme*nts*made in the report arecorrectaiidthattffis cbnforms to the requirementsOftfleASMF-Code, Section XL_ Type Code Symbol Stamp NIA ~---*--- - -£--ertificate-ofAuthorization-No. NIA------** -Expiration Date N/A-- Signed Tltotnas M Calko, Engineer ui:: ~
- jJ 4-0 5 Date Nov 30, 20.1§.
Owner or Owner's Designee, e -
- cl:RTIFICATE OF INSERVICE INSPECTION
--*--~- I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I and employed by The Hartford Steam Boiler lnsQection and Insurance Com(:!anY: of Connecticut of I HartfOrd, CT __ .ha~.e..inspected the components described In this Owner's Report during the per.iod -l~ F- ;i. )... - I.r to /()-.i..r-/b , and state that to the best of my knowledge and belief, the I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance I , I with the requirements_ of the ASME Code, Section XI. 1, I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~_/~~ I I Commission,../if J '(.,A f A-# :C el I lnsp~s Signature National Board Number and Endorsement I I Date I J-~ ;.. - ' 20 ~ Page2 of2
~ i j FORM NPV-1 CEfln:ICATE HOLDER'S DATA REPORT FOR NUCLEAR PUMPS OR VAi.YES* As Reqiahd iiv the Pro\\l!SiOM-or tti& AIME co.. Sectkln ** -DMll* ;-- Pg.1of_2_
- 1. Mlllvfoctured aind certified by ______
BNL 1N_OUSTR1 i::_s_1NC.-:-._3_0_1N.,.D....,U..,.6TRIAL_.,,,,,,,....PAR.,,,_K,..ROA,.,...,..,....,o_._ve_R1110 N_,_CT_060G6 __..,.._DINc.nffl--
- 2. Manufac:IUled tor ______
F_IR_ST_E_NERG v_SERlllC e_co_M_P_'A_N_v_. 7fl..,.,..SOUTH__,---,_MA_IN_S_TREET ._AKRON ._DH_44308 ........ -~"'~
- 3. location of lnr.tallatlon GEA\\IERVAL!.EY NUCLliM POWER pL.NfT,.1ROUTE188. SHIPPINQPORT, PA 15077
- 4. Madel No., Setlel No., or Typa ___
v_AL_ve ___ Orswins HBV-82-40-01 UI Rw. ___ c ___ CAN ------ S. ASME Oxte. Section Ill. Division 1 1971 W72 2 I. Pump or lllllve VALVE 4* ~----- NomlMl.inleisize, ______ ~tleUb------* --*--*--
- 7. Mllterill (1) valve Body SA:il8 TY !!HO ~6 Dllk SA:l78 ll.3J~ Bo111ng IM51QB f!8()
lbl pump Clling CG¥8t' Boldncl---- lbl Nalonal. lloard Ha. 21'H l*I Diak Serie I No. 416G
- SuplJlemen181 lnli:wmelion In the fonn of lilllS. &lletdle:s.. or d1a.M11g11 mtty bll uaed pl'Ollided: m sila Is B'h x 11; 121 lnfonn.etioa In llamll 1111niugh 4 on thi* Cati Repart II l1111ludlld on N;tillhN!;end 13> udleheetla numbered and thenumbllrof lllwflll la recon:flld otll'ietllpofd!llfllnn.
lO'l'/101 ttt'0S
______ J:ORM..Nt!Y.:-UBaclt-'8. 2 Qf_2_J
- s. Design conditions --......,.
1-i---..,--- C.11llica111 Holdar's Serial Ncl. A 1410CIJ..20.(1) ANSl150# --.,-~-__.,.- 1 __ 11r1111lwe pr-11re c:Qq -------------- 275 PSIG @100-F
- 10. Hydrorrtatlo test camFICA'iloN OF DESIGN Deslan Speclllcatron certified by John W. Dk111ler Oesllln Rupoit ceitlfl9dliy----------- -.
P..E.S111te __ IL_ R*g.no.064-038953
- -----F!l!. l!t8te-==..::.:: Fteg. no. ----
~~ OFCOMPu,ANl:f:. Wa aertlfy that the statement5 mada in thlll rspot! am GO<<ect and that dlia pump or valve conforms to the rule& for COl*Nlltion of the MIME Code. Section HI, Dlvialon 1. H ceruficate of A11tho1tmlon N11. _______ N_*288 _ 2 _______ &plres.~-----,-'_ 11_0120 16 _____ _ 0a1e sh.obs-Name Q?RT'IFICATE DI' INSPECTION I, the undersigned, holding _e_ v11Ud ~~'!'-~.O.!' 1i1su_ed by_lhfl Na~"' Bo~rd of_~_oller an<<t!tassure Vassel l11spec1ora and employed by ONECIS INSURANCE COMPANY of L vt4N, MA hove Inspected tha pump, or wlw, desoriblld in this Data Report on o/@f I Z0 , and 5Ud11 lhat to 11\\0 best of my knowledge and llelief, the Certifh:atu Holder ha. c:onstM:tlld th la pump. or veiw. in llCllDl'dance wltll lhe ASMI!! Code, Section Ill. Division 1. av eiQnlng ll!ia c:ertificlta nel1her the lnll'peCtor nor hla employer meiea :1111\\1 -rranty, expresaed or Implied, concerning the component deacribed In !his Dete Rtpcm. Furt.flermore, neidlllf d'111 lnspsior n11r hl1111mployer shaQ be l111ble In any manner for anv pe~ injury er property damage or a loss of any kind srlsing from or con.ls i plllltlon. Date 1'/to ll; Signed _ - tammlalllon _tJgti;..:.:;.;.~l'/h~l~A,.._.rJ~__,.,,.....,._-.--- ln1""'*'<) lNellolilflkmd_...,E~ . - - ~ - (01fl11
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3866
- 1. Owner FirstEnergl'. Nu~lear O~rating Co.
J Date 8-9-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station (BVPS}
(NAME) PO Box 4, Shigginggort, PA 15077 Order #200590731 (ADDRESS) Repair/Replacement OrganizsUon P.O. No., Job No., elc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shi(!ginggort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System Chemical Volume and Control System, BV-1-7-System, 03
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, §11 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addencla (C)
Applicable Section XI Code Case(s): tMti
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Stone and Pipe Line Pipe line Webster NIA NIA 2"CH 1978 Corrected No 153W-Q3 Pipe Line Pipe line First Energy NIA NIA 2"CH 2016 Installed No 153W-Q3 Tee, SS, 2", Valbruna NIA NIA Heat: G86 2008 Installed No Sch 40S Stainless Pipe, SS, 2", Pexco NIA NIA Heat 542230 2015 Installed No Sch 40S Valve, SS, 2" BNL Industries A141009-7-1 NIA 1CH-117 2015 Installed Yes
- 7. Description of Work Installed tee into e~isting line 2"CH-42-153W-03, created new 12i12e line 2"CH-40-153W-Q3, and installed new FLEX 12i12ing com12onents as identified above.
Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the ProVisions of the ASME Code Section XI NOP..CC-5703*02 Rev. 02 Rel'.)Ort Number 3886
- 8. Tests Conducted:
Hydrostatic" D Pneumatic" 0 Nominal Operating Pressure t8I ExemptO OtherO Pressure psi Test Temp. OF "Record lest pressure and temperature
- 9. Remarks ~ode data re1;?ort attached for ball valve 1CH-117. No griQr NIS-2 re1;1orts. ASME Section Ill Class 3 valve installed into an ANSI 831.1 system.
AnnrlCllbfe Manufacturer's Dela R""""* to b Bonnet/Cover Serial No. 470G I' 11 I! I I:
- I
- 1.
fe) Disk Serilll No. P190S
I ~eRHernr> con 1/~/t!M sll ?./~/,, FORM NPV-1 (Back-Pg. 2 of _2_J Certificate Holder's Serial N~A141 009-?-(1 THRU :2) I
- 8. 0.ign conditions --~:---.,.---
1-1 ANSlt# --..,,,--....,,..,,,-:---- or valve pre11SUre das& -------------- 1111mpen11111111 B. Cold working pr8$$Unt 276 PSIG @100"F 425 PSIG 320 PSIG
- 10. Hydro11t.110ctest -------. Diak clifferentiel test pre.ssure ----------------------
- 11. Rem11rb c:smFICA110N Of DaRGN Design Specification certified by ----=------Joh_n_w_._D_fnsle....__r _______ RE. State __
IL __ Repj no. 062-038953 Design Repo11 certified tJy P.E. Stam --- Reg.no. ~--- C&RTIFICAlE Of COMPLIANCE We certify that 1he llbdem11!'115 made In thi£ report are comi<< end thllt 1hl& ~ ar valw c:onform11 to the rules fat'1iionetruC11on of lhe ASME Code, Section Ill, Division 1. N-2882 11/1DIZ01B; N CeltH!cate d Authon"xatlon No. ---------------- Elcplres ---------~------ Name _____ B_N_L_INOU STR.l __ E_S-',_INC_. ____ 'Signed ~..,_ ~A!?) *, _:..: (ll~lloldttl --.. ~ CERTIFICATE OF INSPEC11QN I. the undersigned. holding a valld commission Issued by the National Board or!sor1er end Pn1SSure Vessel IN1pectorS ;nd employed by ONECIS INSURANCE COMP~ f) ot ___________ L_'l'NN_..... _MA _________ have lnspeCUd tl'8 pump, or wlw, dl!lllCribecl i"j1ttlr> Data Report on 11/r"'-/t T , end atm that to the best of mv knowledge and belief, 1he Certificete Holder has conatructed lthie pump, 0t wive, fn eccordam:u with the ASME Code, Section m, Dlvl&ion 1. ! I Bv signing tl\\ls certlflcatie.neither the irlsplll:IOI' nor his employer m11b!ti any waminty.;eicprelll!8d or implied. c:oncemlng the component de8cril:led in this Dita Report. Furthermore, neither the ~r nor his employer ehall be llabl!i In any manner for 11nv ptrsonal Injury p} pn:ipeny c:IBniage or 11 loa of any kind arising frol'll or connected wlttl thlS Inspection. I : Date ":r/te./erir Signed ~4. L ConvnlSlllon <<8 ?Zi'/ (,v. <<iJ ; ~lntpecmrl IKdanal ea.ti N--Sfn&r._,,eml I! I I l s 19 0 s
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3873
- 1. Owner Fir.1tEnergy ~uclear Ogerating Comg~ny I Date July 20. 2016 (NAME) 76 South Main Street - Akron, Otl 44308 Sheet 1
of 2 (ADDRESS) Unit No. 1
- 2. Plant B!i!aver Villey POWir Station (BVPS}
(NAME) P.O. Box 4, ShiBBinggort, PA 15Q77 Work Order #200590730 (ADDRESS) Repair/Replacement Organizalion P. 0. No,. Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Box 41 Shi121;2in912ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. ldenUfrcation of System Chemical and Volume Control (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S71 Addenda, Code Gase NIA (b) Applicable Edition of Section XI Utlllzed for Repair/Replacement Activity 2001 E-2003A (c)
Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Piping Stone & N/A NIA CH-41 1976 Corrected No Webster Piping FirstEnergy NIA N/A CH-36 2016 Installed No Tee, 2" NPS Energy & N/A N/A Ht. Code G86 2008 Installed No Process Pipe, 2" NPS Energy & NIA NIA Ht. #542230 2015 Installed No Process Ball Valve BNL Industries A141009-7-2 N/A 1CH-113 2015 Installed Yes
- 7. Description of Work Modified eiging b:i adding tee, 12iee and valve.
- 6. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure !:81 ExemptO Other D Pressure psi Test Temp. OF Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3873
- Record test pressure and tempera!ure
- 9. Remarks Code Data Report attached. ASME Section Ill Class 3 valve installed into an ANSI 831.1 system.
Applicable Manufa<:luref's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that th.is _conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp...:..N=/A_,__ _________ _ Certificate of Authorization No. Expiration Date ___ ..-N,,../A~---- CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Conneticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period I S--.il...Z -O-to 7-...t.;.... -I c;:. , and state that to the best of my knowledge and belief, the I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with is inspection. Date __ 2_--..6_..i:J-._.-____, 20 _/_,_ Page 2 of2 I I I I I I I I I I
- 38~ f J-:{,t EJQUBc;::p~ ee1rr 2'2/1s FORM NPV-1 CERTIFICATE HOLDER'S DATA REPORT FOR NUCLEAR PUMPS OR VALVES*
s i:s "!> / J.s-(.J-As Required by the Provisions of the ASME ~.Section Ill, Division 1 Pg.1 of 2
- 1. Manufactured and ce11lfled by ______
B_N_L_l_No_u_STR IES_l_NC_._. 3_0_1_ND_USTRW.._. P_AR_K_RO_AD_._VE_RNO N._CT_06006_.:...* ------ ln1111oand*-ofN-lloldetl ~ Manufucturedfvr -~------FIRS r_E_N_ER __ Gv_s_ER_VICE COM~_PANY_~*-76_s_o_Ulli~-MAl-N_STRE ET.....;..,.A_K_R_o_N_.o_H __ 443 QS~~----~ 1.........m-.. r~
- 3. locetion of inatalletion BEAVER VALLEY NUCLEAR POWEfil !>LANT, 1 ROUTE 188, SHIPPINGPORT, PA1 ~6077
--<ldchml
- 4. Modal No.,SmiesNo,.orType ___
v_:A.L:_vi: ___ Drawing HBV-A.2-20-0113 flev. 9 W't2
- 5. ASME Code. Se<<Ion Ill, Division 1 1971 3
(edillonl ll\\ddolld* (lf lpplicalol<tl tmtell
- 6. Pumporvalw __
v_AL_VE __ Nominal Inlet sl:te ___ r __ _ Outlet size ___ 2'--~
- 7. Material (lll wive Body SA-47fl TY 304 Bon~
lY;l0.4 Di,,i. SA-479 TY 304 Bolting SA.4Q3GB 660 tbl pump c.11111 Cover Bolti111---- (al O!rtlfiePI Holder's Serial No. A 141009-7-(1 THRU 2) lbl N~ Bollld No. !cl Body/CBlllng Serilll No. Id> 8onl'8t/tover Serial No. 470G j i I: I! lel Diak Serial No.
- Supplel'lllllftlll intou1111k111 In the fwl!J of lb, ~or drawln11& m11v be used provided: 111mla8Y.t x 11; 12J lnfDmlll1ian In il9m111 lb~h 4 cm thla Oata Repon 11 lnaluded on ~
etieei; and (3) 111ch llhHI Is 1111inbered end the number ot 1heet11 Is RC:IQflied in!tt-lllP lllf thl* form. l * (07/10) I* I i I* i' f P1:98S
FORM NPV-1flack-Pg.2°'_2_) Cel'tificate Hokler's Serial NojA141009-?-(i THRU 2) I
- 8. Oesignc:ondltion11 ---1,.._--, ---
ANSI 150# ---.------ orVlllve prassureclus -------.-.r-....------ lblmpenltullll
- 9. Cold working pressura v~ Peto @100"F 425 PSIG 320 PSIG
- 10. Hydrostatic test -------
- Disk differential teal: pressure --_..:.------------....:....------
- 11. Remarta CERTIFICATION OF DESIGN Desrgn Specification certified by ----'-----J_o_hn_w_. _Dlnsle_..._r _______ P.E. State __
IL __ Re~j no.062-038953 Design Report cartlfied by P.E. State --- !Wg. no. ---- CERTIRCATE OF COMPLIANCE We certify tl1*t the auteme;nts made In mis report 11111 eorrvct and that this pun1p er wive confonne IO the rules for14onstruct1on of the ASME Code, Sadlon IU, Division 1. N-2882 11/10/201~ ; NCertlflc:ateofAuthotlutionNo. ----------------~E:icpires----------;..;.._----- De1v 3()$1.. f\\"S Name _____ B_N_L_IND_US_,,_TRIES ,_, l_NC_. ----'Signed~ ....... ~ A!Q,, _..; IN~,_.,, -Drlmd __...,..,, CERT1FICAll! OF INSPECTIQN I, lt\\e underslgned, holding s vaUd commission Issued by the National Board or!aoller and Prasaure Vessel lnspecto~ (Ind employed by ONECIS INSURANCECoMP~ I j ot __________ L_YN_N..:.,_MA __________ have lnspecUd the pump, or valw, described inltfli& Data Report on 11/r&/t.r , ond 81llW that to the best Df my knowledge llnd belief, the Certificate Holder hea COflatructed id.ilo pump, or vatw, In eccoldence with 111111 ASME Coda, Section m, Dlllleion 1. ! I Sy llignlng this i:ertlflclltlll neither ihe lnspecror nor Ills employer makes any waminty,i8lq>re&ll8d or Implied, concemlng the component deBcrlbed in thie DlltB Report. Furdlennore, nelthetthe lnspuc;tor nor his employer shall be llebl; In env m*nner for eny perGOnal Injury~ property damage or a loss of any kind arising from or connec:ted wlttl this Inspection. I : Date '3/n./e,i~ Signed t!(t'~,F4_ L Commi~lon N'B 92,,9/ & KV ~ ~rlll9jlelftrt l!Ullanel~ Numberand~I 107/11) I! St98S
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3885
- 1. Owner Fjr§tEnecgli( Nyclear 01'.?§ratiog Co.
I Date 10-22-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant aeaver Vallei'. EOW§I: §iation (B~ESl (NAME)
PO Box 4, Shi[![!ing[!ort, PA 15077 Order#200589721 (ADDRESS) Repair/Replacement Organization P.O. N<>., Job No., etc.
- 3. Work Performed By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shi[!12ing12ort1 PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA ~ -* - -
- 4. Identification of System Chemical and Volume Control System. BV-1-07-Sj'.stem (02)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'72 Addenda, Code Case.f!llei (b)
Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case{&): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped ComDonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No)
- Valve, Crosby 51036 M2 NIA RV-1CH-1976 Corrected No Relief 257 Consolidated N94952 Heat#
Nozzle Power 0030 NIA 412736 2004 Installed No Supply... CIC C9FK
- 7. Descriotion of Work Reolaced nozzle in relief valve.
- 8. Tests Conducted:
Hydrostatic"' D Pneumatic"' D Nominal Operating Pressure D Exempt 1:81 Other D Pressure psi Test Temp. OF
- Record test prellsure and iemperatun:i
- 9. Remarks No Code Data Re12orts available. Prior NIS-2 data re~ort #1855.
"Mlicabte Manufac:h.nH's Data Reoorts to be alL!!lched Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703-02 Rev. 02 Reoort Number 3885 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp ~N~/A~----------- Certificate of Authorization No. N/A Expiration Date NIA Signed Thomas M Calko. Engineer Ill '<J ~ /fl ~--- Owner or Owner's Designee, Titie' Date Oct 22, 20.1§_ CERTIFICA T-E--OF-INSERVICE ~NSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Harttord. CT have inspected the components described in this Owner's Report during the period J' - ~e<. - / :> to / 6 - dL <{ - / (, , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrEJJCtiV.§l mea$1,!res_ g_e~cJi~P in_ttiis Owner's Report in accordancewith the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. -'~~-"----=_J::;;..,..._~ )~"""""'"'~"'"',"""""-----Commission A/JS 9W.f'" AA/f,d' inSPe~ National Board Number and Endorsement Date __ /~(J_-_Pl.~'-f_-____, 20 I h Page 2 of2 I I I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3889
- 1. Owner Fir§!Engm:t ~ug!ear O~raUag Q2m121a~
I Date March 30, 2016 (NAME) 76 South Main Stre~t - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valle~ Power Stiiiion (BVPS}
(NAME) P.O. BQ~ 4, Shiggingeort, PA 15077 Work Orger #200638196 (ADDRESS) Repair/Replacement Organization P.O. No., Job No., elc.
- 3. Work Performed By BVPS Maintenance Type Code Symbol Stamp N/A (NAME)
P.O. BOI!; 4, Shiggiageort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System Chemical and Volume Control (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, 8'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s):
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or Nol Globe Valve Masoneilan H-40684-1-4 NIA HCV-1CH-105 1976 Corrected No Nut, 5/8n Nova Machine N/A N/A Trace Code: 2016 Installed No 25P6
- 7. Description of Work Re12laced bod~/bonnet nuts
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure 0 Exempt 181 Other D Pressure psi Test Temp. OF 'Record lesl pressure and temperature Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3889
- 9. Remarks No Code Data Report available.
