Notification of NRC Inspection of Implementation of Mitigation Strategies & Spent Fuel Pool Instrumentation Orders & EP Communication/Staffing/Multi Unit Dose Assessment Plans (05000313/2017008).
ML16312A067
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/03/2016
From: Greg Werner
Division of Reactor Safety IV
To: Richard Anderson
Entergy Operations
References
Download: ML16312A067 (9)


See also: IR 05000313/2017008

Text

November 3, 2016

Mr. Rich Anderson, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF NRC

INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES

AND SPENT FUEL POOL INSTRUMENTATION ORDERS AND

EMERGENCY PREPAREDNESS COMMUNICATION/STAFFING/

MULTI-UNIT DOSE ASSESSMENT PLANS (05000313/2017008 AND

05000368/2017008) AND REQUEST FOR INFORMATION

Dear Mr. Anderson:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a mitigation strategies for beyond-design-basis external events, spent fuel

pool instrumentation, and emergency preparedness enhancements inspection at Arkansas

Nuclear One, Units 1 and 2, from January 23 - 27, 2017. The inspection will consist of three

reactor inspectors from the NRC Region IV office plus one of the assigned resident inspectors

at Arkansas Nuclear One for one week. The inspection will be conducted in accordance with

the NRCs Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation

Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and licensee staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection

activity. Please note that the documents are requested to be provided by December 30, 2016.

During the on-site inspection, inspectors will verify that plans for complying with NRC

Orders EA-12-049 and EA-12-051 are in place and are being implemented. Inspectors will

also verify the establishment of staffing and communications plans provided in response to the

March 12, 2012, request for information letter, and multi-unit dose assessment information

provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency

Preparedness for Japan Lessons Learned, dated March 27, 2013. These plans and

information were provided in the site-specific submittals, which were subsequently reviewed by

the NRC staff for understanding and documented in the NRCs plant safety evaluations and

safety assessments. Therefore, appropriate personnel knowledgeable of the stations FLEX

strategies, spent fuel pool instrumentation, and emergency preparedness enhancements

should be available to support the inspectors at the site during the inspection.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

R. Anderson

- 2 -

If there are any questions about this inspection or the material requested, please contact the

team lead inspector, John M. Mateychick, by telephone at (817) 200-1560 or by e-mail at

john.mateychick@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Gregory E. Werner, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-313 and 50-368

License Nos: DPR-51 and NPF-6

Enclosure:

Request for Information

cc w/encl: Electronic Distribution

ML16312A067

SUNSI Review

By: JMateychick

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

SRI:EB2

C:EB2

NAME

JMateychick

GWerner

SIGNATURE

/RA/

/RA/

DATE

10/31/16

11/3/16

Letter to Rich Anderson from Gregory E. Werner, dated November 3, 2016

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF NRC

INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES

AND SPENT FUEL POOL INSTRUMENTATION ORDERS AND

EMERGENCY PREPAREDNESS COMMUNICATION/STAFFING/

MULTI-UNIT DOSE ASSESSMENT PLANS (05000313/2017008 AND

05000368/2017008) AND REQUEST FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Margaret.Tobin@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)

Project Engineer, DRP/E (Brian.Correll@nrc.gov)

Project Engineer, RIDP (Jackson.Choate@nrc.gov)

ANO Administrative Assistant (Mary.Bennett@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Thomas.Wengert@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

Inspection Team Lead, Senior Reactor Inspector, DRS/EB2 (John.Mateychick@nrc.gov)

Team Member, Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Request for Information

FLEX Strategies, Spent Fuel Pool Instrumentation, and EP Enhancements Inspection

Arkansas Nuclear One, Units 1 and 2

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (use of the Certrec IMS information portal is preferred), to the attention of

John Mateychick, by December 30, 2016. (If electronic/CD format is preferred by Arkansas

Nuclear One, three copies will need to be sent to the Region IV office and one to the

Arkansas Nuclear One resident inspectors office.) The inspectors will select specific items

from the information requested below and then request from your staff additional documents

needed during the on-site inspection week. Also, we request that you categorize the

documents in your response with the numbered list below. Please provide requested

documentation electronically if possible. If requested documents are large and only hard

copy formats are available, please inform the team lead inspector, and provide subject

documentation during the first day of the on-site inspection. If you have any questions

regarding this information request, please call the team lead inspector as soon as possible.

