0 E Hg FILE COPX The Honorable William Richardson Mayor of Pismo Beach Pismo Beach, California 93449
Dear Mayor Richardson:
This responds to your letter of September 16, 1982 to Chairman Palladino, Nuclear Regulatory Commiss~on, expressing your desire to have specially equipped fallout shelters provided for the residents of your community.
Please recall that a member of the NRC emergency planning staff discussed Mith you by phone on September 20, 1982, requirements for emergency preparedness that are specified in our regulations.
One of the key provisions of NRC regulations is that the nuclear plant operator must declare the emergency and alert offsite authorities to notify the public on the basis of plant conditions before there is a release of radioactivity from the plant.
The purpose and the consequence of this provision is that people have more time available to take protective actions.
In addition, there is a requirement for an early notification system to alert people within a 10 mile Emergency Planning Zone around the reactor.
Since you have pointed out that the jurisdictional limits of the City of Pismo Beach include residential communities within 10 miles of the Diablo Canyon reactor, please note that the early notification system of sirens instal'led'y Pacific Gas and Electric includes Pismo Beach, and goes beyond the 10 mile zone to include Grover City and Arroyo Grande.
The 10 mile Emergency Planning Zone twas the recommendation of a U.S. Nuclear Regulatory Commission and U.S. Environmental Protection Agency Task Force on Emergency Planning.
Their report is entitled "Planning Basis for the Develop-ment of State and Local Government Radiological Emergency
Response
Plans in Support of Light Mater Nuclear Pov]er Plants,"
NUREG-0396, EPA 520/1-78-016, published December
't978 (copy enclosed).
The guidance in this report v>hich has been incorporated into our regulations on emergency planning, includes recommendations on those planning elements considered appropriate, Construction of specially equipped fallout shelters is not considered to be an essential planning element.
82ii05004b 82i005 P'DR ADOCK 05000275 SURNAM+
~
~
OATE NRC FORM 318 (10.80) NRCM 0240
~ I OFFICIAL RECORD, COPY
H
~
T II V
~ ~
S 4
~
0 e0, l The Honorable llilliam Richardson October 5, 1982 In a Presidential Directive dated December 7, 1979, President'arter assigned responsibility for offsite emergency preparedness around nuclear power plants to the Federal Emergency Management Agency (FEIN) and it is now FEI@'s responsibility to evaluate the adequacy of such plans.
Consequently, we are forwarding a copy of your letter to FEMA Meadquarters for their consideration.
I trust this is responsive to your concerns.
Sincerely,
<<Oziginal Signe4&
R. Q. DeYoung"
Enclosure:
NUREG-0396 cc:
R. Krimm, FEIN Richard C.
DeYoung, Director Office of Inspection and Enforcement DISTRIBUTION:
IE Files IE Reading EPLB Reading NRC PDR (w/incoming)
Local PDR (w/incoming)
TERA WDircks JRoe RCDeYoung JSniezek BGrimes SSchwartz FPagano DMatthews JSears
- Attorney, OELD SWelch BMatosko PBrandenberg (EDO-12322)
EPeyton SECY (82-0951)
TRehm VStello REngelken, Region V
MRDenton
- For p'revious concurrences see attached ORC
. -,--> >Z;.EP.LB.......
'URNAME JSears: sc.
DATEf> 9/30/82 IE:EPLB
~
~
r o n
~ ~ ~ ~ ~ ~ ~ ~ ~
DI1atthews 9/30/82 IE:EPLB
.".F.P.RQOM......
9/30/82' IE:DD/DEP-
..$ P;P$.R/PgP....
."..g$t'hKyl:tg.....B'12rimes.........
,10/1/82 10/4/82 IE'PJ QSz.'0/
/8
'IE o ~ ~ ~ ~
.R '. 'g....:
10/g 2"
~ ~ ~ ~ p IP 0'I
~ ~ ~ ~ ~ ~ ~
~
NRC FORM 3 Ts ( To 60) NRCM 0240 OFF1CIAL RECORD COPY
0
,~) f c'
P
)
i W
'4
's a
s j
4 In a";Pr'esidential Directive dated December 7, 1979, President Frter assigned responsibility for offsite emergency preparedness around nucl ar power plants to the Federal E ergo cy nag ment Agency (FEMA) and it is ow FEMA's responsi-bility to ofYuch plans.