Applic.l!ble Manu!Bclurers Dala Reports lo be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp....;;.N=/A'--"------------ Certificate of Authorization No. Expiration Date NIA CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Conneticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period I S)- J.¢...-1 S-to 3-J I-I~ , and state that to the best of my knowledge and belief, the I I I I I I I I I I I I I I Owner has perfonned examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthennore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ~j):::....=::~=::!:::::...J::J.~..:..*...£;~~:L------ Commission µ8'/t/..2. '? ;t,.JI/!, National Board Number and Endorsement Date _;y __... _?_I_-_____, 20 1'_0_ Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3890
- 1. Owner FirstEnergll Nuclear O~rating Com12anll (NAME)
I Date November 1. 2016 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Vallell Power Station (BVPS)
(NAME) P.O. Box 4, Shi1212ing12ort, PA 150n Order #200643802 (ADDRESS) Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Mechanical Maintenan~
Type Code Symbol Stamp N/A (NAME) P.O. Box 4, ShiQQing12ort, PA 15077 Authorization No. N/A (ADDRESS)
- -Expiration*Oate*-**
N/A
~'
- --~~------
- 4. Identification of System Reactor Coolant (01)
- 5. (a) Applicable Construction Code ANSI 631.1 1967 Edition, 8'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Pipeline Stone & NIA NIA RC-150 1976* Corrected No Webster Flange,%" Energy & NIA N/A Ht. 2016 Installed No NPS Process
- 6421ANE4
- Fitting, Energy &
NIA NIA Ht. Nos.: EV7, 2016 Installed No %"x1/2" NPS Process GW2, EK2, DK4
- 7. Description of Work Re12laced flange and fitting.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure !8l Exempt D Other D Pressure psi Test Temp. OF Page1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3890 "Record test pressure and temperature
- 9. Remarks No Code Data Report available.
Applicable Manufacture~s Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the. r:eport are c::orr~i::t l!!nd tjiat tbi$ _conforms to the requirements of the ASME Code, Section XI. Certificate of Authorization No. Expiration Date ---""'"'N ..... IA_,__ ___ _ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period 1 .r-)...J.. ' /.r to / 6 -,,,U-:.. I{; , and state that to the best of my knowledge and belief, the I I Owner has periormed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. -~'---...;;;J~_,_* J-1:rO~*==Lc.p.,r.-_____ Commission -~.,....-.i_f....;</.-.J-__;;_f.;;...:l'f,__.J'T_:.£.--'8:::..--____ lnspefors Signature National Board Number and Endorsement Date I ( - I - 20 f b ~--~~~~-~~* ~~ Page 2 of2 I I I I I I I I I I I I
FORM NIS-2 OWNER.'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section X! NOP-CC-5703-02 Rev. 02 Report Number 3897
- 1. Owner FirstEnerg:t Nuclear OQerating Comganj'.
I Date October 15. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Be§!ver Vallel'. Power Statjon (BVE§}
(NAME) P.O. Box 4, ShiRQingQQrt, PA 15077 Order #200553517 (ADDRESS) RepaA'/Roplacemenl Or11anization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Servjces Type Code Symbol Stamp NIA (NAME)
P.O. Bgx 4, ShiRRinggort, PA 15077 (ADDRESS) Authorization No. NIA Expiration Date . -NIA _____ __ --* --.
- 4. Identification of System River Water (Q3)
- 5. (a) Applicable Construction Code ANSI B31.1 1967 Edition, S'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (C) Applicable Section XI Code Case{s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Butterfly Allis Chalmers NIA NIA 1RW-185 1976 Removed No Valve Butterfly Velan Valve 607802-1 NIA 1RW-185 2015 Installed No Valve 1-118" Stud Nova Machine NIA NIA Trace Code 2013 Installed No 0814 1-118" Stud Nova Machine NIA NIA Trace Code 2014 Installed No 9R09 1-118" Nut Nova Machine NIA NIA Trace Code 2014 Installed No OK12 1-118" Nut Nova Machine NIA NIA Trace Code 2013 Installed No 7N06
- 7. Description of Work Re121aced ~alve, and flange studs and nuts.
Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3897 --~ -*
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure [8J ExemptO Other D Pressure psi Test Temp. OF
- Record test pressure and temperature
- 9. Remarks No Code Data Re12ort available. Previous NIS-2 Data Re12ort #495. Year built of original valve is ~ear Applicable Mar.Jfaclurars Dala Repons to be attached 12la~d into service.
CERTIFICATE OF COMPLIANCE "~~-- ... I certify that the statements made in the report are correct and that this conforms to the-requirements-of the-ASME-Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorizatio~ Expiration Date NIA Nuclear Engineer V Date October 16 I 2016 Signed Thomas J Whit Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I and employed by The Hartford Steam Boiler lns12ection and lnsur@nce Com12an~ of Conneticut of 1 I Hartford CT have inspected the components described in this Owner's Report during the period I s -c)..,;). - /.r to /6 -.:i/-/" , and state that to the best of my knowledge and belief, the I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance I I with the requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~J. JV:A' I "1 t1 'Jv.)... 't' 4 ~.r A I Commission I lnspe~ Signature National Board Number and Endorsement I Date /O"J./- 20/' I Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3898
- 1. Owner FirstEnerg~ Nuclear 012erating Comgan}'.
I Date October 15. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valle}'. Power Station (BVPS)
(NAME) P.O. Box 4, Shi!;!Qinggort, PA 15077 Order #200584866 (ADDRESS) Repair/Replacement Organization P.O. Na., JDI> No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. BQX 4, Shlg12ing12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System RiverWater (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 1957 Edition, S'7~ Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Butterfly Allis Chalmers NIA NIA 1RW-186 1976 Removed No Valve Butterfly Velan Valve 640755-1 NIA 1RW-186 2016 Installed No Valve 1-118" Stud Nova Machine NIA NIA Trace Code 2013 Installed No 0814 1-118" Stud Nova Machine NIA NIA Trace Code 2014 Installed No 9R09 1-1/8" Nut Nova Machine NIA NIA Trace Code 2014 Installed No OK12 1-118" Nut Nova Machine NIA NIA Trace Code 2013 Installed No 7N06
- 7. Description of Work Re12laced valve, and flange studs and nuts.
Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3898
- 8. Tests Conducted:
Hydrostatic* 0 Pneumatic* 0 Nominal Operating Pressure [;8J ExemptO Other 0 Pressure ----- psi Test Temp. ------- °F "Record test preGSura af"<l lemperature
- 9. Remarks No Code Data Report available. Previous NIS-2 Data Report #496. Year built of original valve is year Applicable l\\lal'IUfacturer'* Data Reports to be attached placed into service.
CERTIFICATE OF COMPLIANCE -1 certify that the statements made in the report are correct and that this conforms to the requirements of theASME Code, Section XI. Type Code Symbol Stamp.... N .... IA ___________ _ Certificate of Authorization No. Expiration Date NIA Signed Nuclear En ineer V Date October 16 '20~16 __ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Stearn Boiler Inspection and Insurance Comoanv of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period 1 S:-)..J.- - IS-to ( d -,J.../ - I '1 , and state that to the best of my knowledge and belief, the I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed 9r implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. National Board Number and Endorsement Date / 0 -J.., ' 20.L.f_ Page 2 of 2 I I I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3899
- 1. Owner FirstEnergl'. Nuclear Oi;ierating Com12an~
I Date October 17, 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valle~ Power Station (BVPS)
(NAME) P.O. Box 4, Shi[!Qingi;iort, PA 15077 Order #200454935 (ADDRESS) RepsirlReplllcement Organization P.O. Ne., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Bgx 4, ShiQQingi;iort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System River Water (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, §:I1. Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Pipeline Stone & N/A NIA WR-66 1976* Removed No Webster Pipe, 2" NPS Energy & NIA NIA Ht. 2011 Installed No Process
- OOA115309 Cap, 2" NPS Dubose NIA NIA Ht. #9182 1998 Installed No National Energy I
I I I
- 7. Description of Work Removed sectioa of QiQe and installed two i;iii;i~ ~12§,
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure [8J ExemptO Other D Pressure psi Test Temp. OF Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Re ort Number 3899 'Record test pressure and temperature
- 9. Remarks No Code Data Report available. *Year built for original piping was year placed into service. Previous Applicable Manufacturer's Data Reports lo be attached NIS-2 Data Report No. 1173.
CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that.this. conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp _.N""'/A'-'------------- Certificate of Authorization No. Expiration Date NIA I 20~16~- CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford, CT have inspected the components described in this Owner's Report during the period r .L-J-.,,2..-/ r to / o - I ? - / t.. , and state that to the best of my knowledge and belief, the I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. -~'---,.,_.....,'--_J=--._-**) ....._'4_....* ......... *....__ _____ Commission tJ/j ? ¥ OL :?' /f,A).:C 4 in~OfiSSlin8ture National Board Number and Endorsement Date _ _../ 6 _-_/_f_~ ____, 20 I b Page 2 of 2 I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3900
- 1. Owner FirstEnergl'. t':!!uclear Oi;ierating Com12anJ'.
I Date October 17 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 4 (ADDRESS) Unit No. 1
- 2. Plant Beavir Valle:t Power Station {BVPS}
(NAME) P.O. Box 4, Shi12eing12ort, PA 15077 Order #200589778 (ADDRESS) Repair/Replacement Organlzalion P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
P.O. Box 4, Shigging12ort, PA 15Q77 Authorization No. NIA (ADDRESS) Expination Date NIA
- 4. Identification of System River Water (03)
- 5. (a) Applicable Construction Code ANSI 631.1 1967 Edition, 5'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E*2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code stamped Component Manufacturer Serial No.
No. Identification Built Installed <Yes or Nol Pipeline Stone & N/A NIA WR-8 1975* Corrected No Webster Pipeline FirstEnergy NIA NIA WR-111 2016 Installed No Pipeline FirstEnergy N/A NIA WR-112 2016 Installed No Pipeline FirstEnergy NIA NIA WR-114 2016 Installed No Weldolet, 8" Energy & N/A NIA Ht 2014 Installed No NPS Process
- 7247ANF Pipe, 8" NPS Energy &
N/A NIA Ht. #X05072 2011 Installed No Process PC2
- Reducer, Energy &
NIA NIA Ht. #J2L6204 2016 Installed No I 8"x6" NPS Process PC2 Page 1 of3
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3900 90° Elbows, Energy & NIA NIA Ht. E20158 2016 Installed No 8"NPS Process 900 Elbow, 8" Energy & NIA NIA Ht. #BX0379 2014 Installed No NPS Process PC6 Reducing Energy & NIA NIA Ht.# 15050 2016 Installed No Tee, 8"x8"x6" Process PC2 NPS Pipe, 6" NPS Energy & NIA NIA Ht #E10254 2016 Installed No Process PC2 -*w 90° Elbow, 6" Energy & NIA NIA Ht. DF0216 2016 __ lns~lled __ *----- Jio NPS Process PC24 Check Valve BNL Industries A 141009-22-6 NIA 1RW-971 2015 Installed Yes Check Valve BNL Industries A141009-22-8 NIA 1RW-973 2015 Installed Yes Ball Valve BNL Industries A141009-23-1 NIA 1RW-970 2015 Installed Yes Ball Valve BNL Industries A141009-23-2 NIA 1RW-972 2015 Installed Yes Anchor bolt, Hilti NIA N/A NIA 2015 Installed No Incorporated Plate,%" Energy & NIA NIA Ht. 2015 Installed No Process
- 5500980-04 PCX2N Tube-steel, Energy &
NIA NIA Ht. #531685 2016 Installed
- No 4"x4"x 318" Process Plate, 'J4
Energy & NIA NIA Ht. 2014 Installed No Process
- B4P6321-03 PCC
- 7. Description of Work Installed new weldolet branch connection, giQe, fittings, and valves.
- 8. Tests Conducted:
Hydrostatic* [g) Pneumatic* D Nominal Operating Pressure t8'.l ExemptO Other D Pressure 149 psi Test Temp. Ambient OF Page2 of 3
FORM NIS*2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703..02 Rev. 02 Re ort Number 3900 "Record test pressure ancl temperature
- 9. Remarks Code Data Reports attached. Previous NIS-2 Data Report No. 3670. *Year placed in service is 1976.
Applicable Manufaclllret's Oa!a Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that.this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp _N=/A......_ _________ -'-_ Certificate of Authorization No. Expiration Date NIA Signed Thomas White En ineer V Date October 181h ' 20.... 16 Owner or Owner s CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors, I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period J S -ol J.. - r S-to / O -d.. I -I b , and state that to the best of my knowledge and belief, the I I I I I I I I I I I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any this inspection. Date _.._/-'"O_-_.)._..__f_-____, 20 L__f>_ Page 3 of3
FORM NPV.1 CERJ1ACA1E HOLDER'S DATA REPCJRT FOR NUCt.EAR PUMPS OR VALVES* Aa Required by the Provisions of the ASME Cod8. Section Ill, DMll0111 BNL INDUSTRIES INC ** 30 INDUSTRIAL PARK ROAD, VERNON, CT 06066 Pg. 1 of 2
- 2. Mtnufac:tunsd for ______
F_IRST E_N_ER_G_Y_S_E_RVl_CE_CO_MP_ANY_.,.. *..,.76_SO_UTH.,,..._MAl_N_STRE ET_,_AKR o_N._O_H_4430 __ a _____ _ illllnllll"ldlddJWSd...,_,
- 3. l..Qeatlon of inclallation SEAVER VALLEY NUQ.EAR POWER PLANT, 1 ROUTE 168, SHIPPINOPORT. PA 15()77 VALVE
- 4. Modtl No., Serilll No~ or Ty~ -------
- 5. ASME Code, Section m, Division 1
&. Pump or wlwl VALVE
- 7. Mate;-111 I*! volve 8odv Cbl Plll'llP C..lng ___
Cal C.lllfll::l1to Holdt<' a 8ei'flll Ha. A 141009-22.(ll THRU 6) Al4iGDN2=(1) 1971 letlillonl NOl'nll\\81 l"lllt size 8orvmt Coller 1111 Mallonal Boerd No. IH ____ Dl'llWlng eev.as.eo.o112 Aw. I! CFIN W72 3 ~Ol~ledoltll !elm! B" Outlei cize 6' Oift 8&47ATY.316 BOftlllO $A:453GR.660 Bolting tel..... - 8ody.C111l119 . Serial No. 1c1r Cet 81111~*-----
~ft. __
Setler Serial N11. No. SGG
- Supplemenial lnlomultloR in the fonn ol listl. 1111Sdte1. m dfl!Winga Miry be ned provided: l1J 1lnt iii f¥'h x 11; (2J infotma!lan In il8rm 1 lhtaugll 4 an lhia D2ta flepaot
- la lndlldld on Mch..i.t: *11d m-ai-ra llllll'IMf1ld.,... Ille numbered IMMl la ~l'dod 1t the IDpof INI filml.
818
FORM NPV~118ack..,,. Pg. 2 of _2_1 Cattlflcate Holder's Serial No. A 1" 1009*2'2*{3 thN S)
- 8. Oaslgn col'lditlon1 --.......,,,..~,__~~, ---
ANSl150# ---,..,.---...,-..,.--- or valve p'"sure das1 --------------
- 9. Cold working Pl'llAunt 275 PSIG @100"F 4SOPSIG 320PSIG
- 10. lil'dro11ellc telit -------. Oiskdifferentiel test pressure -------------*---------
- 11. Remerts Cl!RTIFICA'l'ION OFDESIGN Detlgn Specification certified by _______
J_oh_n_W_. _Di_*ng.. le_r _______ P.E. Slate __ IL_ R119. no. 062 *038953 Design ReJIOtl mrlified by
- P.E. SU11e -*-- Reg. no. ----
CERTIFICATE OF COMPl.IANCE We czrtify IN'! the 51Atemen111 made In this nspon ere C111m:ct and !hat thlr pump or 111lve conforms Ill th* rules for r:on111ruclion of the ASME Code. Section Ill, Division 1. N tiel1lliaate of Authorization No. _______ N-_28112 ________ EIQ)lrn _______ 11_1_1012_0_1_6 _____ _ ti,./<;.'~ C: SNL INDUSTRIES, INC. ~fl.. * ~ &.&.4Q Date ~ 1 Name Signed ~t~~ CERTIFICATE OF IN81'£CTION I, lhe undanigned, holding e velid ciommicclon Issued by the National BOt1rd of Boller and Prenure Vettel lnapectora end.employad by ONECIS INSUAANCE COW'ANV Qf LYNN, MA ~ l11tP9'*11i lhe pump, or valve, d-=rlbed in this Dall! Report an "f/IJ/I' and cme that to Iha best of my knowledge and bellaf, the Certlflcete Halder Ilea oan11tl\\ICted chis pump, or vaMt, in ec:cotdance with the ASME Code. Section Ill, Division t. By slgnln; this certificate neltfl*r lh* inspector nor I'll* ern11loyer mew any warranty, expreued or Implied, concemrnci the componem deseriblld In this Date Repgn. Fvith*rmore, ne11hertho lnllJlOClar nor hla emp&oyer ahall.,. lfabla In any manner for /llf'f pe110nal inJury or oroperty dam1ge or* locs of any kind arising fmm or aannect11d with this inspection. j_ Date 'f/11&1[ Signed ~~-&f' Comml8sion P4'iZ'// W~S ~ (NoliCNl-- .. d-- (071111 819
FORM NPV-1 CERTIFICATE HOU>ER'S DATA REPORT FOR NUCLEAR PUMPS OR VALVES* As Riiqulred by the Provisions of the ASME Code. Section Ill, Division 1 Pg.1 of 2
- 1. ManvfllCtured end c:eitilied by ______
B_N_L_IN_o_u_sm 1ES 1N_c_.. _30_IN_o_u_STR1A1._..,...,,.P_AA,,...K_R0..,.,.AD..,.-, VE_RNON ._CT_06066 .,..,.. 1'1111 d"'-9 fff fl C.ftJflc-. H.tiit.i
- 2. fbnuflclvl'9dtor ______
F_1RS_T_EN_E_R_GY_SE_RV1CE co-..,..M_P_ANY_._1_&_so__,,UTH.,.__MA_,..1N_S_TREET ._AK_RO_N_._OH_44_308 _____ _ ..,_.,,~
- 3. l.oc111ion of inslellatlon BEAVER VALLEY NUCLEAR POWER Pl.ANT, 1 ROUTE 168, SHIPPINGPORT, PA 15077 llllOlllllCl-
- 4. Model No., Serles No~ or Type ___
v._~_VE ___ Dr11wlng OBV.£12~11 2 Rev.
- 5. ASME Code. Section Ill, Division 1 1871 W72 3
....,_ (iloppljcotMIClll10!1 Cdml v_N._VE ___ Nomin,1 lnlel size ___ Outltn sWi ___ 6" __ _
- 7. Material 1.i valve Body lbl pump Casi1111--~-
Cal - C.rllllcaht Holder'* Serial No. A1410!$.23-(1THRU2) At4tOON3{3) Ba~ SA*105 c-r Oil N..-.al Board No. Disk §A.rn! J)'.318 Bolling SM53QB.660 Botting ___ _ l~l ldl Body/Ce&lno Bonna~er Serial Serial No. No. 479G-2 5470 479G-2 MTG-I 4?90 547G-t Cel Dlllk Serial No. 27tf.1 27H-1 27H-1
- SuppletnDntal lnfonmllon In 1hll 1c11m Ol 11111. Am:tlH, or m-tnoc m1v Ill Ullld provided: C1l size u B'h x n; 121 lnform111ian in iblna 1lhrougll4on1hl1 0- llepon le lllolCldlcl on llDlllh ~
- nd 131 ACll 1hHI II numbe,.d *rid the number est 1"-11111,_rd.cf at Ille top of dill farm.
