ML16341B576

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-3, 250 V Distribution in N Battery
ML16341B576
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16341B576 (1)


Text

DONALD C. COOK BRIDGMAN ARCH FSAR FIG. 8.3 - 3 AEP SERVICE CORP.

COLUMBUS, OH 43215 1 RIVERSIDE PLAZA ELEC MECH STR NUCLEAR PLANT UNITS NO. 1 & 2 250 V Distribution "IN" N Battery MICHIGAN 17 INDIANA MICHIGAN POWER COMPANY REVISED PER UCR 620 250 V DC BATTERY "I N" BATTERY CHARGER TRAIN A BATTERY CHARGER TRAIN B AMSAC INVERTER 250 V DC DISTRIBUTION CAB.

"DCN" FRV - 256 POSITION INDICATION CTL BUS FAILURE 600 V AUX BUS BUS "IID" FED FROM 600 V AUX BUS FED FROM BUS "IIB" TURBINE DRIVEN AUX FEED WATER CONTROL BUS VCC "AB-N" FMO-211 FMO-221 FMO-231 FMO-241 QT-506