Conseq ently, we are forwarding a copy of your letter o
FEMA Headquarters for'heir consideration.
I trust this is responsive to your concerns.
Sincerely, Richard C.
DeYoung, Director 0
ice of Inspection and Enforcement DISTRIBUTION
~IEE F
I8(E R/F EPLB R/F
.NRC PDR (w/incoming)
Local PDR (w/incoming)
TERA WDircks n
JRoe RCDeYoung JSniezek BKGrimes SSchwartz FGPagano DMatthews JSears
- Attorney, OELD SWel ch BMatosko PBrandenberg (EDO-12322)
EPeyton iSECY (82-0951)
Rehm VStello Engelken Denton
- See previous concurrence
- EPLB/I8IE
- EPLB/I8IE
- EPLB/ISE
/
P/I&E
/
8IE DD/I8IE D/I8IE JSears:sc DMatthews FGPagano SSc wartz Grimes JSniezek RCDeYoung 9/
/82 9/
/82 9/
/82 P/
/82
/ 8/$/82 9/
/82 9/
/82
1 4
~ ~ * ~ ~
~ 6
~ ~ ~. ~ * ~ g tE ~
e
~ ~
,""~ ir c,'>$ ~
1l ll
In an Residential Directive dated December 7, 1979, President Carter assigned responsibility for offsite emergency preparedness around nuclear power plants to the Federal Emergency Management Agency (FEMA) and it now FEMA's responsi-bility to review the implementation of such plans.
Consequently, we are for-warding a copy of your letter to FEMA Headquarters for their cons eration.
I trust this is responsive to your concerns.
Sincerely, Richard C.PeYoung, Director Office of nspection and Enforcement
Enclosure:
As Stated cc:
R. Krimm, FEMA D STRIBUTION
&E Fl es I&E R/F EPLB R/F NRC PDR (w/incoming)
Local PDR (w/incoming)
TERA WDircks JRoe RCDeYoung JSniezek BKGrimes SSchwartz FGPagano DMatthews JSears
- Attorney, OELD SWel ch BMatosko PBrandenberg (EDO-12322)
EPeyton RKrimm Rehm VStello Engelken Denton P'/I
&E E
E LB/I E DD/DEP/I&E D/DEP/I&E DD/I&E D/I&E p'Sears:sc DMatthews FGPagano SSchwartz BKGrimes JSniezek RCDeYoung 9/~p /82 9/~p/82 9/g0 /82 9/
/82 9/
/82 9/
/82 9/
/82
I
~y tl
/
S J
I '
9/20/82 Logging Date NRC SECRETARIAT TO:
C3 Commissioner XXXKI Exec. Dir./Oper.
0 Cong. Liaison O Public Affairs Date 0
Gen. Counsel 0 Soicitor O
Secretary 0
Inspector a Auditor Pollc Evaluation Incoming:
From:
Beach California To:
Pal 1 adino Date 9/16 82 r
r te~t s
d demand that all lic for o er. o e..
nuc plant be withheld until emer rocedures xxx a equate y pro ec e
ci~t of Pismo Beach Xgg( Prepare reply for signature of:
0 Chairman 0 Commissioner XQ soo.ec.cL,soL,pA,sscY.tA,ps Date doe:
Sept 29 CI Signature Sleek omitted 0
Return original of incoming with response O
For direct reply.
O For appropriate action 0
For information Recgd Off. EDO
/
0
~
~ e~ e ~, ~.o.'o.ot ~ 'o foretexo Time...."l....
~
~
~
ele ~
~ ~ ~ l~ ~ r~ ~ '
~'
~ 'el Remarks:
Cpys to:
Chm,Cmrs, RF NRC FORM 02A (s-a2)
For the Commission:
'Send three (3) copies of reply to Secy Correspondence and Records Branch ACTION SLIP
li J 4