107/10) 773
FORM NPV.1 (Back-Pg. 2 of_2_)
- 8. De1ignc:onditionu ---IP-,.....--, --- ------- orv1lve pressure cta11 _____
A._Ns_1_1_50# ____ _
- 9. Cald working prllt$ure 275 PSIG @tlXJ*f
- 10. tfydrostatl<: tem --"-!O_P_Sl_G ___. Olskdifh:ren1i1I test pressure __________ 3211 PS1G
- 11. Remarb CER11FICAl10N OF DESIGN Oeolgn 6i-ifi1111iion certified by _______
John w_._D-'higlef::...------- P.E. State _IL_ Reg. no. 062*038953 -Dtislgn Repoit certified bv P.E. State _ Reg. no. We cel'lify l.ftllt ttie lllltemen!I made In this report arc correct and lhllt lhi* ournp or velve oonfonm lo the n.llos for consiruc.tlon of the: ASME Code, SecrJon Ill. Dlvlllon t. N Certilicde of Autllorllltlon No. _______ N-_2_882 _______ Ex11!re1 _______ 1_11_1lll20 __ 1_8 _____ _ Date~[J-.,)1~ Neme BNLINDUSTRIES.INC. Signed~ ~Aal..Lt:) IP IN~MoedlPI CERTIRCA'f'£ OFtNSPECTION I, the undel"ligned, holding a valid Domminlon lasued by the N.ttlonal Board of Bolter and Pressure Vnsel lnspnc:torw and employed by OHEQS INSURAHCE COMPANY of LYNN. MA haw lnlPllCled 11111 pump. or 11111¥11, described in this D.tta Repol1 on '3111 Its , and a1111e 111e1111 the be$t ot my tnowledlJe end belllf, ttw Ctrtlfloeta HorderhllsconatMllllll this pul'Tlll, or vel\\le, in tc110ntenmwilh lbl! ASMI! Code.Sectlan Ill. Division 1. Bv signing thill aertfflcate nl'lllherthe inspe<<or nor Ilia emp!oyer m1111e11 env-ranty, eiqitelled or Implied, eancerninG the component described In lhit Dita Repon. furthermore. neither the lnspectOr nor hit mnplayer lhllll be llable In env manner for llllV pers0nal lnJury or pmpenv dlJm.efe or a ro. ol eny kind erlalng from or connected with this lnspei:tlon. D.n11 *'l/'3 t/tS" Signed ~ LV"Arz-,../ CommlllSion N:,ll f'Z.4/ ~NS" J I-umllorl E-.,,.1'111 107/111 774
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703-02 Rev. 02 Reoort Number 3902
- 1. Owner FirstEnerg~ Nucl~ar Ogerating Com(;!any I Date November 22, 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1
of 1 {ADDRESS) Unit No. 1
- 2. Plant Beaver Valley Powgr Statign (BVPS}
(NAME) P.O. Box 4, ShiQQing~ort, PA 15077 Order#200645626 (ADDRESS) Repain'Replacsmenl Organization P.O. No., Job No., etc.
- 3. Work Perfonned By BVPS Construction Services Type Code Symbol Stamp_
N/A (NAME) P.O. Box 4, Shi12Qing122tl. ~A 15077. Authorization No. NIA (ADDRESS) Expiration-Date --*-*-*--NIA-*-* -.-**~ *~'
- 4. Identification of System*
Recirculation Spray (Class C>
- 5. (a) Applicable Construction Code ASME Sectjon Ill
~Edition, W'68 Addenda, Code case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition - 2003 Addenda (c) Applicable Section XI Code Case(s): M[8
- 6. Identification of Compone_rit_!L ___ ~-------
Corrected, National Removed;- - ' ASME
- Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Heat Industrial 6301-1 3179 1RS-E-1A 1971 Corrected Yes Exchanger Process Eng.
- 7. Description of Work Reglaced seal welded diaehragms after cleaning and insoection of the HX tubes.
- 8. Tests Conducted:
Hydrostatic" 0 Pneumatic* 0 Nominal Operating Pressure 0 Exempt 181 Other 0 psi Test Temp. OF Pressure 'Record lest pre....,.. and temperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3 02
- 9. Remarks Copy of original Data Report in NIS-2 # 1577. Previous NIS-2 Data Report# 3768.
Applicable Manufacturer's Data Repcrte to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp...,N,.../A...._ __________ _ Certificate of Authorization No. CERTIFICATE Of.JNSERVICE. JNSPJ:c;;(LO.Jk~-""===*======- I, the undersigned, holding a valid commission issued by the National B'?ard of Boiler_an~_Pre~s_ure Vessel _lns_pec:;to~s I I and employed by The Hartford Steam Boiler Inspection and Insurance Compa_ny of Connecticut
- of 1
Hartford. CT have inspected the components described in this Owner's Report during the period I ,s--- ~ J.- ~ I 1-to / D - J... ;--/ fi , and state that to the best of my knowledge and belief, the I I I I I I I I I I I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expre~se._d or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. National Board Number and Endorsement D t ( ( ~ A )... - 20 "r a e __ LJ!!__ Page2 of 2
-i, FORM NIS.;.2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3904
- 1. Owner FirstEn~rgi'. Nuclear Ogerating Com12ani'.
I Date November 23. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS} Unit No. 1
- 2. Plant Beaver Ville~ PQ~I[ Station (BVPSl (NAME)
P.O. Box 4, Shigginggort, PA 15077 Order #200645628 (ADDRESS) Repat/Replacement Organization P.O. No.. Job No,, etc. 3.. Work PerformecLBy_ BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
~
~*--*----... ___,, u P.O. Box 4, Shigging12ort, PA 15077
- -*~
Authorizatio-n No. NIA (ADDRESS) --** -*Expiration Date NIA
- 4. Identification of System
- __ J1e.cjrel.llatiol:CSpra\\flClaSsC) *
'"~-----~-----------~----
- 5. (a) Applicable Construction Code ASME Section Ill 1968 Edition, W'§8 Addenda, Code Case li(8 (b) Applicable Edition of Section XI UtiHzed for Repair/Replacement Activity 2001 E-2003A (c) Applicable SectiQo XI Cpde Case(s): NIA
- 6. Identification of Camponents
- I Corrected,
*--* **----------**--- --*-National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Heat Industrial 6301-3 3181 1RS-E-1C 1971 Corrected Yes Exchanger Process Eng. Tube Plug Joseph Oat NIA NIA Heat#6464 2003 Installed No Corporation
- 7. Description of Work Re12laced seal welded dia1;1hragms, and seal welded tube glugs.
B. Tests Conducted: Hydrostatic* 0 Pneumatic* 0 Nominal Operating Pressure 0 Exempt 181 OtherD Pressure psi Test Temp. OF 'Record test pressure and tempera1ure Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re rt Number 3904
- 9. Remarks Copy of original Data Report in NIS-2 # 1577. Previous NIS-2 Data Report# 3770.
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME cocie. section xc - ** * --~------~ -**" ___ _ Type Code Symbol Stamp -'-N=/A'-'------------ NtA* Date December 5th , 20 1§_ ... -......CER:tlFJCATE. OF.JNSERVICE INSPECTION I, the u!:ld..~~~~~~9, ~oldin~ a v~l~d-~ommiss!()t'!_i_s~u-~~ b.Y the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period I .,£:-.iAJ...-/ S to I~ ~ J..r - / ' , and state that to the best of my knowledge and belief, the I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance* with the requirements of the ASME Code, Section XI. By signing this certifica~13 ne!~~!.t~e insp~ct'?!.. ~()r his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _j} ___ ~ __ A..._. .... '._, "'""""},~-*----, --=------ Commission r-1!9 Cf <)....Tr/,,,,./.z-g TnSP?aSJQnatlife National Board Number and Endorsement Date _ __.._/-=,;l...,----_s-_-____, 20 _/_~_ Page 2 of2 I I I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3907
- 1. Owner FirstEnerg~ Nuclear 012erating Com12an~
I Date October21, 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Vall~)! Po~r Station (BVPS)
(NAME) P.O. Box 4, Shif;!Qing(;!Ort, PA 15077 Order#200398396 (ADDRESS) Repair/Repls~ment Organizalion P.O. No., Job No., etc.
- 3. Work Periormed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shi12ging12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date -NIA
- 4. Identification of System Reactor Coolant (Q1}
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Globe Valve Rockwell NIA NIA 1RC-12 1976* Removed No International Pipe,%" NPS Energy & NIA NIA Ht. #533033 2014 Installed No Process Cap,%" NPS Energy & NIA NIA Ht. #421388 1989 Installed No Process
- 7. Description of Work Removed valve and installed gige and cag.
- 8. Tests Conducted:
Hydrostatic... 0 Pneumatic* 0 Nominal Operating Pressure D Exempt [8J Other D Pressure psi Test Temp. OF I Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRSIREPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re rt Number 3907 "Record test pressure and temperature
- 9. Remarks No Code Data Report available. *Year placed in service.
Applicable Manufacturer's Oala Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in ttie reP.Qrt_~re~c_Qrrect.and th~t this conforms to the requirements of the ASME Code, Section XI. Certificate of Authorization No. Expiration Date ___ ....,N~/A~---- CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford CT have inspected the components described in this Owner's Report during the period I S-- '-;;.. - /.r-to I C> - J._f - f ~ , and state that to the best of my knowledge and belief, the I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. --.>>~~~"'--Ai __.~}"-~,:;....;* =~............ ____ Commission JI ?'f J.f A t-l::r::d ~ 'iilSPej?sSign8tlli'e National Board Number and Endorsement Date ~l~d--_J-_(_ .... ____, 20 LL Page 2of2 I I I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3910
- 1. Owner FirstEnergy Nuclear 012erating Com12any I Date October 20. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1
of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station (BVPS}
(NAME) P.O. Box 4, Shi1212ing12ort, PA 15077 Order #200398407 (ADDRESS) RepairfReplacement Organization P.O. No.* Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
P.O. Box 4, Shil:!l:!ing12ort, PA 15077 Authorization No. N/A (ADDRESS) Expiration Date N/A
- 4. Identification of System Reactor Coolant System, BV-1-06-System, Q1
- 5. (a) Applicable Construction Code ANSI B31.1 1967 Edition, S'71 Addenda, Code Case=
(b) Applicable Edition of Section XI utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (C) Applicable Section XI Code Case(s): NIA
- 6. Identification of-Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Globe Valve Rockwell N/A N/A 1RC-38 1976* Removed No International Pipe,%" NPS Energy & N/A N/A Heat# 2015 Installed No Process 539092 Cap,%" NPS Energy & N/A NIA Heat#JXR 2016 Installed No Process
- 7. Description of Work Removed valve and installed 12i12e and ca12.
- 8. Tests Conducted:
Hydrostatic* 0 Pneumatic* 0 Nominal Operating Pressure D Exempt [8l Other D Pressure psi Test Temp. OF "Record le*t pr&SSU!l! and temperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3910
- 9. Remarks No Code Data ReQort available. *Year 12laced in service.
Applicable Manufacturer's Oats ReportS to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XL Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date NIA . S.J9.D~~ Thomas M Calko Enaineer Ill ~ rJ1 ~ Date Oct 20, 2012..
~- --
Owner or Owner's Designee, Tille
~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler lnsgection and lnsucance ComRanl! of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period s-_,;....;_ -/.) to /0-,)._0-/{;. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XL I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be Hable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~W-I r!J f<fd-'f A/..:C-Lf I Commission I National Board Number and Endorsement I Date l o--J-o - '20 /~ Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703*02 Rev. 02 Report Number 3915
- 1. Owner FirstEner:g~ Nuclear Oggrating Qom12an~
I Date October 21, 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station (BVPS}
(NAME) P.O. Box 4, Shi1212inggort, PA 15071 Order #200418391 (ADDRESS) Repair/Replacement Organization P.O. No., Job No,, etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
P.O. Box4, Shi12i;ijng12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System River Water System, BV-1-30-System, 03
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, 5'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): NIA
- 6. Identification ofComponents Corrected, National
- Removed, ASME Name of Name of Manufacturer Board other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No}
- Valve, Allis Chalmers 92361-1 NIA MOV-1RW-N/A Removed No Butterfly 102C2
- Valve, VelanValve 611035-1 NIA MOV-1RW*
2013 Installed No Butterfly 102C2 Spacer Plate Velan Valve NIA NIA Heat# 54311 2015 Installed No Stud Nova Machine N/A NIA Trace# 8830 2013 Installed No Stud Nova Machine N/A NIA Trace# 0814 2013 Installed No Stud Trust Mfg. NIA NIA Trace#SS15 2012 Installed No Stud Trust Mfg. N/A NIA Trace# HH04 2010 Installed No Nut Nova Machine NIA NIA Trace# 7N06 2013 Installed No Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev 02 Reoort Number 3915 Nut Nova Machine N/A N/A Trace#4H71 2010 Installed No
- 7. Description of Work ReQlaced Allis Chalmers valve with Velan Valve; installed new studs and nuts.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure D Exempt [gl Other D Pressure psi Test Temp. OF
- Record lest pressure and temperature
- 9. Remarks No Code Data Re1;1ort available forVelanValve. Prior NIS-2 Re12ort #1035.
Applicable Manufaclurer"s DB1a Reports to be B1tached -~-*---*
* - ---------- -GERT-lf-ICAT-E---OF-COMPL-IANCE -** --
I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A Signed Thomas M--~al~~. En~-i~:~~ ~II-== --~ Jll ~- Date Oct 21, 20.1§. Owner or Owner's Designee, Title ~- *-* CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler lns12ection and Insurance Com1;1an~ of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period s -J.J- - /.r to La -J... <(-I{, , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind;: °j""*f:Jinspection Commission J tf.1 'IJ.. f" A,J;r: '1 lnspect~Signature National Board Number and Endorsement Date /0 -). '-{ - I 20 LL. Page 2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3917
- 1. Owner FirstEnergy Nuclear Ooerating Co.
I Date 10-19-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station (BVPS}
(NAME) PO Box 4, Shi[![!ingQort, PA 15077 Order#200646446 (ADDRESS) Repair/Replacement Organi;::alioo P.O. No.. Joll No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, ShiQQing QOrt, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date
- NIA-
- 4. Identification of System Main Steam System, BV-1-21-System (Q1 or Class A)
- 5. (a) Applicable Construction Code ASME Section Ill 1968 Edition, No Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2093 Addenda (c} Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No)
- Valve, Consolidated BY89642 NIA SV-1MS-Repaired Removed Yes Safety Dresser 101A 2007
- Valve, Consolidated BM07758 N/A SV-1MS~
Repaired Installed Yes Safety Dresser 101A 2016 Studs Nova NIA NIA Heat# 34A6 2016 Installed No Machine Studs Nova NIA NIA Heat# 15K4 2015 Installed No Machine Nuts Nova NIA NIA Heat#25N4 2016 Installed No Machine
- 7. Description of Work Re1;2laced valve and inlet studs and nuts. Pri2r tQ installaliQn, NWS Technologies overhauled valve* no carts were reolaced.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure [gl ExemptO Other D Pressure psi Test Temp. OF
- Reoon:l tesl pressure arul temperature Page 1 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRSIREPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3917 ~* *-*.
- 9. Remarks Code Data Report att§ched for valve BM07756. Code Data Report for valve BY89642 attached to prior NIS-2 data report #1805.
Aoolicable Manufacturer's Data Rll<lorts to be aHached CERTIFICATE OF COMPLIANCE r certify that the statements made in the report are correct and that this confonns to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. N/A Expiration Date N/A Signed Thomas M Calko, Engineer lllC:::::'. ~ m ~ p_atE?_ Oct 19 '-20_.1.Q_ Owner or Owner's Designee, Title
- -~-**~*
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of I -* **-~ .I H§rtford, CT have inspected the components described in this Owner's Report during the period I S-J...J... *IS-to / "-/ f-1' , and state that to the best of my knowledge and belief, the Owner I has performed examinations and taken corrective measures described in this Owner's Report in acco(q~mce with.tbe I I requirements of the ASME Code, Section XL I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~-J.ki.M I I Commission,J ti 'l 'f J... f If../ :i::-,tt I National Board Number and Endorsement I Date /() -1 'i-
- 20 LS:_
Page 2 of2
O THE NATIONAL BOARD OF" EIDILER AND PREGIEIUIUt VESEIEL INEiPli:CITQRS NB-160, Rev. 7, (Olll2in S} FORM NVR-1, REPORT OF REPAIR/REPLACEMENT ACTIVITIES FOR NUCLEAR PRESSURE RELIEF DEVICES CATEGORY OF ACTNITY: 1 0 2 lZJ 3 0 REPAIR l1J Rf.PLACEMENT 0 RERATING 0
- 1. WORK PERFORMED BY: NWS Technologfes, LLC (name of"IMI" authorized argan!Dtlon) 131 Venture Boulevard, Spartanburg, SC 29306 (address)
- 2. WORK PERFORMED FOR: Arst Energy Corporation I Beaver Valley Power Station (name)
RoiJte 1ae, Sh1pp1r1Qi>ort, PA 1son (address) 3* OWNER: -First Energy-Corporation I Beaver Valey Power Station . *--.-{name) *** Route 168, Shippingport, PA 15077 0020 (fonn*NVfl"reglstratlon no.) 47863606 (P.O. no. )ob no.. etc.)
- 4. NAME, ADDRESS, AND IDENTIFICATION OF NUCLEAR POWER PLANT: First Energy Corporation I Beaver Valley Power Station (name)
Route 188, Shippingport, PA 16077 (address) Unit 1 ftdentlficallon}
- s. a: REPAIRED PRESSURE RELIEF DEVICE: _M_al_n_S_te_am;.;___Sa
..... fe___::::.ty_V;..;a..... 1v:..;;e _________________ _ b: NAME OF MANUFACTURER: _Cons olklated ,_D....;re..,.sse.....:_r _________ c: IDENTIFYING NOS.: 3787 A BMonss n/a steam ltype) !mfil. serial no.) (Nari Bd No.I (servile) d: CONSTRUCTION CODE: ASME / 111 / 1 1968 n/a ---- (name/sedlonlcfnrblon)
- 6. ASME CODE SECTION XI APPLICABLE FOR INSERVICE INSPECTION: _200_1 __ _
(edltlonl
- 7. ASME CODE SECTION XI USED FOR REPAIR/REPLACEMENT/RERATE: _2_00_1 __ _
(edition)
- 6. CONSTRUCTION CODE USED FOR REPAIR/REPLACEMENT/RERATE: _1_968 (edition)
(addenda) 2003 (addenda) n/a (ilddeoda) n/a (yearbullt) n/a A, Arllcle9 (code case(s)} (codedassl n/a (.:oclo! c:ase(s)I n/a {code~)) n/a (code case(i;)J
- 9. DESIGN RESPONSIBILITY: _nf,_a ______________________________ _
- 10. OPENING PRESSURE: 1075 BLOWOOWNOfappllcablel: _nJ,_a _________ _
SET PRESSURE AND BLOWOOWN ADJUSTMENT MADE AT: NWS Technologies, LLC USING _steam
- 11. DESCRIPTION OF WORK: (Include name and Identifying number of replacement parts): Disassembled. Components cleaned and Inspected. Disc oxidized and nozzle seat passivated. Wear areas buffed and lubricated as requfred. Valve reassembled. Certified set-pressure and seat tightness using steam.
- 12. REMARKS: NWS Traveler#: 16-225. No parts replaced.
This furm may be obtalnedfinmThe National Board of Baller andl'R1SsweYl!:ssel lnspectrus
- 1055 Oupper AYllllue,Columbul,Ohlo 4J229.1183 Pl!ge 1 of2
O THE NATIONAL BOARP DF' BCSU.. £R ANJ::lc PRESSURE VEBSE1... INEIPEC"n:rRli CERTIFICATE OF CO.MPLIANCE 0020 lbm"IMI"~ no.) 47663606 IP.O.no..Job i10..etc:.) 11 Jason c. Gibson ,.certify that to the best of my knowledge and belief the statements made in this report are correct and the repair, replacement. or rerate of the pressure rellef devices described above confonn to Section XI of lhe ASME Code and the National Baaed Inspection Code"VRw &*NR" rules. National Board c.ertlfiarte ofAuthorizatlon No *..:;632.;:.;;:.. ____________ to use the4VRr st.amp expires April 03, 2018 National Board fjttlflpzteofAurhorlzation. No. 81 ~ to USethe"NR"stampexplres Aplil 09, 2018 Date '-fl'I" Signed ~lie)* ..::QA~ltltlel..llM~/'"".:lPt:.aS~W....._ ________ CERTIACATE OF INSPECTION -===..:..:=-=;.:..;..,.__ ________,holding a valld commission fssued by the National Boanfof Bollerand PressureVes51i!I Jlf. g>m~ficy,w:b#e ~ulred, 'li!wed by the Jurisdiction of North Cllll'Olfna and employed by~ ~Th&~ and lnsuranc& Com ofCOnned!Wt of..:.H.=a=:dford.=i.;:C:;:.T ___ haw ln!ipected the repair, replacement,. and/or rerate described in this report on II AHM111' zR t~ and state that to the best of my knowledge and belief, this repair or replacement has been completed rn accordance with the Code specified and the NatJonal Board Inspection Code "YR" & *NR* rules. By slgnlng this certltiate. neither the undersigned nor my employer makes any warranty, expressed or lmplled,, cona!l'nlng the repair or replacement described In this report. Furtflennoie, nelttter the undersigned nor my employer shall be llable: In any manner for any personallnju~pro/6rtydamage, or loss of 4'fl~~nected ~nspec:tion. Date-
- srru Jit * - -
Slgned ~f c.... "J. NBill M. A. N, I NO# 1073 - / rl lNetlonal Board and elldorsementl
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Report Number 3918
- 1. Owner EirstEn!rQ!l NucleS!r Qgerating Co.
