Correction to Amendment Nos. 308 and 312 Regarding Surveillance Requirements for High Pressure Coolant Injection System and Reactor Core Isolation Cooling System
ML16217A008
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/11/2016
From: Richard Ennis
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Nuclear
Ennis R, NRR/DORL/LPL1-2, 415-1420
References
CAC MF6774, CAC MF6775
Download: ML16217A008 (11)


Text

Mr. Bryan C. Hanson UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 11, 2016 President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

CORRECTION TO AMENDMENT NOS. 308 AND 312 REGARDING SURVEILLANCE REQUIREMENTS FOR HIGH PRESSURE COOLANT INJECTION SYSTEM AND REACTOR CORE ISOLATION COOLING SYSTEM (CAC NOS. MF6774 AND MF6775)

Dear Mr. Hanson:

By letter dated July 5, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16159A148), the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 308 and 312 to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendments: (1) revised the allowable test pressure band in the technical specification (TS}

surveillance requirements (SRs) for the pump flow testing of the high pressure coolant injection system and the reactor core isolation system; (2) revised the surveillance frequency requirements for verifying the sodium pentaborate enrichment of the standby liquid control system; and (3) deleted SRs associated with verifying the manual transfer capability of the normal and alternate power supplies for certain motor-operated valves associated with the suppression pool spray and drywell spray sub-systems of the residual heat removal system.

In preparation for implementation of the above referenced amendments, the Exelon Generation Company, LLC (Exelon) staff informed the NRC staff that several of the TS pages revised by Amendment Nos. 308 and 312, did not reflect changes made in PBAPS, Units 2 and 3, Amendment Nos. 297 and 300, issued by the NRC staff on June 30, 2015 (ADAMS Accession No. ML15154A614). The error resulted, in part, due to the wrong camera ready pages being provided by Exelon in support of the issuance of Amendment Nos. 308 and 312. The corrected pages are enclosed.

If you have any questions, I can be reached at (301) 415-1420 or by e-mail at Rick.Ennis@nrc.gov.

Docket Nos. 50-277 and 50-278

Enclosures:

1. Corrected TS pages for Amendment No. 308 to Renewed DPR-44

2. Corrected TS pages for Amendment No. 312 to Renewed DPR-56 cc w/enclosures: Distribution via Listserv Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

CORRECTIONS TO LICENSE AMENDMENT NO. 308 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.

Remove 3.5-13 3.6-30 3.6-30b Insert 3.5-13 3.6-30 3.6-30b

SURVEILLANCE REQUIREMENTS SR 3.5.3.l SR 3.5.3.2 SR 3.5.3.3 SR 3.5.3.4 PBAPS UNIT 2 SURVEILLANCE Verify the RCIC System locations susceptible to gas accumulation are sufficiently filled with water.

- - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

Not required to be met for system vent flow paths opened under administrative control.

Verify each RCIC System manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

- - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure~ 1053 psig and~ 915 psig, the RCIC pump can develop a flow rate~ 600 gpm against a system head corresponding to reactor pressure.

- - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure~ 175 psig, the RCIC pump can develop a flow rate

~ 600 gpm against a system head corresponding to reactor pressure.

3.5-13 RCIC System 3.5.3 FREQUENCY In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Surveillance Frequency Control Program.

In accordance with the Surveillance Frequency Control Program.

In accordance with the Surveillance Frequency Control Program.

(continued)

Amendment No. 308

RHR Suppression Pool Spray 3.6.2.4 SURVEILLANCE REQUIREMENTS SR 3.6.2.4.l SR 3.6.2.4.2 SR 3.6.2.4.3 SR 3.6.2.4.4 PBAPS UN IT 2 SURVEILLANCE Verify each RHR suppression pool spray subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.

Verify each suppression pool spray nozzle is unobstructed.

Deleted

- - - - - - - - - - - -- -- - - -NOTE - - - - - - - - - - - - - - - - - - -

HPSW system related components are excluded.

Verify RHR suppression pool spray subsystem locations susceptible to gas accumulation are sufficiently filled with water.

3.6-30 FREQUENCY In accordance with the Surveillance Frequency Control Program.

In accordance with the Surveillance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

Amendment No. 308

SURVEILLANCE REQUIREMENTS SR 3.6.2.5.l SR 3.6.2.5.2 SR 3.6.2.5.3 SR 3.6.2.5.4 PBAPS UN IT 2 SURVEILLANCE Verify each RHR drywell spray subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.

Verify each drywell spray nozzle is unobstructed.

Deleted

- - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - -

HPSW system related components are excluded.

Verify RHR drywell spray subsystem locations susceptible to gas accumulation are sufficiently filled with water.

3.6-30b RHR Drywel l Spray 3.6.2.5 FREQUENCY In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Surveillance Frequency Control Program.

Amendment No. 308

CORRECTIONS TO LICENSE AMENDMENT NO. 312 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 RENEWED FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.

Remove 3.5-13 3.6-30 3.6-30b Insert 3.5-13 3.6-30 3.6-30b

SURVEILLANCE REQUIREMENTS SR 3.5.3.1 SR 3.5.3.2 SR 3.5.3.3 SR 3.5.3.4 PBAPS UN IT 3 SURVEILLANCE Verify the RCIC System locations susceptible to gas accumulation are sufficiently filled with water.

- - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

Not required to be met for system vent flow paths opened under administrative control.

Verify each RCIC System manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

- - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure~ 1053 psig and~ 915 psig, the RCIC pump can develop a flow rate~ 600 gpm against a system head corresponding to reactor pressure.

- - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure~ 175 psig, the RCIC pump can develop a flow rate

~ 600 gpm against a system head corresponding to reactor pressure.

3.5-13 RCIC System 3.5.3 FREQUENCY In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

(continued)

Amendment No. 312

RHR Suppression Pool Spray 3.6.2.4 SURVEILLANCE REQUIREMENTS SR 3.6.2.4.1 SR 3.6.2.4.2 SR 3.6.2.4.3 SR 3.6.2.4.4 PBAPS UN IT 3 SURVEILLANCE Verify each RHR suppression pool spray subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.

Verify each suppression pool spray nozzle i s unobstructed.

Deleted

- - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - -

HPSW system related components are excluded.

Verify RHR suppression pool spray subsystem locations susceptible to gas accumulation are sufficiently filled with water.

3.6-30 FREQUENCY In accordance with the Surveillance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

Amendment No. 312

SURVEILLANCE REQUIREMENTS SR 3.6.2.5.1 SR 3.6.2.5.2 SR 3.6.2.5.3 SR 3.6.2.5.4 PBAPS UN IT 3 SURVEILLANCE Verify each RHR drywell spray subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.

Verify each drywell spray nozzle is unobstructed.

Deleted

- - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - -

HPSW system related components are excluded.

Verify RHR drywell spray subsystem locations susceptible to gas accumulation are sufficiently filled with water.

3.6-30b RHR Drywel l Spray 3.6.2.5 FREQUENCY In accordance with the Surveillance Frequency Control Program.

In accordance with the Survei 11 a nee Frequency Control Program.

In accordance with the Survei 11 ance Frequency Control Program.

Amendment No. 312

ML16217A008 OFFICE DORL/LPL 1-2/PM DORL/LPL 1-2/LA DORL/LPL 1-2/BC NAME REnnis LRonewicz DBroaddus DATE 8/10/2016 8/09/2016 8/10/2016