8 to Updated Safety Analysis Report, Section 2.5.5, Figure 2.5.5-1 Through Figure 2.5.5-2
ML16207A655
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/2016
From:
South Texas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16207A547 List: ... further results
References
NOC-AE-16003371
Download: ML16207A655 (5)


Text

UFSAR Section 2.5.5

+

e e

e e SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING AND POND SLOPE STABLITY ANALYSES STATIC CONDITIONS Figure 2.5.5-1 Revision 0

e e e

Cl SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING POND SLOPE STABILITY ANALYSES EARTHQUAKE CONDITION A= 0.1G Fi ure 2.5.5-1 A Revision 0

r.IORMAL OPERATING

\\7 LEVEL+ 2&

iii

!IIAXIMUM LEVEL -....!:-------

EL +34 I

NORMAL OPERATING LEVEL EL + 21 CENTRAL DIKE SOUTH£ All EMIANIUIIENT EXCAVATED I'ONOSlOPE I:

~EG~~~~ITU A.1 LAYER IN*SITU A.2 LAYER IN-SITU 8 LAYER COMPACTED A2 MATERIAL 7

SAND BACKfill SOIL CEMENT CONCRETE 0

\\

~

SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING POND SLOPE STABILITY ANALYSES RAPID DRAWDOWN CONDITJONS Fi ure 2.5.5-1 B Revision 0

DISCMAIIGE STRUC TUR(

161

  • UNIT NO l LEGEND DESIGN PHASE EXPLORATION PROGRAM Z25C!U I Piezo'lllater installation location and depth Boring with tube and split-spoon sampling 0 Teat pit o Shallow bulk samples zoe
  • IDdieatea location where additional borings were made to obtain supplementary standard penetration test data and/or stationary piaton samples.

VERIFICATION PROGRAM A. Boring with tube sampling 223

~

I

~~

200 400 SCAL£ -FEET

~' i 600 SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING POND SUBSURFACE EXPLORATIONS Fi ure 2.5.5-2 Revision 0