I Date 10-19*2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Ville:t Powec Station (BVPS}
(NAME} PO Box 4, ShigQing12ort, PA 15077 Order #200646694 (ADDRESS) Repair/Replacemenl ()rganiZatiOn P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
PO Box 4, ShiggingQort, PA 15077 Authorization No. NIA (ADDRESS) Expiration-Oate *
- NIA
- 4. Identification of System Mairi-Sfe~frn System, BV-F21:.:System (01 or Class AL
- 5. (a) Applicable Construction Code ASME Section !II 1968 Edition, No Addenda, Code Case~
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed
- (Yes or No)
- Valve, Consolidated BY89643 NIA SV-1MS-Repaired Removed Yes Safety Dresser 102A 2007
- Valve, Consolidated BM07761 NIA SV-1MS*
Repaired Installed Yes Safety Dresser 102A 2016 Studs Nova NIA N/A Heat# 15K4 2015 Installed No Machine Nuts Nova NIA NIA Heat#25N4 2016 Installed No Machine
- 7. Description of Work ReQlaced valve and inlet studs and nuts. Prior to installation, NWS Technol29ies overhauled valve* no oarts were reolaced.
B. Tests Conducted: Hydrostatic" D Pneumatic* D Nominal Operating Pressure t8I ExemptO OtherO Pressure psi Test Temp. OF
- Record test pressure and temperature Page 1 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3918 . - ~ ~ -~.,
- 9. Remarks Code Data Regort attached for valve BM07761. Code Data Regort for valve BY89643 attached to grior NIS-2 data re12ort #1806.
.o.nnllcable Manufacturers Data Ronnrts to be atlached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XL Type Code Symbol Stamp N/A Certificate of Authorization No. N/A Expiration Date N/A Thomas M Calko, Engineer lrf
- . ~ ~
411 a fJJ5 Signed Date Oct 19, 20 1§_ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler lnsgection a,_,d ~~s~!a.'1~ Comg~n)'._ of C?nn_ecticut of Hartford, CT have inspected the components described in this Owner's Report during the period s--..l..L ~/.r to I 0-/f-/{, , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in a.ccordance with the requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I J~_j.l;j I I Commission;./.# f'fd. { /-1.Alf.d I !nspeprs Signature National Board Number and Endorsement I Date ID-19..- I 20 If:, Page 2 of 2
O THE NATICNAL BDARD DF' BDILER AND PRE'.Bl!IURE VE&lilEI.. IHSPEQTCIRS N8-16Cl, Rev. 1, (O'Jf.23115) FORM NVR-1, REPORT OF REPAIR/REPLACEMENT ACTIVmEs FOR NUCLEAR PRESSURE RELIEF DEVICES CATEGORY OF ACTIVITY: 1 D 2 IZI 3 D REPAIR IZJ REPLACEMENT 0 RERATING 0
- 1. WORK PERFORMED BV: NWS Technologies, LLC (name of"NVR'iiinhcttied organlzatlOn J 131 Venb.Jre Boulevard, Spartanburg, SC 29306 (address)
- 2. WORK PERFORMED FOR: First Energy Corporation I Beaver Valley Power Station (lliJln~)
Route 168, Shippingport, PA 15077 (address)
- 3. OWNER: FirsrEnergy Corporation I Beaver Valley Power Station
-- -(name)*
~-*-*****-*
Route 168, Shippingport, PA 15077 (address) 0013 (form "NVR' registration no.J 47663606 {P.O. no. job na, W:J
- 4. NAME, ADDRESS, AND IDENTIFICATION OF NUCLEAR POWER PLANT: First Energy Corporation I Beaver Valley Power Station Route 168, Shlpplngpon, PA 15077 (address)
Unit 1 (identification) (Mme)
- s. a: REPAIRED PRESSURE RELIEF DEVICE: _M_a_in_Ste
_:._am_Safety__:._~_V..;;,al_v..:;,e __________________ _ ~ NAMEOFMANUFACTURER: _Consol ____ lda ted l~D~re~ss;.;;..;..er __________....;.... __________ ~--~--------~ c: IDENTIFYING NOS.: 3707R BM07761 n/a ----- steam a* n/a (type) !mfg. serial no.) (Nat'I Bd No.I (size) (yearbutlt) nla A, Arllcle 9 d: CONSTRUCTION CODE: _A_S_M_E_/_11_11_1 _________ _ 1968 n/a ---- (n&me/sectionfdlvblon) (edition) (addenda) (<Ode case{*)) (code Class)
- 6. ASME CODE SECTION XI APPLICABLE FOR INSERVICE INSPECTION: _200_1 __
2003 nla (edition)
- 7. ASME CODE SECTION XI USED FOR REPAIR/REPLACEMENTJRERATE: _200_1 __
(edition)
- 8. CONSTRUCTION CODE USED FOR REPAIR/REPLACEMENT/RERATE: _1_968 ___ _
(edition) (Mldenda) 2003 (addenda) n/a (llddcnda) (code casejs)) n/a (code case{j)) n/a (<ode c:aseC>JI
- 9. DESIGN RESPONSIBILITY: _nl._a _____________________...._ _______ _
- 10. OPENING PRESSURE: 10B5 81.DWDOWN Of applcablel: _nli_a ________ _
SET PRESSURE AND BLOWDOWN ADJUSTMENT MADE AT: NWS Technologies. LLC USING _s1_ea_,_. _m ______ _
- 11. DESCRIPTION OF WORK: !111dude name and Identifying number ofreplacement part:S): Disassembled. Components cleaned and inspected. Disc oxidized and nozzle seat passivated. Wear areas buffed and lubricated as required. Valve reassembled. CerUfied set-pressure and seat tightness using steam.
- 12. REMARKS: NWS Traveler #: 18-226. No parts replaced.
Thk fnrm may be obtalnedfnlmTheNational Eloilrdof BollerandPressureVessel lnspecl.Ol:S
- 1055 Crupper Avenue,Columlius,Ohlo4l22P.t1U P1ge 1 of2
O T"HE NATIONAL BCIARD ..CF" BCILER. ANC> P~ESSURE VES.SEL INSPECTORS CERTIFICATE OF COMPLIANCE tl\\M60, Rev. 7. (0912'3'1 Sl-0013 (form "NVR" reglslnitlon noJ 47663606 (P.O. no. Job no. <'IC) 1, Jason C. Gibson ,certifythattothe best of my knowledge and belief the statements made in this report are correct and the repair, replacement, or rerate of the pressure relief devices described above conform to Section XI of the ASME Code and the National Boord Inspection Code"VR" & 0 NR" rules. National Board Certificate of Authorization No...;6..:..32"--____________ to use the "\\IR" stamp expires April 03, 2018 Date J?.jl_P/16-Signed__ A~ -'QA=---M=ana=--g~e'"-r ----------- National Boar<t:e.!cate of Authorizatio~n N~.:7) to use the"NR" stamp expires April 00, 2018 rlzed representative) ltltlel CERTIFICATE OF INSPECTION 1; ChelieS F. Ti>e(!el , holding a valid commission issued by the National Board of Boiler and Pressure Vessel lnspedor:s-and tertfficate of-<'.ompetency, where required, Issued by the Jurisdiction of North Cerollna and einploied by l1le Hartford Steam Boller Inspection and Insurance Company of Connecticut of -=-Ha=rtford~;:...;CT..;.,_ ______________ _ have inspected the repair, replacement. and/or rerate described In this report on 10 A-udr. 2'. O f4 and state that to the best of my knowledge and belief, this repair or replacement has been completed in accordance with the Code specified and the National Board Inspection Code "VR" & "NR" rules. By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or Implied, concerning the repair or replacement described In this report. Furthermore, neith the ders" ne nor my em layer shall be liable in any manner for any personal inju pro damage, or loss of any kl cted
- Inspection.
Date 10-Signed NB# 8462, A, N, I NCi! 1073 (National Boilrd and endorsemtntl This form may be obtained from The National Board of Boiler and Pressure Vessel Inspectors
- 1055 Crupper Avenue. Columbus, Ohio 4322!H 183 Page2of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3919
- 1. Owner FirstEner:gy Nuclear Or;ierating Co.
(NAME) I Date 10-19-2016 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Varley Power Station (BVPS)
{NAME) PO Box 4, Shir;i12ingr;iort, PA 15077 Order #200646447 (ADDRESS) Repair/Replacement Organization P.O. No., Job No.. elc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shi1212ing12ort, PA 15077 Authorization No. NlA (ADDRESS) Expiration Date~ N/A "---------~
- 4. Identification of System Main Steam System. BV-1-21-System {01 or Class A)
- 5. (a) Applicable Construction Code ASME Section Ill 1968 Edition, No Addenda, Code Case N/A (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): ~
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Com1>onent Manufacturer Serial No.
No. Identification Built Installed (Yes or No>
- Valve, Consolidated BY89644 NIA SV*1MS-Repaired Removed Yes Safety Dresser 103A 2007
- Valve, Consolidated BM07764 N/A SV-1MS-Repaired Installed Yes Safety Dresser 103A 2016 Studs Nova N/A N/A Heat# 15K4 2015 Installed No Machine Nuts Nova NIA N/A Heat# 25N4 2016 Installed No Machine
- 7. Description of Work Re~laced valve and inlet studs and nuts. Prior to installation, NWS Technologies overhauled valve* no carts were reolaced.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure ~ ExemptO OtherD Pressure psi Test Temp. OF "Record lest pressure and 1emperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3919
- 9. Remarks Code Data Re12ort attached for valve BM07764. Code Data Re12ort for valve BYB9644 attached to Qrior NIS-2 data re12ort #1807.
Annlicable Manufaclurer's Data Re"""* to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. NIA Expiration Date NIA Signed. Thomas M Calko, ~ngineer rff
- . ":.\\.:;;fJ;;.
Owner or Owner's Designee, Ti~ /)1~ Date Oct 19, 201§_ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _T_h!= ~alif()rd_ ~team Boiler lns12ection and Insurance Com12an~ of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period S--.)...}.. ~/J"" to I I -/f -/'6
- and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective _measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the i inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. ~-1~:..L Commission,J/? f'loL-f /l~...r..t! National Board Number and Endorsement lnSPeCto Signature Date La.,.,1r- ' 20 I Co I Page 2 of2
O THE NATIONAL BOARD C>V EICllLER AND PR£fi1111URE VEGllEL INl!liPli:CTCIRS NB-160, Rev. 7, (09/'13115) FORM NVR*1, REPORT OF REPAIR/REPLACEMENT ACTIVIT1ES FOR NUCLEAR PRESSURE RELIEF DEVICES CATEGORY OF ACTIVITV: 1 0 2 [£) 3 0 REPAIR IZJ REPLACEMENT 0 RERATING 0
- 1. WORK PERFORMED BY: NWS Technologies, LLC (name of*Nllll* authOrized organization) 131 Venture Boulevard, Spartanburg, SC 29306 (address)
- 2. WORK PERFORMED FOR: Flrst Energy Corporation I Beaver Valley Power Station (name)
Route 168, Shippingport, PA 1"5077 (address)
- 3. OWNER: First Energy Corporation I Beaver Valley Power Station (name)
Route 168, Shippingport, PA 1-son (address) 0017 (form 'NVR* niglstration no.) 47663606 (P.O. no., )ob no. etc.)
- 4. NAME, ADDRESS, AND IDENTIFICATION OF NUCLEAR POWER PLANT: First Energy Corporation I Beaver Valley Power Station Route 168, Shippingport, PA 1"5077 (ecldreu)
Unit 1 {Identification) {name)
- 5. a: REPAIRED PRESSURE RELIEF DEVICE: _M_ai_n_Ste_..:...am_S~af..:...e;...:ty::...V_alv::..::..::...;e;__ _________________ _
b: NAMEOFMANUFACTURER:_c_on_sollda ted_/~D~re~sse~r;__ __ ~----~~~-~~--~-~~- c: IDENTIFYING NOS.: 3707R BM07764 n/a steam s* n/a (type) (mfg. JErlal no.) {Mot'I Bd No.I ($enllcel (size) (yearbulll) d: CONSTRUCTION CODE: ASME I 111/1 1968 _nJ;_a___ _nt_a __ _ A, Arlicle9 (a>deda$5) (name/sec:UonldMSlonJ (all!lon) (addenda)
- 6. ASME CODE SECTION XI APPLICABLE FOR INSERVICE INSPECTION: _2_00_1 __ _
(edlllori)
- 7. ASME CODE SECTION XI USED FOR REPAIR/REPLACEMENT/RERATE: _2_00_1 __ _
leditlon)
- 8. CONSTRUCTION CODE USED FOR REPAIR/REPLACEMENT/RERATE: _1_968 ___ _
(edlt!Oll] 2003 (addenda) 2003 {addenda) n/a (code casefs)) n/a (IX!de caRl(s)) n/a {code.:aseCsll n/a foode easels))
- 9. DESIGN RESPONSIBILITY: _nJ,_a-------------------------------
- 10. OPENING PRESSURE: 1095 BLOWOOWN(hppllc:ablel: _nli_a _________ _
SET PRESSURE AND SLOWDOWN ADJUSTMENT MADE AT: NWS Technologies, LLC USING _steam
- 11. DESCRIPTION OF WORK: llndude name and ldffltlfying number of replacellK!nt parUJ: Disassembled. Components cleaned and inspected. Disc oxidiz.ed and nozzle seat passivated. Wear areas buffed and lubricated as required. Valve reassembled. Certified set-pressure and seat tightness using steam.
- 12. REMARKS: NWS Traveler#: 18-227. No parts replaced.
This form may be obtlllned from The Nation al Bo1ml of Bollerand Pressure Vessel Inspector.!
- 1055 Crupper Awnue, c.olumbuc. Ohio 43221>-l 183 P;ige I of2
THE NATIONAL.. &CARD DF BmLER AND PREBBURE VEBBEL INSPECTCIR& NB-160, llev. 7. (Q!l/23115) 0017 !P.O. no. Job na. etci CERTIFICATE OF CO..,PLlANCE I, Jason C. Gibson , certify that to the best of my knowledge and belief the staternents made In this report are correct and the repair, replacement, or rerate of the pressure relief devices described above ronfonn to Section XI of the ASME Code and the National Boa.rd Inspection CodeWVR" &*NR" rules. National Board Certificate of Authorization No. ~63_2 _____________ to use the"VR" stamp expires April 03, 2018 National Boarg Cetttficate of Authorization No. 81 "".J to use the *NR" stamp expires April 00. 2018 Date un J Jf. Signed ~ C, d: QA Manae*er ~ ~llepreseMatlve) (title) CERTIFICATE OF INSPECTION I, Charles F. Toege! , holding a valllf"tommlSSion issued by the National Board of Boller and Pressure Vessel lnspectOrs and certificate of comp_e~n.~y. "Wj!I'~ rf!Q~~. l~!,!.~~~he J.MrJsdic;t;!o11,Qf *. !f-orth Carolina* - **
- and employed by The Hartford Steam Boller lospsclion and Insurance Company of Connecticut of -'-Hartfo==Rl""'CT,,..._ ____ __,.-=----------
hall@ inspected the repair, replacement, and/or rerate described in this report on H ;44&uG7 2D Iv and state that to the best of my knowledge and belief, this repair or replacement has been completed rn accordance with tile Code speeified and the National Board lnspectlon CQ<le "VR" & "NR' rules. This form may be obtained from Thi: Natto121 Baa id. of Boller ana Prelsure Ve.sef Inspectors
- 1 [)55 Crupper /wenoo, Columbi.a, Ohio 0229-1 163
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3920
- 1. Owner F uclear 0Mratina Co.
I Date 10-19-2016 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station (B~P§l (NAME)
PO Box 4, Shi1212ing12ort, PA 15077 Order #200646448 (ADDRESS) Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, ShiQQingQort, PA 15077 Authorization No. NIA (ADDRESS)
- **Expiration -Date
.N/A --~--"~* - -*.~ *~~-* --*. *-*
- 4. Identification of System Main Steam System, BV-1-21-System (01 or Class A>
- 5. (a) Applicable Construction Code ASME Section Ill 1968 Edition, J':!Q Addenda, Code Case t:lf8.
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition tg 2003 Addenda (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Component Manufacturer Serial No, No.
Identification Built Installed (Yes or No)
- Valve, Consolidated BY89645 NIA SV-1MS-Repaired Removed Yes Safety Dresser 104A 2007
- Valve, Consolidated BM07767 N/A SV-1MS-Repaired Installed Yes Safety Dresser 104A 2016 Studs Nova N/A N/A Heat# 15K4 2015 Installed No Machine Nuts Nova N/A NIA Heat#25N4 2016 Installed No Machine
- 7. Description of Work ReQlaced valve and inlet studs and nuts. Prior to installation, NWS Technologies overhauled valve* no carts were reolaced.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure l8l ExemptO Other D Pressure psi Test Temp. <>f
- Record lest pressure and temperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re rt Number 3920
- 9. Remarks Code Data Reportattached for valve BM07767. Code Data Report for valve BY89645 attached to prior NIS-2 data report #1808.
licable Manufacturer's Data Re orts lo be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp ""'"N=/A'-'------------ Certificate of Authorization No. NIA Expiration Date Signed Thomas M Calko. Engineer Ill " - s;;L;;;: /'1 ~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION NIA Date Oct 19, 20 1§_ I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and l~sur;:if!~Company of ~onnecticut of Hartford. CT have inspected the components described in this Owner's Report during the period .£ ~,;. ).,/ J-to I I.\\ - If - / G , and state thatto the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date _ _,,f--=-o _-_1-'r,__-___ _ 20 I"' Page 2 of 2 I I I I I I I I I I I I I I I I
O THE NATIONAL BOARD CJF BDILER "ND PREBBURE VESllEL INBPECTDRS NB-160, Rev. 7, (09/23115) FORM NVR-1, REPORT OF REPAIR/REPLACEMENT ACTIVITIES FOR NUCLEAR PRESSURE RELIEF DEVICES CATEGORY OF ACTMTY: 1 D 2 0 3 D REPAIR 0 REPLACEMENT 0 RERATING 0 ,
- WORK PERFORMED BY: NWS Technologies, LLC (name of"NVR"author!zed organization) 131 Venture Boulevard, Spartanburg, SC 29306 (address)
- 2. WORK PERFORMED FOR: First Energy Corporation I Beaver VaUey Power Station (l),Bme) *.
Route 168, Shippingport, PA 1 son (address) i OWNER: First Energy Corporation I Beaver Valley Power Station
*-------=-::-_-* *cn~r:~- --.
Route 168, Shippingport, PA 15077 (address) 0018 (form "NVR' registration no.) 47663606 (P.O. no., job no.. etc.)
- 4. NAME, ADDRESS, AND IDENTIFICATION OF NUCLEAR POWER PLANT: First Energy Corporation I Beaver Valley Power Station Route 168, Shippingport, PA 15077 (address)
Unit 1 (Identification) (name) S. a: REPAIRED PRESSURE RELIEF DEVICE: Main Steam Safety Valve ~----~-=--------------~------~ b: NAME OF MANUFACTURER: _eon __._so1_1da_t_e_d_/_D_res_se_r _____________________ _ c: IDENTIFYING NOS.: 3707R BM07767 nla steam (type) (mfg. serial noJ (Nat'I Bd No.) (service) d: CONSTRUCTIONCODE: _A_S_M_E_/_11_11_1 ________ ~ 1968 nla (name/section/division) (edition) (addenda)
- 6. ASME CODE SECTION XI APPLICABLE FOR INSERVICE INSPECTION: _2_00_1 __
(edition)
- 7. ASME CODE SECTION XI USED FOR REPAIR/REPLACEMENT/RERATE: _2_00_1 __ _
(edition)
- 8. CONSTRUCTION CODE USED FOR REPAIR/REPLACEMENT/RERATE: _1_968 (edition) 2003 (eddenda) 2003 (addenda) nla (addenda) 6" (size) n/a nla (year buPt)
(code case(s)) ~Article 9 (axleda5s) nla (code aise(I)) nla (code case(s)) n/a (code aise(sll
- 9. DESIGN RESPONSIBILITY: _nf._a ______________________________ _
- 10. OPENING PRESSURE: 1110 SLOWDOWN (If 11ppllcable): _n_la _________ _
SET PRESSURE AND SLOWDOWN ADJUSTMENT MADE AT: NWS Technologies, LLC USING _st_eam
- 11. DESCRIPTION OF WORK: (Include name and Identifying number of replacement parts): Disassembled. Components cleaned and inspected. Disc oxidized and nozzle seat passivated. Wear areas buffed and lubricated as required. Valve reassembled. Certified set-pressure and seat tightness using steam.
