ML16207A655
| ML16207A655 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/28/2016 |
| From: | South Texas |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16207A547 | List:
|
| References | |
| NOC-AE-16003371 | |
| Download: ML16207A655 (5) | |
Text
UFSAR Section 2.5.5
+
e e
e e SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING AND POND SLOPE STABLITY ANALYSES STATIC CONDITIONS Figure 2.5.5-1 Revision 0
e e e
Cl SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING POND SLOPE STABILITY ANALYSES EARTHQUAKE CONDITION A= 0.1G Fi ure 2.5.5-1 A Revision 0
r.IORMAL OPERATING
\\7 LEVEL+ 2&
iii
!IIAXIMUM LEVEL -....!:-------
EL +34 I
NORMAL OPERATING LEVEL EL + 21 CENTRAL DIKE SOUTH£ All EMIANIUIIENT EXCAVATED I'ONOSlOPE I:
~EG~~~~ITU A.1 LAYER IN*SITU A.2 LAYER IN-SITU 8 LAYER COMPACTED A2 MATERIAL 7
SAND BACKfill SOIL CEMENT CONCRETE 0
\\
~
SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING POND SLOPE STABILITY ANALYSES RAPID DRAWDOWN CONDITJONS Fi ure 2.5.5-1 B Revision 0
DISCMAIIGE STRUC TUR(
161
- UNIT NO l LEGEND DESIGN PHASE EXPLORATION PROGRAM Z25C!U I Piezo'lllater installation location and depth Boring with tube and split-spoon sampling 0 Teat pit o Shallow bulk samples zoe
- IDdieatea location where additional borings were made to obtain supplementary standard penetration test data and/or stationary piaton samples.
VERIFICATION PROGRAM A. Boring with tube sampling 223
~
I
~~
200 400 SCAL£ -FEET
~' i 600 SOUTH TEXAS PROJECT UNITS 1 & 2 ESSENTIAL COOLING POND SUBSURFACE EXPLORATIONS Fi ure 2.5.5-2 Revision 0