TI 2515/191 - Appendix A

1. Provide current revision of the FLEX Final Integrated Plan, including any revisions

since January 2016 submission to the NRC.

2. Provide the FLEX strategy basis document.

3. Provide the operating, off-normal, abnormal, and/or emergency procedures where entry

into the FLEX support guideline(s) is initiated.

4. Provide a list of key pieces of equipment that directly perform a FLEX mitigation strategy

for core cooling (reactor coolant system and steam generators), containment, and/or

spent fuel pool cooling.

5. Provide a list and copies of every FLEX support guideline or equivalent procedure which

you developed or revised to implement your mitigating strategies. Provide copies of the

FLEX support guidelines/procedures which address (as applicable):

a. Restoration of AC power to essential loads.

b. DC Load shedding.

c. Primary (reactor coolant system) loss and makeup, including water source(s).

d. Secondary/steam generator makeup, including water source(s).

e. Containment isolation and safe shutdown valve operations while AC power

is unavailable.

f.

Monitoring and makeup options to the spent fuel pool.

g. Portable lighting (e.g., flashlights or headlamps) necessary for ingress and egress

to plant areas required for deployment of FLEX strategies.

h. Communications systems required for deployment of FLEX strategies.

i.

Achieving area access during a loss of AC power, including the protected area

and internal locked areas where equipment operation is necessary.

j.

Mitigating the effects of a loss of forced ventilation/cooling.

k. Access and pathways to locations where operators will be required to perform

local manual operations.

l.

Potential equipment failure as a result of loss of heat tracing during extended loss of

alternating current power.

m. Replenishment of fuel to diesel/gas powered equipment (e.g., FLEX diesel

generators, pumps, etc.).

n. Deployment and operation of portable systems (such as portable power supplies and

portable pumps).

o. Deployment routes and staging locations for FLEX portable equipment.

p. Containment venting (and/or analysis to demonstrate that containment venting is

not required).

q. Pre-staging or deployment of FLEX equipment necessary to support

shutdown risk processes/procedures (i.e., FLEX strategies in Modes 5 and

6).

6. Applicable site-specific hazards.

a. Seismic

i.

Provide documents which show the locations and configuration of structures which

store FLEX equipment.

ii.

Provide the evaluation/evidence to support that FLEX equipment is stored

in location(s) such that each location:

1. Meets the plants design basis safe-shutdown earthquake.

2. Meets the design requirements as described in ASCE 7-10, Minimum

Design Loads for Buildings and Other Structures.

3. Is outside a structure and evaluated for seismic interactions to ensure

equipment is not damaged by non-seismically robust components or

structures.

iii.

Provide documentation that explains how large portable FLEX equipment such as

pumps and power supplies are secured to protect them during a seismic event

(i.e., safe-shutdown earthquake level).

iv.

Provide documents which show that stored equipment and structures are

protected from seismic interactions to ensure that unsecured and/or non-seismic

components do not damage the equipment.

v.

Provide the travel route(s) for FLEX equipment from storage location(s) to their

location(s) of use, and evaluation(s) which demonstrate that the potential for soil

liquefaction is not of a concern for these travel route(s).

vi.

Seismic concerns for water source(s).

1. If the FLEX water sources are seismically robust, then provide the

assessment confirming that conclusion.

2. If the FLEX water sources are not seismically robust, then provide:

a. An assessment of alternate water sources.

b. Procedure(s) which describe when and how to access those sources.

vii.

If power is required to move or deploy FLEX equipment, then describe and

identify the locations of the power supplies which provide that power, and provide

the procedures which describe implementing those power supplies.

viii.

If equipment is needed to move the FLEX equipment, provide documents that

show how that equipment is protected from the seismic event.

ix.

Provide documents which show that the FLEX equipment connection points to

permanently installed plant system are seismically qualified to the same extent

as the permanently installed equipment.

x.

Provide documents which show that staged tools used to connect FLEX

equipment are acceptable/compatible with the connections used.

b. Extreme temperatures

For each key piece of equipment described in number 4 (above) that directly

performs or implements a FLEX mitigation strategy:

1. Provide the document which describes the high and low-temperature limit within

which the equipment will function.

2. Describe how the equipment is maintained within its allowable temperature range in

its storage location.