- 12. REMARKS: NWS Traveler#: 16-228. No parts replaced.
This form ma~ be obtained from The National Board of Boller and Pressure Vessel lnJpeetors
- I DSS Crupper Ave nu., Columbus, Ohio 43229-1183 Page 1 uf2
THE NATIONAL.. EIDARD DF BDILER <11.ND PREBl!rURE YEl;l&EL INSPEC'rCIREI CERTIFICATE OF COMPUANCE NB-160, Rev, 7, (09/D/1 S} 0018 (form"IMl'~lan noJ 47663606 (P.O. no. job no.~ 1, Jason C. GlbsQn , certify that to the best of my knowledge and belief the statements made in this report are correct and the repair, replacement, or rerate of the pressure rellef devices described above confrirrn ta SeetiQn XI of the ASME Code and the National Bar:mJ Inspection Code~ & *NR" rules. CERTIFICATE OF INSPECTION .~ Charles F.. Toegel , hQlding a valid comm1sslon rssued by the National Board Of BOiier and Pressure Ves-~ lnspecrors and certificate ofc()mpetency, where required, issued by the Jurisdiction of. North Clrolina *
- -and employed by
- llie-HSrlfom Steam Boil8r inspection and Insurance Company of Connecticut of..:.H.:::arttord,==,;:<.CT.:....-----...,.---------
have inspected the repalt, replacement, and/or terate describ'!d In this report on d AUr6t UST 'l () Ii. and state that to the best of my knowledge and belief, this repair or replacement has been completed fn accordance with the Code specified and the National Boord Inspection Code-VR"&"NR"rules.. By slgnlng th ls certificate, nelther the undel'9igned nor my employer makes any warranty, expressed or lmplled, concerning the repair or replacement described in this report Furthermore, neither the underslg nor my employer sftall be nable in any manner fur any personal lnju7" rr;,pljrty damage. or loss of an eris! fro ect is inspection. Date.... "/ If# Signed NBH462, A.~. I NC'.#1{)73 ~rl INldlonal Board end endolsement) This form may beobbllned from The NatlOn:al BOilrdof Boilerantl Pr~V~ Inspect<<$* 1055 CtupperAi.oenue.Colu1r1bus, Ohlo43229-1183 Pall"'2ofl
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3921
- 1. Owner FirstEnergy Nuclear 012erating Co.
I Date 10-19-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valle:\\! Power Station (BVPS}
(NAME) PO Box 4, ShiQE!ing1;1ort1 PA 15077 Order #200646449 (ADDRESS) RepainReplacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, ShiQRing12ort1 PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification ofSyslem Main Steam System, BV:..1:..21-System CQ1 or Class A)
- 5. (a) Applicable Construction Code ASME Section II!
1968 Edition, No Addenda, CodeCase Wf; (b) A.ppllcable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addends (C) Applicable Section XI Code Case(s): ~
- 6. Identification of Componeo_ts Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No)
- Valve, Consolidated BY69646 N/A SV-1MS-Repaired Removed Yes Safety Dresser 105A 2007
- Valve, Consolidated BM07770 N/A SV-1MS-Repaired Installed Yes Safety Dresser 105A 2016 Studs Nova N/A NIA Heat# 15K4 2015 Installed No Machine Nuts Nova NIA N/A Heat#25N4 2016 Installed No Machine
- 7. Description of Work Re12laced valve and inlet studs and nuts. Prior to installation, NWS Technologies overhauled valve* no oarts were reolaced.
- 6. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure i8l ExemptO Other 0 Pressure psi Test Temp. OF
- Record lest pressure end lemperalure Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3921
- ~.. ----
- ~.
- 9. Remarks Code Data Re12ort attached for valve BM07770. Code Data Re12ort for valve BY89646 attached to 12rior NIS-2 data reRort #1809.
A""licable Manufacturer's Data Renorts to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. Nfj-. Expiration Date NIA Signed Thomas M Calko, Engineer Ill c
- .. '5,;:::::f;... mli~
Owner or Owner's Designee, Title Date Oct 19, 201§_ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler lns12ecti<?n and Insurance (;0~_12an~ of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period S--,;...L -1.Jto
- O -/f-1~
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's RepoCT in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with thfs inspection. ~J-~ Commission,J.d Y-tf d-f A./ :CJ I lnsp Of'SSiQilaill(e National Board Number and Endorsement I Date f_t; -t.. ~ - t 20 L.f_ Page 2 of2
THE NATIONAL BOARD OF SOii.ER AND PREEUiURE Vii.EIBEL INBPECTQRB N8*160, Rev. 7, (09/23!15) FORM NVR-1, REPORT OF REPAIR/REPLACEMENT ACTIVmES FOR NUCLEAR PRESSURE RELIEF DEVICES CATEGORY OF ACTIVllY: 1 0 2 IZI 3 0 REPAIR IZJ REPLACEMENT 0 RERATING 0 1, WORKPERFORMEOBY: NWS Technologies, LLC (name of"tMI" lllltltOrimd Of!lanlzation ) 131 Venture Boulevard, Spartanburg, SC 29306 (address)
- 2. WORK PERFORMED FOR: First Energy Corporation I Beaver Valley Power Station (nome)
Route 168, Shippingport, PA 15077 (address) 3* OWNER: First Energy Corporation i Beaver Valley PoWer Station (name) Route 168, Shippingport, PA 15077 (address) 0019 (P.O. no. )ob no.. etc.}
- 4. NAME, ADDRESS, ANO IDENTIFICATION Of NUCLEAR POWER PLANT: First Energy Corparatlon I Seaver Valley Power Station (t111me)
Route 168, Shippingport, PA 16077 (address) Unit 1 (ldenti6cationl
- s. a: REPAIRED PRESSURE RELIEF DEVICE: _Mai_*n_Stea m_S_a_fe...:ty:._V_alv_e __________________ _
b: NAME OF MANUFACTURER: _Con_sol_lda_ted_l_D_ress_e_r ___________________ _ c: IDENTIFYING NOS.: 3707R BMomo nla steam (type) (mfg.Hrial no.) O'fat'l Bd No.} (service) d: CONSTRUCTION CODE: ASME / 111 / 1 1968 nla ---- (edlllon)
- 6. ASME CODE SECTION XI APPLICABLE FOR INSERVICE INSPECTION: _20_0_1 __
{edition)
- 7. ASME CODE SECTION XI USED FOR REPAIR/REPLACEMENT/RERATE: _2_00_1 __
(edition)
- 8. CONSTRUCTION CODE USED FOR REPAIRIREPLACEMENT/RERATE: _1_968 ___ _
(edition) 2003 (llddenda) 2003 (addenda) n/a (addenda) 6" (silt) nfa nta {code easels)) n/a A, Artlele 9 (codedus) (code case(s)) n/a (code asse(s)) n/a
- 9. DESIGN RESPONSIBILITY: _nJ_a------------------------------
- 10. OPENING PRESSURE: 1125 BLOWOOWNOfappllcable): _nf,_a _________ _
SET PRESSURE AND BLOWDOWN ADJUSTMENT MADE AT: NWS Technologies, u.c USING _steam
- 11. DESCRIPTION OF WORK: (lndude nameandltlentlfylng numberofreplacementpartsJ: Disassembled. Components cleaned and lnspeoted. Disc oxidized, and nozzle seat passivated. Wear areas buffed and lubricated es required. Valve reassembled. Certffled set-pressure and seat tightness using steam.
, 2. REMARKS: NWS Traveler#: 16*229. No parts replaced. This li>rm rnay be obtained fitlm The Natlonal Board cf Boller el'd Preslure V.uel lrispedon
- 1055 crupper Awnue. C'ullmlbus, Ohio 43229-118J Paget of2
THll! NATIONAL BCIARD CIF" BCllLEFl A.MtS PRli.lil&UR&; VEIHIEI.. IN&PECTCIRS NB-160, ~. 7.(0!l/23115) 0019 CERTIFICATE OF COMPUANCE I, Jason c. Gibson , certify that to the best of my knowledge and belief the statements made In this report are wrrect and the repair, replacement. or rerate af the pressure rellef devices described above conform tG Section XI of the ASME Code and the National Board Inspection Code"'VR* &*NR" rules. National Board Qutilicote of Authorization No. '""632--. ____________ to use the"VR" stamp expires N>itl 03, 2018 National Board CertlficateofAuthoriZ'atio!I No. 81 Q tti U!Oethe"NR"stampeicplres April 09, 2018. Date
- p/ul1*
Signed ~ ~ ..,.QA_.....fv'la..,,.n..... l!Q,...e._r --------- .,,., r ('.!!!!lililftzecfr.ip1115ent11lweJ ttftlel CERTIF1CATE Of INSPECTION L Charies.F. Top
- ; holding a valid commlsslon fsst.ied by the National Board of Boller and Pressure Vessel Inspectors 1md certlfi_ca~ ~
co~~!JQ',,.Wbere.required,Jssued.bv.theJurlsdlctlonof. North Clrollna and employed by nie*Hartford Steam Bnller ln&pedlon and Insurance Cotnpeny.of Oonnediout of..:...Hartford,==--=CT'-"-------------- 11aye Inspected the repal'r, replilcement, and/or rerate described in this report on U ;19.,..,.,,. z. - i!nd state that to the best of my knowledge and belief, this repair arreplacement has been CQ!llpleted tn ac<:ordance with the Code specified and the National Board Inspection Code"VR" &"NR' ru~. By signlng this certlfic.ate. nelther the undersigned nor my employer makes any warranty, expressed or lmplled, concerning the repair or replacement described In this report. Furth~ neither the undersigned nor my employer shall be Uable In any manner for any ......,~"'or,:"""'"'... "'"'"~;$"""~'"'"""'"' Date ti Signed. . ~ NB# &462. 5i N, I NC# 1073 r lffiit1cnal lloal'd and endmsernentl
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re1>ort Number 3922
- 1. Owner FirstEnergy Nuclear 0Qerating Co.
I Date 11-2-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station !BVP~}
(NAME) PO Box 4, Shi12Qing12ort, PA 15077 Order #200647290 (ADDRESS) Repal'/Replacemmt Organization P.O. No.. Job No.. etc.
- 3. Work Performed By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA.
(NAME)
~..
PO Box 4, Shi12einggort, PA 15077 Authorization No. NIA (ADDRESS) ~*-* 'retie~Bate NIA
- 4. Identification of System Chemical Volume and Control System, BV-1-07-System (Q1)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S71 Addenda, Code Case ~
(b) Applicable Edition of Section XI Utlllzed for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case{s): NIA
- 6. Identification of Components
-... ~ Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other
- Year---.... ***or-Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed lYes or No) Relief Valve Crosby N699721 N/A RV-1CH-2003 Removed No 0016 203 Relief Valve Crosby 61680-003 NIA RV-1CH-1990 Installed No 203 Studs Nova NIA NIA Trace# 2016 Installed No Machine 25U9 Nuts Nova NIA N/A Trace# 2016 Installed No Machine 25P6
- 7. Description of Work Renlaced valve with snare* Installed new studs and nuts on the inlet side of the relief valve.
B. Tests Conducted: Hydrostatic" D Pneumatic* D Nominal Operating Pressure 18] ExemptO OtherD Pressure psi Test Temp. of 'Record test press'"" and temperature Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3922 .. - '--" *~ '--r*--*-*
- -**~
- 9. Remarks No Code Data Reeorts available. Prior NIS-2 data re12orts #3576, 3303, 1622, 1554, 1016, 768, 757, 445 318 164.
Aoolicable Manufacturer's Data ReoOJts to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. N/A
- ~-Expirationl5aie N7A Signed Thomas M Calko, Engiaeer Ill c: = ?J:=L.ftf.<l&-=
Date Nov 2,__g01§_ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National.Board.of Boiler.and Pressur.e Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and l':lsurance Company of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period S--~al.-{F" to {_ " -J...r-(_/, , and state that to the best of my knowledge and belief, the Owner I has performed examinations and taken corrective measure~. gescrib~~t in thi§. Own__e_(s_~eQol!.in accpJQ..an~ with ttie I I requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty,_ expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~-12~ I r-1 I 9c/.J...Y lf.J.z:g I Commission I lns~e National Board Number and Endorsement I Date // '20 il_ Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703..()2 Rev. 02 Reoort Number 3923
- 1. Owner FirstEnergy Nuglear OR§rating Co.
I Date 10-12-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station (BVPS)
(NAME) PO Box 4, ShiRRinggort, PA 15077 Order #200648689 (ADDRESS) Repair/Replacement Organization P.O. No., Job No,, etc.
- 3. Work Pertorrned By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shieeing12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System Reactor Coolant System, BV-1-06-System. 01
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition. S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utillzed for Repair/Replacement Activity 2001 Edlt!pn to 2003 Addenc!a (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed IYes or No) Snubber Grinnell 12175 NIA VS-357-1 unknown Removed No I Snubber Lisega 31501136-025 NIA VS-357-1 2016 Installed No i i
- 7. Description of Work Re121aced snubber.
, 8. Tests Conducted: Hydrostatic* D Pneumatic* D Nominal Operating Pressure D Exempt 181 Other D Pressure psi Test Temp. OF "Record test pressure end temperature
- 9. Remarks No Code Data Regort available. Reelacement snubber sui;iglied as ANSI 831.1 1967Eg to '73A. No erior NIS-2 data reoorts.
Aoolicable Manufacturer's [)ala R*mon& to be attadll.!ld Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3923 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp ~N... IA~---------- Certificate of Authorization No. NIA Expiration Date Signed Thomas M Calko. Engineer Ill ~ /!J ~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION
- NIA Date Oct 12, 201§_
i I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford, CT have inspected the components described in this Owner's Report during the period 1 S-* ;..,,;... -rs-to I b -I~~/£ , and state that to the best of my knowledge and belief, the Owner I I I I I I I I I I I has performed examinations and taken corrective measures described in this Owner's Reportln accordan~ with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures'described in this owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. -~~-~-J~ln-sp~*i:/.__or'-~s_.S~-,.g~na-tu-re _____ Commission _t-f_~_j __ fl.:.._&.... fT .......... A.... fof--'.:r;.~t!------- ~ National Board Number and Endorsement Date _..... l_O_-_r_J-_-____, 20 / 6 Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3924
- 1. Owner FirstEnergy Nuclear Q12erating Co.
I Date 10-12-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Be§lver Valle~ Powgr ~tion (BVPS}
(NAME) PO Box 4, Shi!212i!.l9120rt, PA 15077 Order #200648678 (AODRESSj Repair/Replacement Organlzallon P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box4, Shi121,2in912ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System Safety Injection System, BV-1-11-System. Q2
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Snubber Grinnell 8806 N/A Sl-HSS-522 unknown Removed No Snubber Lisega 31501136-020 NIA Sl-HSS-522 2016 Installed No
- 7. Description of Work ReglaS2ii!d soubber.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure D Exempt l8J Other D Pressure psi Test Temp. Of "Record test pressure end temperalure
- 9. Remarks No Code Data Regort available. Reglacem1nt snubQ!2[ S!.lQQlied as ANSI 831.1 1967Ed to '73A. Prior NIS-2 data regort #1284.
Aoolicable ManUfacturer's Data Reoorts to be attached Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3924 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp.... N __ /A~----------- Certificate of Authorization No. NIA Expiration Date Signed Thomas M Calko, Engineer Ill ~ fYJ ~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION NIA Date Oct 12, 201§.... I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period S -.,.l..)... -cJ-to / A -/;t....-/ '° , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in acco~dance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described-in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _h_-"--~-_J'--""'_*.......,,, )o-;.;;_;_-4~~'-'-/*'-------- Commission,V/ft:fJ,..4 ;l.Jr..d iOSP~e National Board Number and Endorsement Date JO -/ J. - '20 _Lf. Page 2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY I As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3925
- 1. Owner FirstEnergy Nuclear Og~[iting CQ.
I Date 10-12-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beav~r Valley Power Station (BVPS}
(NAME) PO Box 4, Shl1212ing12ort, PA 1son Order #200648679 (ADDRESS) RepairJReplacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shigginggort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date N/A
- 4. Identification of System Safety Injection System, BV-1-11-System. Q2
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case ~
(b) Appllcable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): ll!IA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed Nes or Nol Snubber Grinnell 12174 NIA Sl-HSS-523A unknown I Removed No Snubber Usega 31501136-017 N/A Sl-HSS-523A 2016 Installed No
- 7. Description of Work Re1:2laced snubber.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic" 0 Nominal Operating Pressure D Exempt [gj OtherO Pressure psi TestTemp. OF 'Record test pressure end temperature
- 9. Remarks No Code D§!ta Reb!ort available. Reg!acement snubber SUQQlied as ANS! 631. 1 1967Ed to '73A. Prigr I
NIS-2 data re12ort #1122. """licable Manulaclurel's Da11! Reoorts to be attached Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3925 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp..:..N.::..IA Certificate of Authorization No. NIA Expiration Date Signed Thomas M Calko. Engineer Ill..,.,...,,. S~ /)1 ~~riGi.o_..-- Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION N/A Date Oct 12, 201§_ I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period s- ~ )..-/.S-to, /ii -/ J..-/r.. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date I (J - / J.. - '20 / b Page2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3926
- 1. Owner FirstEner.gi'. Nucleir 012era1ing Co.
I Date 10-12-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valle:t Power Stagon (BVPS}
(NAME) PO Box4, Shigginggort, PA 15077 Order #200648677 (ADDRESS) Repair/Replacement Organization P.O. No.* Job No.. elc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, §higging12ort, PA 15077 Authorization No. NIA (ADDRESS} Expiration Date NIA
- 4. Identification of System Safetx Injection S~stem, BV-1-11-S~stem,.Q1"' Q~
"lll'l'IC.. K-*'4-ll.
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case NIA
{b) AppHcable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): tuA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed Nes or No) Snubber Grinnell VB-7466 NIA Sl-HSS-5238 unknown Removed No Snubber Lisega 31501136-019 NIA Sl-HSS-5238 2016 Installed No
- 7. Description of Work Re12laced snubb!ir.
- 8. Tests Conducted:
Hydrostatic"' D Pneumatic"' D Nominal Operating Pressure D Exempt C8J Other D Pressure psi TestTemp. OF "Record lest pressure end temperature
- 9. Remarks No Code Data Re12ort available. Re12lacemenl snubber su~glied as ANSI B~1.1 j967Ed to '73A. Prior NIS-2 data re12ort #1501.
Annlicable Man\\lfacturel"e Data Reoorts to be attached Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3926 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp..... N,,../A._,_ __________ _ Certificate of Authorization No. NIA Expiration Date NIA Signed Thomas M Calko, Engineer Ill ~ /!J ~--- Date Oct 12, 20.1§_ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period .s---..1..l -/.r to IO -12... - / ~ , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described.in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any-warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ,b ~µ Commission,JI 'l '1,,L '111 ;./z,J lnsp o?SSiQMtUre National Board Number and Endorsement Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703--02 Rev. 02 Reoort Number 3928
- 1. Owner FirstEnergy Nuclear Qgilrating Co.
J Date 10-12-2016 (NAME) 76 South Main street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power ~ts!tion (BVPS)
(NAME) PO Box 4, Shigging12ort, PA 15077 Order #200648690 (ADDRESS) Repair/Replac:ement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, ShiQginggort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date N/A
- 4. Identification of System Reactor Coolant System, BV-1-06-System, 01
- 5. (a) Applicable Construction Code ANSI B31.1 1967 Edition, S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Snubber Grinnell VB-6821 NIA PS-244-VS-1 unknown Removed No Snubber Lisega 31501136-026 N/A PS-244-VS-1 2016 Installed No
- 7. Description of Work Reglaced snybber.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure D Exempt~ Other D Pressure psi Test Temp. OF "Record test pressure and lemperature
- 9. Remarks No Code Data Regort available. Reglacement snubber syg12lieg as ANSI 831.1 1967Ed to '73A. No 12rior NIS-2 data re12orts.
