ML16342E053

From kanterella
Jump to navigation Jump to search
Revised Page 2 of Repts 50-275/98-02 & 50-323/98-02, Correcting Followup Item Incorrectly Listed
ML16342E053
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/03/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16342E052 List:
References
50-275-98-02, 50-275-98-2, 50-323-98-02, 50-323-98-2, NUDOCS 9804130385
Download: ML16342E053 (4)


See also: IR 05000275/1998002

Text

ENCLOSURE 2

REVISED PAGE OF NRC INSPECTION REPORT

50-275/98-02; 50-323/98-02

,6

9804i30385

980303

PDR

ADOCK 05000275

8

PDR

0

-2-

ITEMS OPENED AND CLOSED

Qp~en

d

50-275;323/

98002-01

VIO

Failure to implement sealed valve program (Section 01.3).

Qgs<~cf

50-275/95-013

LER 'omponent Cooling Water system operated outside of

design basis due to nonconservative assumptions (Section

E8.1).

50-275/94-021

50-275/95-018

50-323/96-003

50-323/94-006

50-275;323

95010-01

50-275;323

95010-02

LER

LER

LER

LER

IFI

IFI

Greater than one percent of steam generator tubes

defective (Section E8.2).

Greater than one percent of steam generator tubes

defective (Section E8.3).

Greater than one percent of steam generator tubes

defective (Section E8.3).

Feedwater ring degradation (Section E8 4).

Review of eddy current examination procedures (Section

E8.5).

Review of structural analysis and growth study for cold leg

thinning indications (Section E8.6).

0 e

dandCose

50-275;323/

98002-02

50-275/98002-03

NCV

Danger tag hung on wrong component (Section M1.1}.

NCV

Failure to provide 10 CFR 50.72 report for greater than one

percent defective steam generator tubes (Section E8.2).

C