7. Provide the station-specific FLEX strategies time validation study(ies).

8. Relative to the testing and maintenance program for FLEX equipment, for each key piece

of equipment described in number 4 (above) that directly performs or implements a FLEX

mitigation strategy:

a. Identify the equipment and provide documents that describe either the testing

performed (including electrical cables) or other means used to verify that the

equipment can perform its required function.

b. For portable equipment, provide documentation describing how maintenance and

testing the equipment is in accordance with INPO AP-913 or an acceptable

alternative.

9. Provide documents which describe the programmatic controls in place to ensure that if

equipment or applicable connections are unavailable (e.g., due to maintenance), then

compensatory measures are implemented in accordance with guidance outlined in

NEI 12-06.

10. Identify the procedure(s) provided in response to number 4 above which address:

i.

Early notification to mobilize the offsite response.

ii. Establishment of a point of delivery for the offsite equipment.

iii. Arrangements for delivery and deployment at the site.

iv. Sufficient supplies of commodities to support the equipment and site personnel.

a. Provide documents which describe your evaluation of what equipment and

commodities are needed to sustain and backup the sites coping strategies.

b. Provide documents which show that you have established means to ensure that fuel

for FLEX equipment can be delivered to the site if on-site fuel is unusable or

depleted.

c. Provide documents which describe the process by which you will revise the

required supplied equipment due to changes in the FLEX strategies or plant

equipment or equipment obsolescence.

11. Provide documents which show that your installed mechanical and electrical

connections are compatible with Phase 3 equipment.

a. Provide the station-specific National SAFER Center Playbook.

12. Relative to personnel training on FLEX strategies, provide:

a. FLEX training bases document(s).

b. Lesson plans for site emergency response leaders responsible for the implementation

of FLEX strategies. (Records for staff completing this training may be requested to be

provided to the inspectors during the on-site inspection week.)

c. Lesson plans for site personnel responsible for the execution of mitigating strategies

for beyond-design-basis external events (i.e., operators, craft personnel, security,

radiation protection, etc.) to ensure familiarity and considering available job aids,

instructions, and mitigating strategy time constraints.

13. Provide the procedure(s) which describe your configuration control program; and provide

lists that identify by number, name, and revision number the documents, drawings,

sketches, calculations, analyses, procedures/guidance and evaluations related to your

mitigation strategies.

14. Listing of corrective action program document summaries generated related to

FLEX equipment, strategies, procedures, and/or training.

TI 2515/191 - Appendix B

15. Provide the procedures for maintenance, testing, calibration, and use of the primary and

backup spent fuel pool instrumentation channels.

16. Provide documents which describe the training program that addresses the use,

maintenance, calibration, surveillance, and the use of alternate power to the primary

and backup spent fuel pool instrument channels. Specifically provide training

materials used in that program.

TI 2515/191 - Appendix C

17. Communications:

a. Provide documents which show that the communications system(s), technologies,

equipment, and power supplies would be available from the beginning of the event

and operate during an extended loss of alternating current power.

b. Provide documents which show that you have completed appropriate maintenance

and testing program activities to verify off-site response organizations communication

systems operate as designed.

c. Provide the procedures and/or guidance used to implement the

communication capabilities.

d. Provide documents which show that any new communications equipment, portable

power supplies, and/or systems have been incorporated into the testing and

preventative maintenance programs.

18. Staffing:

a. Provide documents which show that on-site and augmented staff will be available to

implement the strategies in response to a large-scale natural event that results an

extended loss of alternating current power and impedes access to the site, and that

functions/tasks have been appropriately staffed.

b. Provide documents which show that the site access methods (e.g., roadways,

navigable bodies of water and dockage, airlift, etc.) expected to be available following

the event and available to the Emergency Response Organization [as described in

your Phase 1 and 2 staffing assessments and NRC safety assessment].

c. Provide documents which show the testing, training, and drills/exercises performed

by you to demonstrate the Emergency Response Organizations ability to utilize the

communications systems and/or equipment.

19. Provide documents which show that your multi-unit dose assessment is capable of

analyzing concurrent radiological releases from all on-site significant sources

(including releases from spent fuel pools) during an extended loss of alternating

current power.

Lead Inspector Contact Information:

John Mateychick, Senior Reactor Inspector

Mailing Address:

817-200-1560

U.S. NRC, Region IV

John.Mateychick@nrc.gov

1600 East Lamar Blvd.

ATTN: John Mateychick, DRS

Arlington, TX 76011-4511