Aoolicable Manufacturer's Data Reoorts to be attached Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section Xl NOP-CC-5703-02 Rev. 02 Report Number 3928 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp.... N ..... /A'-'------------ Certificate of Authorization No. N/A Expiration Date N/A Signed Thomas M Calko. Engineer 111.,...........,d /Jl~. Date Oct 12, 20.1§_ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period .["- ;. ).. -1.r to IO - / J--/ C. , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ---=-~--=--_J .J..-# 1.._~ ..... '_.....~--- Commission,J J 9'-IJ.. f A.J.:C.tJ / ~spector~natlll'e National Board Number and Endorsement Date _.._t..... IJ_-....c.I_,.;..~------, 20...LiL Page2of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3929 Owner FirstEnerg:,: Nuclear OR.§rating Co. I Date 10-14-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Power Station {BVPS}
(NAME) PO Box 4, ShiRginggort, PA 1§077 Order #200648689 (ADDRESS) RepairlReplacemenl Organizalion P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
~o Box 4, Shigginggort, PA 15077 Authorization No. N/A (ADDRESS) Expiration Date NIA
- 4. Identification of System Safety Injection System, BV-1-11-System, Q2
- 5. (a) Applicable Construction Code ANSI B31.1
.lll§Z Edition, §11 Addenda, Code Case J::!{.8 (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): t:!lA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed lYes or No) Pipeline Pipeline FirstEnergy NIA NIA 3"-Sl-321-2016 Corrected No 153A-Q2
- Flange, Energy &
NIA NIA Lot#5774 2003 Removed No Blind Process
- Flange, Newman Weld Flange &
N/A NIA Heat#H-595 2011 Installed No Neck Fitting Co Valve, Ball BNL A141009-15-1 NIA Valve ID: 2015 Installed No Industries 181-88
- 7. Description of Work Removed blind flange and installed items identified above for FLEX BiQing.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure IZI ExemptO OtherD Pressure _____ psi TestTemp. ~------ 0 F
- Record lest pressure and temperature Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVlTY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703*02 Rev. 02 Re ort Number 3929
- 9. Remarks No Code Data Report available. Prior NIS-2 data report #3668.
licable Manufacturer's Data R rt.a to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp....:.N=/A,_,_ __________ _ Certificate of Authorization No. N/A Expiration Date Signed Thomas M Calko, Engineer Ille::::=-=-\\{ k (IJ ~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION NIA Date Oct 14, 201§_ I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report duringJhe period r -J.pl.-1 r to I () - )../ -/ 6 I and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property d~mage or a loss of any this inspection. Date _,_/-'-0 --=-ol.~(_-____, 20 _f_f Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3930
- 1. Owner FirstJ;nea;i~ Nuclear Ogerating Comgan)'.
I Date October 26. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant B1aver Valle~ Power Station (BVPS}
(NAME) P.O. Box 4, ShiQging(;!ort, PA 15077 Order #200579805 (ADDRESS) RepairJReplacement Organizalim P.O. No.* Job No., e!c.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shigging12ort, PA 15077 Authorization No. NIA (ADDRESS)
- Expiration Date NIA
- 4. Identification of System Main Steam (02)
- 5. (a) Applicable Construction Code ANSI 831.1 1967Edition, S'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement ActlvHy 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other ~
or Code Stamped Component Manufacturer Serial No. No. Identification Installed (Yes or No) Globe Valve Masone ii an H-49378-103*1 NIA TV-1MS-1976* Removed No I 105A Globe Valve Dresser Inc. A-15-785504-NIA TV-1MS-2016 Installed No Masoneilan J001-2 105A i l
- 7. Description of Work Re1;1laced valve.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure ~ ExemptD OtherD Pressure psi Test Temp. OF
- Record last pressure and temperet... re Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703*02 Rev. 02
- 9. Remarks No Code Data Report available. Previous NIS-2 Data Report No. 586. *Year placed in service.
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp _..N=/A'-"------------ Certificate ofAuthoriZation No: Expiration Date NIA ' 20..:..16;:;..__ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of . 1 Hartford. CT have inspected the components described in this Owner's Report during the period 1 ..J-J...;... - /J-to /!} -..<.r -( ~ ....., and state that to the best of my knowledge and belief, the I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. &.-..v--1-1.. jl Commission,.M P '{.;i._ 'f rl.J.rd _...~---~-~,n-sp-e~~_,,,_r's_S_i-gn~a~tu_r_e_____ National Board Number and Endorsement Date __ t __ o_-_2._4"",__-____. 20 Lfe_ Page 2 of2 I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Report Number 3936
- 1. Owner FirstEnergy: Nuclear O~rating Com12anl(
I Date October 26 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Begver Valfex Power Station (BVPS}
(NAME) P.O. Box 4, ShiQQingQort, PA 15077 Order #200579830 (ADDRESS) RepsiriReplacement OrganizaUon P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O, Bo;is4, Shig12ingeort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA -
- 4. Identification of System Main Steam (Q2)
- 5. (a) Applicable Construction Code ANSI 831.1 1967Edition, 8'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (C) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Globe Valve Masoneilan H-49378-103-2 NIA TV-1MS-1976* Removed No 1058 Globe Valve Dresser Inc. A-15-791174-NIA TV-1MS-2016 Installed No Masoneilan J001-2 1058 Pipe, 3" NPS Energy & NIA NIA Ht. #FA1076 2013 Installed No Process Support Stone & NIA NIA SHP-SH-126 1976* Corrected No Webster
- 7. Description of Work Be12laced valv~ and sectiQn of Qige. Reworked 12i12e su1212oa.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure ['83 ExemptO Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3936 Other D Pressure psi Test Temp. OF
- Record test pressure and temperature
- 9. Remarks No Code Data Rei;iort available. Previous NIS-2 Data Re12ort No. 587. *Year glaced in service.
Applicable Manufacturer's Data Repo~s to be attached Pi12e su1212ort SHP-SH-126 was cut and reassembled. CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforrns to the requirements of the ASME Code, Section XI. ---~ Type Code Symbol Stamp NIA Certificate of Authorization No. NIA Expiration Date N/A ThomasWhite ~ Signed Owner or Owners esignee, T~e EngineerV Date October 26th ' 2016
*~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commissiOn issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford ~ieam Boiler lnsr.!ection and Insurance Com12an~ of Connecticut of I Hartford, CT have inspected the components described in this Owner's Report during the period I ..J-:Lol.-/.J to I..~ -,;1...r-/&. , and state that to the best of my knowledge and belief, the I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance I I with the requirements of the ASME Code, Section XL I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a Joss of any I kind arising from or connected with this Inspection. I ~_li1 I Commission ~/J f'f,J.:t 11-..Jf~ I I Ins ois Signature National Board Number and Endorsement I Date lO -J.7- ' 20 /{;, Page 2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3942
- 1. Owner FirstEn~rg)l Nuclear 012erat1ng Co.
J Date 10-12-2016 (NAME) 76 South Main Street-Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver V§!lley Power §talion (BVPS}
(NAME) PO Box 4, Shi1212ing12ort, PA 15077 Order #200648706 (ADDRESS) Repair/Replacemenl Organization P.O. No., Job No., etc
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
PO Box 4, Shigginggort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date N/A
- 4. Identification of System River Water System, BV-1-30-System, Q3
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): tNA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Snubber Grinnell 12177 NIA WR-HSS-309 unknown Removed No Snubber Lisega 31501136-018 NIA WR-HSS-309 2016 Installed No
- 7. Description of Work Re12laced §nybber.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure D Exempt [83 Other D Pressure psi Test Temp. OF 'Record test pressure and temperature
- 9. Remarks No Code Data Re~ort available. Re12lacement snubber §1.!QQ!ieg a§ ANSI f!31.1 1967Ed to '73A. Prior NIS-2 data re12ort #1496.
APPiicabie Man:Jfacturer's Data Reports to be attached Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3942 CERTIFICATE OF COMPLIANCE r certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XL Type Code Symbol Stamp...:.N=/A'-'------------ Certificate of Authorization No. NIA Expiration Date NIA Signed Thomas M Calko, Engineer Ill ~ M'= -- Owner or Owner's Designee, Title / Date Oct 12, 201§_ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a.valid.commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period s=- b.,l ~ I.r-to I 0 -I J. -/ b , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. --=-f)--=~"-=---_)""-"". __._..U~=* _-..,__ ____ Commission,.JI 7 <I J...Y l'f,../...z:-,( lnspeefsSiQllitUfe National Board Number and Endorsement Date _ _._1..... 0.._... __._/,;;_~--____, 20 L£ Page2 of 2 I I .J I I I I I I I
FORM NIS-2 OWNER 1S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3943
- 1. Owner FirstEnergy Nuclear 012erating Co.
I Date 10-12-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Powe[ Station (BVPS}
(NAME) PO Box 4, ShiQQingi;iort, PA 15077 Order #200648692 (ADDRESS) Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shil!12ing12ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System Reactor Coolant System, BV-1-06-System. Q1
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI Utlllzed for Repair/Replacement Activity 2001 Edition to 2003 Mcienda (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected.
- Removed, ASME Name of Name of
- Manufacturer National Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Snubber Grinnell VB-6683 N/A RC-HSS-1 unknown Removed No Snubber Lisega 31500039-007 N/A RC-HSS-1 2.016 Installed No
- 7. Description of Work Re12laced snubber.
- 8. Tests Conducted:
Hydrostatic* 0 Pneumatic* D Nominal Operating Pressure D Exempt [gl Other 0 Pressure psi Test Temp. Of 'Record lest pressure and temperature
- 9. Remarks f::lo Code Qatil Rei;iort available. Re121acement snubber sug12ljed as ANSI B31.11967Ed to '73A. No grior NIS-2 data re~ns.
Aoolicable Manulaclurer's Oals Reoorts to be attached Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 ReDort Number 3943 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XL Type Code Symbol Stamp...:.N~!/A~----------- Certificate of Authorization No. N/A Expiration Date Signed Thomas M Calko. Engineer Ill~ /JI ~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION N/A Date Oct 12, 20 1.§_ I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period S-).. )..-tr to /0- tJ.... -I" , and state that to the best of my knowledge and belief, the Owner has performed examinations.and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising *tram or connected with this inspection. ~J,;iiL Commission,Jll '1 '(.LF II,,l'f,( I ectOr's Signature National Board Number and Endorsement Date -~l_0_-_1J.-_-_____, 20 Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3944
- 1. Owner FirstEner:g:r: Nuclear OQtrating Co.
(NAME) I Date 10-12-2016 76 South Main street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beav§r Valle!l Power Station (BVPS)
(NAME) PO Box 4, ShieeingQort, PA 15077 Order #200648693 (ADDRESS) RepairlReplacement Organization P.O. No., Jot No., etc.
- 3. Work Perfonned By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Shieeing i;iort, PA 15077 Authorization No. N/A (ADDRESS) Expiration Date NIA
- 4. Identification of System Reactor Coolant System. BV-1-06-System, Q1
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case ~
(b) AppHceble Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addend@ (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed lYes or No) Snubber Grinnell 11286 NIA RC-HSS-2 unknown Removed No Snubber Lisega 31500039-008 NIA RC-HSS*2 2016 Installed No
- 7. Description of Work Reglaced snubber.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure D Exempt fgJ Other D Pressure psi Test Temp. Of
- Record test pressure and temperature
- 9. Remarks No Qggii! QatiJ! R~u2od; avallabl§. Re12lacement snubber su12glied as AN§I B31.11967Ed to '73A Prior NIS-2 data regorts #1102 and #182.
Anolicable Manufacturer's Data Reports to be attached Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Reoort Number 3944 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp ~N=/A~----------- Certificate of Authorization No. N/A Expiration Date N/A Signed Thomas M Calko. Engineer Ill"= -4 Date Oct 12, 20 1§.... Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period .S:- )...).. -IJ-to / O - /,)....-/ {;, , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures desc(ibed in this Owner's Report in accordance with the requirements of the ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __.._~"--* --'"---"~"-F-- 7 ...&..;p. J1;J ..... '~*..___ ____ Commission t!tl 9</J...Y d-p:C.d lnS~?SSi9flitUre National Board Number and Endorsement Date __ t~()_-_t_,).__-____, 20..Lf:. Page 2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703*02 Rev. 02 Report Number 3945
- 1. Owner FirstEnergy Nuclear OQS!rating CQ.
I Date 10-7-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver ValleY. Power Station (BVPS)
(NAME) PO Box 4, Shl[!QingQort, PA 15077 Order #200648699 (ADDRESS) RepairlReplacement Organizalion P.0. No., Job No.. etc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp N/A (NAME)
PO Box 4, Shi[![!ingeort, PA 15Q77 Authorization No. NIA (ADDRESS) Expiration Date NIA
- 4. Identification of System Residual Heat Removal System, BV-1-10-System, 02
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, 5'71 Addenda, Code Case ~
{b) Applicable Edition of Sectlon XI Utilized for Repair/Replacement Activity 2001 Edlljon to 2003 Addenda (c) Applicable Section XI Code Case(a): NIA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed lYes or Nol Snubber Grinnell 8407 NIA RH-HSS-113 unknown Removed No Snubber Lisega 31500273/049 NIA RH-HSS-113 2016 Installed No
- 7. Description of Work Reelaced snubber,
- 8. Tests Conducted:
Hydrostatic* 0 Pneumatic* 0 Nominal Operating Pressure 0 Exempt [8J Other D Pressure psi Test Temp. Of 'Record test praswre and temperature
- 9. Remarks No Code Deta Re12ort available. Re12lacement snubber su1212lied as ANSI 831.1 1967Ed to '7'J.A. No Q[jor Nl§-2 data reimrts.
A<><>licable Manufacturer's Oabl RePorts lo be attached CERTIFICATE OF COMPLIANCE I certifv that the statements made in the reoort are correct and that this conforms to the reauirements of the ASME Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3945 Code, Section XI. Type Code Symbol Stamp..... N=/A;...;..,._ __________ _ Certificate of Authorization No. NIA Expiration Date Signed Thomas M Calko. Engineer"iif= ~ ~ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION NIA Date Oct 7, 20 1§__ I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's-Report during the period S--1'--01.. - /.)- to /0 I tP , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any ~nd *:;::r co;e~ct~d.wi~ t'inspection. ---~-~~'-4 __. --~~~---- Commission rJLf f f/iJ.. <f If J():z;-4 lnspectof i~ National Board Number and Endorsement Date __ /_U_-_7_,.. ___, 20 /_L Page 2 of2 I I I I I I I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3948
- 1. Owner Fir§tSnergy Nu~!ear Ogerating Co.
I Date 10-12-2016 (NAME) 76 South Main Str§!et - A[Sroa, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Bfi!axf2r Vall~n~ Power Statign (B~es)
(NAME) PO Box 4, ShigQing12ort, PA 15077 Order #200477725 (ADDRESS) RepaidReplacement Organimllon P.O. No., Job No., etc.
- 3. Work Perfonned By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
PO Box 4, Sbi!2Qinggort, PA 15077 Authorization No. NIA (ADORE$$) Expiration Date NIA
- 4. Identification of System Safety Injection System, BV-1-11-System, Q2
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case NIA (b) Applicable Edition of Section XI UHlized for RepairlReplacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): l!!fA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Snubber Grinnell VB-6810 N/A Sl-HSS-512 unknown Removed No Snubber Lisega 31501136-028 NIA Sl-HSS-512 2016 Installed No I j 1. Description of Work Rei;ilaced snubber.
- 8. Tests Conducted:
Hydrostatic"' D Pneumatic* D Nominal Operating Pressure D Exempt [81 OtherD Pressure psi Test Temp. OF
- Record test pressuna and temperature j 9. Remarks No Code Data Re12ort available. Re12lacement snubber sugglifig a§ 8N§I ~~1.11a§7Ed tg '7~A. No
' grior NIS-2 data re12orts. Annlicable Manufacturer's Data RePOrts to be a1tached Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3948 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp..... N""/A _____________ _ Certificate of Authorization No. NIA Expiration Date N/A Signed Thomas M Calko. Engineer Ill
- --i ~
/Ii ~-----* Date Oct 12, 201.§_ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Companv of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period s: - ;t.,L -1.r to I a -I J--/ b I and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ~_j_ J,J_ Commission,.Jt Nd$ /l,./z.d lnsp or's Signature National Board Number and Endorsement Date I " - / J.- - '20 / 6 Page2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3952
- 1. Owner EirstEnergy Nuclear Ogerating Co.
I Date 11-1-2016 (lllAME) I 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 {ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valley Po!A!er Station (BVPS)
(NAME) PO Box 4, Shim2ingeort. PA 15077 Order #200643912 (ADDRESS) RepaiflReplacemenl Organizalion P 0. No.. Job No.. etc.
- 3. Work Performed By BVPS Mechanical Maintenance (NAME)
Type Code Symbol Stamp NIA PO Box 4, Shieeing12ort, PA 15077 Authorization No. NIA {ADDRESS)
- Expiration Date_.
NIA
- 4. Identification of System Reactor Coolant System. BV-1-06-S)lsterrHO for Class A) --
- 5. (a) Applicable Construction Code ASME Section Ill 1968 Edition, 5'68 Addenda, Code Case NIA (b} Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (C)
Applicable Section XI Code Case{&): f:YA
- 6. Identification of Components -
Corrected,
- Removed, ASME Name of Name of Manufacturer
- National Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. ldentificatlon Built Installed <Yes or No) Safety Valve Target Rock 0569C--OO 1-7 NIA RV-1RC-2007 Removed Yes 5518 Pilot Valve Target Rock 7 N/A RV-1RC-2007 Removed Yes 5518 Safety Valve Target Rock 0569C-001-1 N/A RV-1RC-Repaired Installed Yes 5518 2016 Pilot Valve Target Rock 4 NIA RV-1RC-Repaired Installed Yes 5518 2016 Stud Nova NIA N/A Trace# 2015 Installed No Machine 15K4
- 7. Description of Wortc Re12laced gilot valve and §af~~ valve with §Qare. Re12taced a cougfe studs. Prior to installation NWS Technolooies overhauled Main 1 and Pilot 4 valves* no ASME Section XI oarts were reolaced.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure l'8l ExemptO OtherO Pressure psi Test Temp. OF 'Record test pressute and ll!rnperature Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3952
- 9. Remarks Code Data Regort for installed valves attached to this NIS-2. Code Data Re1::1ort for removed valves attached to NIS-2 #3829. Prior NIS-2 data re12orts #3829, 3569, 3114, 1845, 1436, 280, 158.
Annlieat>le Manufacturers Date Rennn* to b& attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date N/A Thomas M Calko, Engineer Ill "'==o ~ t11 ClJh Signed. Date Nov 1, 20.12_
- ~
Owner or Owner's Designee, Title ~ CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I and employed by !h~.':'~_ft!ord.st~am. ~oilf!r lnsp~tion and Insurance Company of Connecticut of I I Hartford, CT have inspected the components described in this Owner's Report during the period I c:- ;..J,. -/.r to {. 0 -,;lr'-/~ , and state that to the best of my knowledge and belief, the Owner I has performed examinations and tal<e11 corrective measur~s described in this Owner's Report in accordance with the I I requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~_J~* I Commission rJ.I! <.-1..2.. T If,J Z:-d I I Ins C>f'SSi9ii8ture National Board Number and Endorsement I Date lf ' 20.(__£_ Page2 of2
THE: NATIONAL BOARD CF" BOILER AND PRESSURE VESSEL INBPECTDRS NQ.. \\60, P..N. 7, (09tnl1 S\\ FORM NVR*1, REPORT OF REPAIR/REPLACEMENT ACTIVITIES FOR NUCLEAR PRESSURE RELIEF DEVICES CATEGORY OF ACTIVITY: 1 0 2 [£) 3 0 IU:PAIA IZI REPLACEMENT CJ RERATING 0
- 1. WORK PERFORMED BY: NWS Tedmologles, LLC (name of 'NVR" ilUthorlzed organization )
131 Venture Boulevard, Spartanburg, SC 29306 !address)
- 2. WORK PERFORMED FOR: First Energy Corporation I Beaver Valley Power Station (name)
Roule 168, Shippingport, PA 15077 (addrnlil o,--~*
- 3. OWNER: First Energy Corporation i Beaver Valley Power Station (name)
Route 188, Shippingport, PA 15077 !address) 0025 (P.O. no.. job no.. l!tcJ
- 4. NAME, ADDRESS, AND IDENTIRCATION OF NUCLEAR POWER PLANT: First Energy Corporation I Beaver Valley Power station (name)
Route 1ee, Shippingport. PA 15077 (lldd-*l Unit 1
- 5. a; REPAIRED PRESSURE RELIEF DEVICE: Pressurizer Safety Valve
~~~~~.......:::.~~~~~~~~~~~~~~~~~~~~~ b: NAMEOFMANUFACTURER:_T_arget..-__R_oek~CO __ rpo.:..-ratl __ on ______________ ~------------~-----~- c: IDENTIFYING NOS.! 0569C Pilot 4 /Main 1 n/a steam ltypel {mfg. serial no.) [H.at'I Bd NoJ (servke) d: CONSTRUCTIONCODE: _A_SM~E_/_111_1_1 ___ ~-~---~ 1968 S'68 (name/secliGnfdlvbionl (edltloD) (addencb}
- 6. ASME CODE SECTION XI APPLICABLE FOR INSERVICE INSPECTION: _2_0_01 __ _
(edition)
- 7. ASME CODE SECTION XI USED FOR REPAIR/REPLACEMENT/REAATE: _2_00_1 __ _
(edlllon)
- 8. CONSTRUCTION CODE USED FOR REPAIRIREPLACEMENT/RERATE: _1_9_68 __ _
(edition) 2003 (llddenda) 200S 8x6 2005 (5ia) ~*r bulltt n/a A ---- (mde case(sll (code class) nla {c:cdem.00) n/a (code caseWJ n/a
- 9. DESIGN RESPONSIBILITY: _nl_a _____________________________ _
- 10. OPENING PRESSURE: _2_4_8_5 __________ _
SLOWDOWN flfappllablel: _nl_a ________ _ SET PRESSURE AND BLOWDOWN ADJUSTMENT MADE AT: NWS Technologies, LLC USING steam
- 11. DESCRIPTION OF WORK: llndude name andldentJfyfng number of replacement parts): Disassembled. Components cleaned and inspected. Disc and seats lapped and polished. Wear areas buffed and lubricated as required. Valve reassembled.
Certified set-pressure and seat tlghtneSs using steam. Jacked and lapped main to Improve (contfnuec:!' In REMARKS)
- 12. REMARKS; NWS Traveler#: 13-313 and 15-217. No ASME Section XI parts replaced.
DESCRIPTION OF WORK (continued): seat tightness. Post certification N2 tightness and belloWs integrity tests SAT. Thtdorm may be obtained tlomlhe National Board ofllolloralldl'renureVessel Inspectors* 10SS Crupper Avenue,~ Ohlo-43229-1183 Pase 1 at2
O THE NATICNAL BCARD IJF BIJILER AND PREBBUAE VESSEL INBPE:OTOAS CERTIFICATE OF COMPLIANCE 0026 (fonn "NVR' registration noJ 47859688 [P.O. no. job no., etc.J I, Jason C. Gibson , certify that to the best of my knowledge and belief the statements made in this report are correct and the repair, replacement. or rerate of the pressure relief devices described above oonfoml to Section XI of the ASME Code and the National Board Inspection Code "VI\\ &"NR" rules. National Board Certificate of Authortzotlon No...::6;.::;32=--------------to use the "VR" stamp expires April 03, 2018 National Board ee7*ficate of Authortzotlon No. 81 A to use the "NR" stamp expires April 09, 2018 Date I f3(j~ Signed ~ ~ ~QA"-'-'Ma=n:.:.:ao..g<=er'------------ T ~ ft!pmentat1veJ 1t111e1 CERTIFICATE OF INSPECTION 1, Paul D. Seala , holding a valid commission issUed by the National Board of Boiler and Pressure Vessel Inspectors and certificate of competency;-Where requlred;1ssaedilyth"!1UtiselictiotHif~ C&rolina
- and employed by The Hartford Steam Boller lnspec!lon and Insurance Company of Conneclicut of _H_artfo rd"'='CT-=~-..,..,..-------------
have inspected the repair, replacement. and/or rerate described In this report on 8--'?./-/(;; and state that to the best of my knowledge and belief, this repair or replacement has been completed in accordance with the Code specified and the National Board Inspection Code "VR' &"NR"' rules. By signing this certificate, neither the undersigned nor my employer makes any warranty, expressed or implied, concerning the repair or replacement described In this report. Furthermore, neither the undersigned nor my employer shall be liable in any manner for any per50l'lal injury, z:rty damilge, or 1055 of ~~-~l!!'l_~ged~th thl5.lnspectlon. Date ~/G Signed NB t 13104 (IS, A, N, I, C) SCI 263 lipector) (National Board and endorsement) This form may be obtalMd r"'"' The National Board of Boller and Pressure Vessel f115pectors
- 1 oss CNpper Avenue, Columbu~ Ohio 0229-1183 Page2of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRSIREPLACEMENT ACTIVITY fJ.Ji Required by the Provisions of the ASME Code Section XI NOP-CC.5703-02 Rev. 02 Recort Number 3959
- 1. Owner FiritEnerg}! Nucle9r 012erating ComQanl!
(NAME) I Date October 11, 2016 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No. 1
- 2. Plant Beav~r V51ll~~ Power Station (BVPS)
(NAME) P.O. Box 4, ShiReing12ort, PA 15077 Order#200571938 (ADDRESS) Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shi12ein912ort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date N/A
- 4. Identification of System Auxiliary Feed Water (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, 271. Addenda, Code Case:::
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 20D1E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Pipeline FirstEnergy NIA NIA WAPD-64 2013 Installed No Ball Valve BNL Industries A141009 NIA 1FW-83 2015 Installed Yes (1) Pipe, 3" NPS Energy& NIA N/A Ht. #484187 2014 Installed No Process PC 1 Elbow, 3" Energy& NIA N/A Ht. #48637 2016 Installed No NPS Process PC 18 & 19 Flange, 3" Energy& N/A N/A Ht. #ZPG PC 2016 Installed No NPS Process 2
- 7. Description of Work ln1mlled new valve, Riee1 1nd fittings.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure l8I ExemptO OtherO Pressure psi Test Temp. OF Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703-02 Rev. 02 Reoort Number 3959 "Record test pressure ana tempe111ture
- 9. Remarks Code Data ReQort for valve attached.
Applicable Manufaelurer's Data Reports to be atteehed CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp N/A Certificate of Authorization No. NIA Expiration Date NIA Signed Thomas While ~ EngineerV Date October 11th I 2016 Owner or Owner's Designee, itle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler lns12ection and Insurance Com12anl'. of Conneticut of Hartford, CT have inspected the components described in this Owner's Report during the period .S-- ~)..-Ir to 10-rr-t." , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance I I with the requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection_ I ~-)~ I 19~ I Commission r.I JJ ? 'I' J..F r!-/:Z-d I Inspector Signature National Board Number and Endorsement I Date LfJ-t r- ,2ol_L Page 2 of2
( J CDRRECrED COPY 2/2/15 FORM NPV-1 C&RTIRCATE HOLDER'S DATA IEPORT FOR NUCLEAR PUMPS OR YALVEr As Required by the Provisions of the ASME Code.. 8ullon Ill. Dlvlllon 1 Pg.1of_L BNL INDIJS1RleS INC. 30 INOUSTRW. PARK ROAD. VERNON. CT 06066 t-tnd-atN-.-
- 2. MariuhGuredfor ______
Fl_RST E_N_ERG_v_s_ERYICE COMP__,_NlY_!"". 7"!"!6_SOUT--==-H~W.-.,-IN_S_TREET ._AKRON ._o_,._44_30&
- 3. Locallon of inllUlltalion Bl!A\\IER VALLEY NUCLEAR POWER Pt.ANT, 1 ROUTE t6il, SlilPPINGPORT, PA 15077
- 4. ~INo.,SeriesNo..orT~ ___
vAJ.:_VE ___ Drwwillfl GBV-82-30.0115 Rev.
- s. ASME Code, Sectron 111, Dmsion 1 um W72 3
__ llf_.._I_
- 6. Pumporvahle __
vAL_VE __ Nomlnet inlel llze ___ 3_* -- 0ut1etm ___ 3_* __
- 7. Materiel (II VllW Bod)'
SA-105 lb) pump C.ing ___ _ (Ill Cel1lfil'atll Noklet'll $41r111Mcl. Bal\\nel Cover---- 1111 Nttlon-4 Board No. Dl8lr. SM7fl 1u1e BoltfnD SA:t53G B.&&0 8ol'llnt---- IQOI ca.11,.. 1 "614ii:11-' infllmlilllon In Iha fann or i-. "'-lln, ot 'llmwlnel ll\\IP/ Dlt Wiii Plmdllll: Ill *lie II a*la x n; 121 lnfotmllioll l!l lliilllls 1tlWOllgll.CDI!1111s o.ra Report I* lndudlMI Oft<llllChlheel: *nd 131-h.,_II nlllllbelecl endn ftl.lllllllf ol l!Mm I* ""'lll'dld st°"' tap of UV. btn.
J CORRECTED COPY 2/2/15 FORM NPV-1 Ulack - Pg. 2 ot_2_J Ceni11ca111 Holdllr'I S.rllll No. A ' 41009-11-<1> S. Design condftlOllS __ 111 1 0 1 _ __,,,__ _ _,_ __ or valve premit111t&lll:s _____ l"HS_1_900# b.,...,-....1
- 9. Coklwoltingpressure 2160PSIG@100"F
- 10. H~rmtmic teSt __
a3_SO_PSl_G __
- Disk dllferentllll IHI pll!ISSure _________ 2_460 PS_IG _________ _
- 11. Remark&
CERTIFICATION OFOlSIGN Design Spoclficallo11 certified by _______ John w_._Dl_ngler""""'------- P.E. sui1e __ n._ Reg. no. 062 *OlB!il 53 Oe$1gn R11p011 c:enlfled by P.E. SUlle _ R90. no. QRllFtCATE OF COMPUANCE We cenify Ille! lhe "'8tell1Clntl mede In Ulla n1pon *re correct 11nd that this pump or Yllhle -forrrm Kl thlt rvla for conlltrucllon af lhl ASME Codo, SeaioR 119, OMl!bl 1. N Certitlc11e of Aulhoriultion No. _______ N-2882 _________ hpires _______ 11_11_0tal Neme CERTIFICATE OF INSPECTION I, the undtr$19necl, holding e velid commission iuutd by the Na1io"61 Soard of Boller end Pressure Vasel lnspeotare and eftlploved by ONECIS INSIJRAlllCE COMPANY ol L YHN, MA h-lnspec;alld tlMI pump, or 1111lve, dncribtd In this Ollta,..011 on
- 'l::, Lr. J ff:
, Md lltll\\e lhel to the bat af mv ktl-leclge and belief, the Certlflcale Holder h8a comlnlctlld !his oumP. or nMt. In-~-* Che ASME Code, Secllon IU, Olvlslon 1. 8y tlgnlng Ulla celtllic:eto neither the lnepec!ot nor hil employer makes eny -rl'l!lnty, eicpniaed or Implied. 00111:11mina lho cort1Ponent dllSCribed in thla 1>1111 Repon. Ful#lermore. neither the Inspector CIOf 11111 employer s11111 be nlblo In tltllf l'ftlllll'ler tor any perr.onat il\\iury IN' Pl'Ol*tY dllm4(lll or* I-af ony kind erisin111 from ore~ with=* Dste -z,/.i.pr Signed.>~~ Commission
- 1'.?Jt /J,4.~.tJS 1....---.... --.
1117111!
- 41 s
FORM NIS-2 OWNER'S REPORT FOR REPAIRSIREPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Reoort Number 3968
- 1. Owner FirstEnergy: Nuclear Ql2.@rating Comi;u~n)'.
I Date October 26, 2016 [NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 2 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valley: Power Station (BVP§}
(NAME) P.O. Box 4, Shii;!12ing12ort, P8 15077 Order #200646202 (ADDRESS) Repair!Replacement Organlza\\lon P.O. No., Job No., etc.
- 3. Work Perfonned By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shigming12Qrt, PA 15077 Authorization No. NIA {ADDRESS) Expiration Date NIA
- 4. Identification of System Residual Heat Removal (Class C)
- 5. (a) Applicable Construction Code ASME Section Ill
~ Edition, li{8 Addenda, Code CaN f:Y.8 (b) Appl!eable Edition of Section XI utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s):
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed <Yes or No) Heat Joseph Oat 1832-1 368 1RH-E-1A 1969 Corrected Yes Exchanger Co. Stud, 1-3/8" Trust NIA NIA Trace Code: 2012 Installed No Manufacturing PPl8 Nut, 1-318" Nova Machine NIA NIA Trace Code: 2012 Installed No 6X20
- 7. Description of Work R~12raced one stud and two nuts.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure D Exempt l2:Sl OtherO Pressure psi Test Temp. OF Page 1 of2
FORM NlS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 "Record te61 pressure and temperature
- 9. Remarks No Code Data Report available. Previous NIS-2 Data Report No. 3676.
Applicable Manufacturer's Data Reports lo be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct andJhat this conforms to the requirements of the ASME Code, Section XI. Certificate of Authorization No. Expiration Date NIA CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period I S--J.. ~ -r...r-to / 15 - """.r-- /(;. , and state that to the best of my knowledge and belief, the I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examination~ and corrective measures described in this Owner's Report. Furthermore, neither the
- inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~A ' 7 _* r/ Commission,J J y t2 f A# _c-,# -f-'--""--=-1-ns ..... p-~.......,o'-r's ...... S'""i""'gn-a'""'tu-re_____ National Board Number and Endorsement Date _.._./(_-_,;__f _-____, 20 !_'-'_ Page2 of2 I I I I I I I I I I I I
tUHll lM lllANUl"l\\(.;"l'UllMUi' llA ft\\ 11'1'4rUIU. l'UH lJ"I' llH'.11 1*nr.~u1u*., fl'..;:t.:11:.. a..., 'af/,h ~ ~ q'Z. 4s req*ired hy the Provisions of the AS~ Cctde '!_al~s o/tG/14._ I. Manufar.rurcd by JOSBPB OAT & SONS, IR9w.J~1ir!1!~'* PBNNAa WBSTINGHOUSB ELECTRIC 'if~*.na1:£!~f \\l!'i!;,, PA. ciifrh _..n.. sw ......__ ____ n. r. ___ no
- 6. HEADS (I!) Marnial -------.,,,.....--
Loc:11t1._ tr-1> (Top, boUom, "'1da) Tbk:='** Kadiv* T.S.""" (h) Mart1iaJ _______..,.....,,......,.._.....--""..,,...._T.S * ........-ki* 'EtUpllcoJ C**ral Heftli'fph,.rlrai Plat Sldf' lo Pntnure ktldi,.* ~al io Ape* Ang I., RadiVll Diameter (Cunveo or CortU1"'f) Top 7~6 11 36" __ _L3{.8" --=--* (b) If reaiovabie, bobs u111!'<! _ __...?!.'_ 11 r6-*d d**
- crll:ae ***.m*
r....,....., *t:* ..... **Id* or Ginh DP H.T. no X.R.c:omp] etaenionrd.. DO-.-- No. of ('0UJ5t>S... i....... --
- 14. "E,\\DS,~}MIM!Tt.tiSMfMlZHP~.s. lSQGQ;*'(b)MaR'rial T.S.
Ce) Mtm."ri*I __ T.S. ----- ii.ff.':'}f:,;,., H.,'W:ical Flal PMlllH!f,'fr Side IO..,... ure (C-"91J OI Cone*"") _ _.....__ ooncaav:e tc)_Fktatina If wmovab.lc, bohs u*C'd (a) *-111'.itir~c-W-J.. T"Jr.;'Rra.r.W\\!WiO)*-*---- ____ lbl _ --* ----*---* -*.. **----*-- *-**---.,_. (c) *--------------- Orlwr f.ls1t<n.i1111 -~ ..... Aii.iiiti"Slie1;:i)1" - ll~wuadc: l~. f:ons1tuc:1ed for m;11a. '-lin.1cmp. (111hrn Te.s1 all-able worlling '""'"*' 600 P** 111 ma.. tt"Jlll>.4QQ hc*s iie-l01111 &o b11: ~omplct@ fo1 all vc:Hcls *lierc applkabh:. "F. !l!'U ahan -lO"J "I'. Xllllllllll\\DI Prt'HH"':) J 3Q
- 16. SAt*i::n* VALVE OlJTLElS: Nvmkr -------- ---- Si7.c --* --------- Lix:a1io1A ----------
- 17. NOZZLES
~*" (Jnl*t, shel!'.. tn=~ and oat:let lffaea\\@fefnlet 2 ____.10*_ ctra!ii & vent _-_:-_ _,_3=:_-=_-_- --3/4" T~p* pipe Rrlnlor&:l'ment Mll!nial Thkllnu11 lllst11rl*f SA53GRB ~ 11 none SA312DQ4_.sch_.A.Q_ SA2401'304 --"-- '°""*>
i: " . I
- "'~ "'"
~I\\ Io.I
- 18. INSPECTION Manhole", No.-*-* -* _ * * **.. ~.~:.~~ ~i~c:2._ ___ *_:~_:* __ ~- f:o, iii.;:,;'*:~~:;~~:~~-..._:_: __ ~~'.:*~ :
9-f'f-;(ljl!f\\.'GS; lhmdhetk.., 11.;.,, -~- ........... ---*-- 'i;r.l* --4-~*~-': :-;-~~*-- l.on11i11fl ***,;*~~--:-~
- n,r... aJt*d. No.. *".--~ **-*.
- w. *--.... **-*--Sir.~ ---* ----~*------ l.n,*atillft ~.. ----*----- __
- --~*----~-*.... _..._,,_......-.......... -
JIJ. SUPPO.RTS: Skin-.*-*~-,,---"""-.----- l.11w;_ 2 ___ l.c,1:11 --,,,~- 0.clH:r ---. ... _ _,,_....-. Ao;a._1.1-3P.o.Jm.ot_ .. ~ ~: ~'* ; ~v~~ or"'" ~' t t
- ~um1w"i (Nunu~:~
1 _,.,~***r".!**~.. J;. '411i!llf* 2~: RF.MARK.I;:. __ vwe1 is ll... Yitr.tie~l_...te~~~D~l.. bHt....~ _ _'j,,.YJ.:tt.JKi.*:oat...-~.a~.-- 4.957 and 495~. and the_.ASMF. Code s.~tj.on VIII_; £or Shell side.:8fld Section Ill Class c *fbr ttme tiU-iataft""~.;- * ~-~-""""-'_ Westtngtiou ae co-;-ttem--wo**-.. Sl:'llf: ~-1* --~-'.... --! -**** ~--.~ *-*****~-* * -*** r.~U.-.. *-
- ---"~
.. *-~*-* --.*-*-****1--.,,-*-* ............. _.. ~-'***,.~. '* ~ ,.L ~~tsSEI. MAl>E llYJQS. _.. Qat. .. ' ~... r ~*:~Tf!~l:fffhf~~ ~~~~J~Sl'f.'::1~8~i::::. & ~ona~ __ l:nc..t~:-!..::_:., __ Philadelphia *.. Pa.. I. lhc: undrtsagnt"d. huid1n~ a \\'H1aff: t:un1nu*u,,u111 a!'l~Ut:tl h\\* tlu* N'61in11nl Huard uf ICuJl**r ii1ttd l'ri:s~l*Uf~ \\'rs!-:t*l lu~1>1**: 1*.*r~ ;md,,, thr Stair nf __....... -. __.
- -- """ rmplo~ed l>y
.............. __ ***--------*...,,,. cumr1m* I Hw ~l.ill'm!'nlh in lhl* munuforhm*r*~ *:Juli' rt>p*,n , * ~~th lhr dei;.c:,;*~~;s:;,~a~~~* ~r~al'I ond 1!}11lr lhial psrls relnrod In"" dehf)(~~t<.... --~-* _._.... ~, "llDI ilu:luded in 'lh't' Ctrlifii'ale Of SbOp lnsptcllr.m hHvl.' ftllt*n U1t;pl'Ch*d by <'1e 11nd lhal IO lh* bnl n( my knoWll'dl'.f' t111tf ln*hrf lhr manuf11clurrr hH t'OllGlruttl'd and A"5rmbl"d thas pn*11sure '"'"*' in frCC'Ordantr wHh !bf' qpplitablr
- sl'rtinni. of lbc: ASl'E
&ill'r a11d PrE-&surr Vrssf'I ( oc1... Th" d!!s.:nbt'd '"Kfil!I "'as 1n,.p1*rll'd *nil &11b1rctt'd lo It hydro1<fglk 11**! of '...
- 1151.
v ,* * ~~I I I I l "' t (._ ~ t =
- \\..
~ I .,,. ***'"*** *ro,.,mo*~arm~~,;.
.,,~-i-;;;:~;:riir.:----------
~ **
- IJ ','* :*
l' Prinu~J in 1:.s.,\\, (7 /M>) Thl:. lorm j,, *.1hro1i11ubl<* horn 1111* AS!'tfl-., 1.1~ I;. *l71h !'1.. !':<*\\\\*\\'or~.. !':.Y. tflllJ':'
- t
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3974
- 1. Owner FirstEnerg): Nuclear Oi;ierating Comgan>:
(NAME) I Date October 22, 2016 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Valle~ Power Station (BVP§l (NAME)
P.O. Box 4, Shigi;iing12ort, PA 15077 Order#200651450 (ADDRESS) Repai'/Replacement Orpaniza11on P.O. No., Job No., elc.
- 3. Work Performed By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA (NAME)
P.O. Box4, Shii;?ginggort, PA 15077 Authorization No. NIA (ADORE SS) Expiration~Date N/A
- 4. Identification of System Reactor Coolant (01)
- 5. (a) Applicable Construction Code ANSI 831.1 1967 Edition, S'71 Addenda, Code Case=
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (o) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Ball Valve Fisher 5487946 NIA PCV-1RC-1975* Corrected No Controls 455A Vee Ball Fisher PA6839-1 NIA Ht. #16508 2011 Installed No Controls
- 7. Description of Work ReQlaced Vee Ball.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic" D Nominal Operating Pressure D Exempt 181 Other D Pressure psi Test Temp. OF 'Record test pr11$$l.1111 and temperalure Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Report Number 3974
- 9. Remarks ~o Code Data Re(:!ort available. *Year i;;ilaced in service was 1976.
Applicable Manufacturer's Da:ta Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. NIA -Expiration Dater- ... NIA Signed Thomas White ~ EngineerV Date October 22nd ' 2016 Owner or Owner's
- signee, itle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Bojler ln§12ection and Insurance Qom12an~ of Connecticut of Hartford, CT have inspected the components described in this Owner's Report during the period s--.;z..~-c:..r to L. "
- 2-Y'-/'
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance I I with the requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ~_1~ I Commission ;J& '1¥.;... r A.../:i:,Lf I I lnspe ~nature National Board Number and Endorsement I Date /0-).. ~- , 20.Lk_ Page2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRSIREPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI \\lOP-CC-5703-02 Rev. 02 Report Number 3975
- 1* Date October 19. 2016
- 1. Owner Fj[stEnerg~ Nuclear O~rating Comi;ian~
(NAME) 76 Soyth Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver Vallel! Power Station (BVPS}
(NAME) P.O. Box 4, Shi~Qing(2ort, PA 15077 Order#200692196 (ADDRESS) RepairlReplacement Organization P.O. No., Job No., etc.
- 3. Work Perfonned By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shi121;2inggort, PA 15077 Authorization No. NIA (ADDRESS) . Expiration.Date NIA
- 4. Identification of System River Water (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 ll!§Z Edition, 5'71 Addenda, Code Case =
(b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National Removed.
ASME Name of Name of Manufacturer Board other Year or Code Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No) Pipeline Stone & NIA NIA WR-20 1976* Corrected No Webster Plate, X" Energy & NIA NIA Ht. 2012 Installed No Process
- A 1Y 4236-05
- 7. Description of Work Installed reiaforcing 12ad 12er Code Case N-789.
J. Tests Conducted: Hydrostatic* 0 Pneumatic" 0 Nominal Operating Pressure f8l ExemptO OtherO Pressure psi Test Temp. OF "Record test pressure and lemperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703-02 Rev. 02 Re ort Number 3975
- 9. Remarks No Code Data Report available. Previous NIS-2 Data Report No. 3817. Reinforcing pad installed per Applicable Manufacturer's Pala Reports to be atlached ASME Code Case N-789 Rev. 0. which was evaluated per ECP 16-0434-001.
CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp..:.N=/A'-'------------
- "--E-xpiration*fiate- ___... N"""/A-"------
. 20...:.16"--_ CERTJFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period 1 J: -.:>.. J. - IS-to I O - / 'i - I ' , and state that to the best of my knowledge and belief, the I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XL By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date _ _,,,l...... tJ..__.-'-/..._'1_*~----, 20 Lfz_ Page 2 of 2 I I I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI ~P-CC-5703-02 Rev. 02 Report Number 3976
- 1. Owner Firstl;nerg~ Nuclear O~rating Com(2an:t I Date October 19. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1
of 1 (ADDRESS} Unit No. 1
- 2. Plant Beaver Valle~ Power Station {BVPS}
(NAME) P.O. Box 4, Shi1212ing12ort, PA 15077 Order #200692287 (ADDRESS) RepairlReplacement Organization P.O. No., Job No. elc.
- 3. Work Performed By BVPS Construction Services Type Code Symbol Stamp NIA (NAME)
P.O. Box 4, Shi(2gingeort, PA 15077 Authorization No. NIA (ADDRESS) Expiration Date N/A .~ ----
**--~-- -~-*
- 4. Identification of System River Water (Q3)
- 5. (a) Applicable Construction Code ANSI 831.1 li[l Edition, S'71 Addenda, Code Case=
(b) Appllcable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-2003A (c) Applicable Section XI Code Case(s): NIA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other or Code Stamped Comoonent Manufacturer Serial No.
No. Identification Installed (Yes or No) Pipeline Stone & N/A NIA WR-20 Corrected No Webster Pipe, 20" Energy & N/A NIA Ht. 2015 Installed No NPS Process
- 140400585
- 7. Description of Work Re1;2laced section of QiQe. Performed weld buildug of exi§ting in area of welds..
J. Tests Conducted: Hydrostatic"' D Pneumatic* D Nominal Operating Pressure [81 ExemptO Other D Pressure psi Test Temp. OF 'Record test press..., and lemperature Page 1 of 2
FORM NIS~2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC.5703-02 Rev. 02
- 9. Remarks No Code Data Report available. Previous NIS-2 Data Report No. 3817.
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp.... N .... /A_._ __________ _ Certificate of Authorization No. NIA I 20.-16---._ CERTIFJCATE OF INSERVICE. INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford. CT have inspected the components described in this Owner's Report during the period I S: - J.. J- - /.r to I 6 -/ f -/ 6 , and state that to the best of my knowledge and belief, the I I I I I I I I I I I I I I Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. ~__/.').A >JI Commission rJJ 7 'f J.-f A~..I,tf --'-"--......:;;.;...;.-1-.n-s~--:.,,.o-r's-S""'i:;..gn-a-tu-re----- National Board Number and Endorsement Date _ __,_! ___ D_-_,_l_,f.._-____, 20 {_£_ Page 2 of 2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Report Number 3977
- 1. Owner FirstEnerQl! Nuclear O~rating CQ.
I Date 10.:22-2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Vallel! Power StatiQn (BVPS}
(NAME)* PO Box 4, §hiRQing12ort, PA 15077 Order #200667690 (ADDRESS) Repair/RA!plaoamenl Organization P.O. No.. Job No.. etc
- 3. Work Performed By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA (NAME)
PO Box 4, ShiQ(!ingQort, PA 16077 Authorization No. NIA (ADDRESS) Expiration*Date ~., -- NIA
- 4. Identification of System 4kV Station Service Svstem. BV-1-36-Svstem (Q3l
- 5. (a} Applicable Construction Code ANSI 831.1 1967 Edition, S'72 Addenda, Code Case NIA (b)
Applicable Edition of Section XI Utlllzed for Repair/Replacement Activity 2001 Edition to 2003 Addenda (c) Applicable Section XI Code Case(s): WA
- 6. Identification of Components Corrected,
- Removed, ASME Name of Name of Manufacturer National Board Other Year or Code stamped Comoonent Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Valve Electro-NIA NIA AOV-1EE-1978 Removed No Motive Diesel 217 Lubricator Electro* NIA NIA INJ-1EE-2A 1978 Removed No Motive Diesel Valve Engine NIA NIA AOV-1EE-2009 Installed No System Inc. 217 Lubricator Engine NIA NIA INJ-1EE-2A 2016 Installed No System Inc. Pipeline# Pipeline Electro-NIA N/A 1.5"-ASC-1978 Corrected No Motive Diesel 230-MFR-03 Electro-Support# Support Motive Diesel NIA NIA ASC-229-1978 Corrected No PSR-3 Page 1 of2
FORM NIS*2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP*CC-5703-02 Rev. 02 Report Number 3977 -~**~ Electro-Support# Support Motive Diesel NIA NIA ASC-230-1978 Corrected No PSR-1
- 7. Description of Work Removed currently installed air start valve and air line lubricator and ref;!laced with u12gr9ded com12onents. This reguired the i;ii12eline and associated su1212orts to be relocated a short distance away.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure IZI ExemptO Other D Pressure psi Test Temp. OF "Record test Pf&SSU!ll and temperature
- 9. Remarks No Code Data Re12orts available. No 12riQ[ f:!IS-2 data regorts.
Aoolicable Manufacturer's Data R""""s to ba attached * * ** CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA Certificate of Authorization No. NIA i~ Expiration.Date NIA Signed Thomas M Calko, Engineef Ill ~~ Date Oct 22, 20 1§_ Owner or Owner's Designee, Tifi :: CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of I Hartford, CI have inspected the components described in this Owner's Report during the period I ,J- ).,)_,-/ J' to L_O "&i.J- /ft, , and state that to the best of my knowledge and belief, the Owner I has performed examinations and taken corrective measures described in this Owner's Report in accordance with the I I requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any I kind arising from or connected with this inspection. I ,flwv _J :__I/ I ,..;!lft;~r 14-..J_:e-& I Commission I lnspeC)Pf's Signature National Board Number and Endorsement I I Date f ( I 20.{_fE_ Page 2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Report Number 3978
- 1. Owner FirstEnerg~ Nuclesr Qgemting Qo.
I Date 11~22-2016 (NAME} I 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valle)! PQWS![ Statioa !BVPS}
(NAME) PO Box 4, Shi~U~inggort, PA 15077 Order #200687688 (ADDRESS) RepairlR~C!'ment Orgal'lizeUon P.O. No., Job No., etc. 3.. Work Performed By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA (HAMEi PO Box 4, Shiggingeort, PA 15Q77 Authorization *No. **** NIA
- w-., *
(ADDRESS) -Expirati~ll_D~te_:.** N/A .. *--~ ~~---------
- -~ -
- 4. Identification of System 4kV Station Service System, BV.:1-'36-System103)-- --* - *
~-------~-
~
- 5. (a) Applicable Construction Code M!SI 831.1 1967 Edition, S'72 Addenda, Code Case NfA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (C)
Applicable Section XI Code Case(s): ~ 6, ldentifioatiofl-0f-Gamponents ~* ~ Corrected,
- Removed, ASME Name of Name*of - * *Manufacturer
-National-Soard Other Year Qr ...... Code Stamped Comoonent Manufacturer Serial No. No. Identification Built Installed <Yes or Nol Valve Electro-NIA NIA AOV-1EE-1978 Removed No Motive Diesel 218 Lubricator Electro-N/A NIA INJ-1EE-2B 1978 Removed Ne Motive Diesel Valve Engine NIA NIA AOV-1EE-2009 Installed No System Inc. 218 Lubricator Engine NIA NIA INJ-1EE~2B 2016 Installed No System Inc. Pipeline# Pipeline Electro-NIA NIA 1.5"-ASC-1978 Corrected No Motive Diesel 235-MFG-03 Electro-Support# Support Motive Diesel NIA NIA ASC-234-1978 Corrected No PSR-3 Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP..CC-5703-02 Rev. 02 Reoort Number 3978 Electro-Support# Support Motive Diesel NIA N/A ASC-235-1978 Corrected No PSR-1
- 7. Description of Work Removed currentlll installed air start valve and air line lubricator ang reelaced with u12graded com12onents. This reguired the QiQeline and associated su1212orts to be relocated a short distance.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure ~ ExemptO OtherO. . Pressure psi Test Temp: OF 'Record test pressure encl t<lmpereture . --*-*-**-~- ... ~. _ _R~r:na.rks ~o Code Data Re12orts available. No 12rior NIS-2 data regorts. Annlicable ManufaclW'er's Data ReDOflS tobe-attacllad ** -.- -**-*-.. --::--"-----~-*---------*--- -*-----~ ---* ---*-*-~------- ~.. -*-***-----. -*----~-- ---~- - - *""~-.,.,.,..,...,,....o_~.=-**,- CERTIFICATE OF COMPLIANCE I certify that the ~tatements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. Type Code Symbol Stamp NIA -certificate.of Authorrzaflon No. ----wA**- -* E> piration Date N/A*
- ----*~
Signed Thomas M Calko Enainee I fJ -/!)(~- Date Nov 22, 20 1§_ . _QwnernLOwner:'s Designee, Title-:. CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding* a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I and employed by The !j§rtford Steam Boiler Jnsg;iection and Insurance Com2anx of Connecticut of I Hartford, CT have inspected the components described in this Owner's Report during the period I S-.;Lol-JS to / 6 -.)..J':--/ lo , and state that to the best of my knowledge an? belief, 1he Owner I has performed examinations and taken corrective measures described in this Owner's Report in accordance with the I I requirements of the ASME Code, Section XI. I I By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, I I concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the I inspector nor his employer shall be Hable in any manner for any personal injury or property damage or a loss of any I kiOO ;:::i ~r.]~is inspecibn I I I Commission,JJ?t.f;;..V f(j.,,J :r ~ I lnspe i"'SSignature National Board Number and Endorsement I I Date /1-J..f-20 I b I Page 2 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3983
- 1. Owner FirstEneml'. Nuclear Ooerating Com12an~
I bate October 31. 2016 (NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No. 1
- 2. Plant Beaver V£1llel'. POW§r Station (BVPS~
(NAME) P.O. Box 4, ShiQQing12ort, PA 1§0n Order #200643918 (ADDRESS) RepairlReplscemenl Organization P.O. No., Job No., etc.
- 3. Work Performed By BVPS Mechanical Maintenance Type Code Symbol Stamp NIA (NAME)
P.O. Sox 4, ShiQQin9Qort1 PA 15077 Authorization No. NIA (ADDRESS) ~~-- E;~piration Date NIA .. ---~--~-
- 4. Identification of System River water ras1 ~, **--* **-* **----*. *---.. ~-
- 5. (a) Applicable Construction Code ANSI 631.1 1967 Edition, ~Addenda, Code Case NIA (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 2001 E-20QM (c)
Applicable Section XI Code Case(s): NJA
- 6. Identification of Components Corrected, National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. lden6fication Built Installed (Yes or No) Expansion Garlock 04-1645-2 N/A REJ-1RW-27A 2004 Removed No Joint Expansion Garlock 16-2106685-01 NIA REJ-1RW-27A 2016 Installed No Joint Stud, 1-1/4" Nova Machine N/A NIA Trace Code: 2016 Installed No 27C2 Nut, 1-114" Nova Machine NIA NIA Trace Code: 2015 Installed No 21F5
- 7. Description of Work Re121aced rybber exeansioo i!2int, and flaage styds & nuts.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* 0 Nominal Operating Pressure 181 ExemptO OtherO Pressure psi Test Temp. OF "Record lest pressure and iemperalure Page 1of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Re ort Number 3983
- 9. Remarks No Code Data Reports available. Previous NIS-2 Data Report No. 1724.
Applicable Manufacturers Data Reports to be atlllched CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XL Type Code Symbol Stamp... N""""/A,....._ __________ _ Expiration Date N/A CERTIF-ICATE OF -INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I I and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of 1 Hartford CT have inspected the components described in this Owner's Report during the period I .r,,,). J.. -1..r to /6 -;w--/C, , and state that to the best of my knowledge and belief, the I I I I owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. _,~--=-_,.:_)~_*....., /*~ ~*..;;;..**"""""--/, _____ Commission,J.lf(/).'f /f.,.J_:i::-4 ln~ature National Board Number and Endorsement Date Ir~ ? - 20 I (,, --~ Page 2 of2 I I I I I I I I I I
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI NOP...CC-5703-02 Rev. 02 Reoort Number 3985
- 1. Owner FirstEnei:g~ Nuclear O~rating Cooo1251ny
/ Date November 2. 2016 {NAME) 76 South Main Street - Akron, OH 44308 Sheet 1 of 1 (ADDRESS) Unit No.
- 1
- 2. Plant Beaver Valle):'. Power Statioa (BVPS)
(NAME) P.O. Box 4, Shi1212ing12o!l, EAl5077 *
- Order #200643946 (ADDRESS)
Repair1Replacement Organization P.O. No.* Job No., etc.
- 3. Work Performed By BVPS M§~l:lanical Maintenance..
Type Code Symbol Stamp NIA (NAME) f.0. Box 4, ShiRRing120[11 PA 15077 Authorization No. NIA (AO DRESS}
- Expiration Date NIA
- 4. Identification-olSystem-Feed *water System C02l
- 5. (a) Applicable Construction Code ASME Section \\!Ill 1968 Edition, HQ.. Addenda, Code Case =
(b) Applfcable Edition of Section XI Utilized for Repair/Replacement Activity 2001 Edition to 2003 Addenda (C) Applicable Section XLCode Cas.e.(s);..tf6.. w... --*-*. --. - w
- 6. Identification of.._CompoAents-. -- --*-****---.-- --- ----
- Corrected,
- -* *-National
- Removed, ASME Name of Name of Manufacturer Board Other Year or Code Stamped Component Manufacturer Serial No.
No. Identification Built Installed (Yes or No) Valve, Relief Dresser T~7783 NIA RV-1FW-155 NIA Corrected No Spring Heat# Dresser NIA N/A 23634 (Spring) 1995 Installed No Assembly F2872 (Washer) Disc Dresser N/A NIA See Note 1 Installed No
- 7. Description of Work Inspected valve and replaced spring assembly and disc.
Note 1: S12eclfic serial number installed not known; either ABC33, AB~35, or AAJ75 was installed. ABC33 and ABC 35 were manufactured in 1989; AAJ75 was manufactured in 1985. See note on RRP for more information.
- 8. Tests Conducted:
Hydrostatic* D Pneumatic* D Nominal Operating Pressure D Exempt f8] Other D Pressure psi Test Temp. OF "Record test prealltl'll and temperature Page 1 of2
FORM NIS-2 OWNER'S REPORT FOR REPAIRS/REPLACEMENT ACTIVITY As Required by. the Provisions of the ASME Code Section XI NOP-CC-5703-02 Rev. 02 Reoort Number 3965
- 9. Remarks No Code Data Report available for valve. Prior NIS-2 report# 867.
Valve is ASME Section Ylll and installed replacement components meet ASME Section Ill. which meet/exceed ASME Section VIII requirements. Applicable Manufacturer's Data R&portG to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XI. ~-
- -~
Type Code Symbol Stamp _,,N=/A....._ __________ _ Certificate of Authorization No. NIA Expiration Date N/A - *sJgned Thomas M-Calko. Engineer Ill~ It ~...;;;_***------ UWner or Owner's Des1gnee, "'litle* Date Nov 2, 20 1§_ -
- CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding.a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors I
and emJ?!()Y.esJ_.by Th_e Ha_!'tford Steam Boiler ~!:lspection an~ Insurance Company of Connecticut of I Hartford. CT have inspected the components described in this Owner's Report during the period I .J-~ -/..r to I l -,).,..("-- / & , and state that to the best of ITIY knowledge and belief, the I I Owner has performed. exaroin!';lliQ.OS_~nd ta.ken c.orrective_ m.eas!,lres described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. -~~---_/ 1 ..,.* CJ'- ......,.* __.* *= .. / *_*_* ____ - Commission rl./ f Yd-f /l..V :r& Inspect~ National Board Number and Endorsement Date _ __,_/..... I~--'-?_-____, 20 LI!_ Page 2 of 2}}