Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Degraded Cornerstone Column (since 4th Quarter 2013)

Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o

Did not meet Inspection Procedure 95002 Objectives o

Remained in the Degraded Cornerstone column for more than five quarters Pilgrim Performance Problems

White Finding in September 2015 for not identifying and correcting a safety relief valve failure White Finding combined with performance within the Degraded Cornerstone for more than five quarters Led to Pilgrim performance transition to Column 4 Pilgrim Performance Problems

NRC Oversight Actions Are Comprehensive Ensure adequate safety margins maintained Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

9/01: MC letter/final White 11/12: 3Q report issued 12/01:

security report issued 12/21: FP triennial report issued 2/11: 4Q15 report issued 2/29: Phase A issued 3/4: annual assessment letters issued 4/4-4/8:

Phase B inspection 4/13: annual assessment meeting 5/2-5/20:

Mods Team April 4-8, 2016 Phase B

Six-month review of the corrective action program to determine improvement progress TBD Phase C

IP 95003 items not already covered in Phases A and B

Safety culture assessment January 11-15, 2016 Phase A COMPLETE Report Issue 2/29

Snapshot of corrective action program performance TBD IP 92723

Four SL IV violations (impeding regulatory process) 4Q2015 C

PI&R Samples COMPLETE Report Issue 12/11

Three operations-focused (complete)

Adverse weather preps (resident inspectors)

PI&R Sample 1Q2016

Security baseline follow-up May 2-20, 2016 Mods Team

Baseline triennial modification team inspection April 2016 Public Meeting

95003 update

Annual assessment meeting Key Inspections & Milestones

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html Public Electronic Reading Room

- www.nrc.gov/reading-rm.html Public Document Room

- 800-397-4209

Review of 2015 Performance at Pilgrim Nuclear Power Station Annual Assessment Meeting April 13, 2016 ML16111A889

Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A

Robust NRC Oversight

  • Licensee performance, characterized by a weak corrective action program, placed plant in Column 4 of the Action Matrix
  • Ongoing NRC oversight to ensure safety margins maintained
  • Current regulatory actions are adequate

Degraded Cornerstone Column (since 4th Quarter 2013)

Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications Two White Parallel Findings:

o Inadequate corrective actions for the two White PIs o

Did not meet Inspection Procedure 95002 Objectives o

Remained in the Degraded Cornerstone column for more than five quarters Pilgrim Performance Problems

White Finding in September 2015 for not identifying and correcting a safety relief valve failure White Finding combined with performance within the Degraded Cornerstone for more than five quarters Led to Pilgrim performance transition to Column 4 Pilgrim Performance Problems

NRC Oversight Actions Are Comprehensive Ensure adequate safety margins maintained Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:

o significant issues in corrective action program (CAP) appropriately addressed o interim licensee actions arresting CAP performance declines Increased Problem Identification and Resolution samples on previously identified performance issues

NRC Oversight Actions Are Comprehensive

  • Additional Resident Inspector was assigned to site
  • Quarterly Assessments - increased management oversight
  • Current regulatory actions are adequate

9/01: MC letter/final White 11/12: 3Q report issued 12/01:

security report issued 12/21: FP triennial report issued 2/11: 4Q15 report issued 2/29: Phase A issued 3/4: annual assessment letters issued 4/4-4/8:

Phase B inspection 4/13: annual assessment meeting 5/2-5/20:

Mods Team April 4-8, 2016 Phase B

Six-month review of the corrective action program to determine improvement progress TBD Phase C

IP 95003 items not already covered in Phases A and B

Safety culture assessment January 11-15, 2016 Phase A COMPLETE Report Issue 2/29

Snapshot of corrective action program performance TBD IP 92723

Four SL IV violations (impeding regulatory process) 4Q2015 C

PI&R Samples COMPLETE Report Issue 12/11

Three operations-focused (complete)

Adverse weather preps (resident inspectors)

PI&R Sample 1Q2016

Security baseline follow-up May 2-20, 2016 Mods Team

Baseline triennial modification team inspection April 2016 Public Meeting

95003 update

Annual assessment meeting Key Inspections & Milestones

Future Action to Monitor Pilgrim

  • Supplemental IP 95003 Phase C o Most significant Phase of 95003 o Primary Focus - CAP and Safety Culture o Conducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)
  • CAL Follow-up inspection

Licensee Response and Remarks Mr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks

Contacting the NRC

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

Reference Sources

  • Reactor Oversight Process

- www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Pilgrim Special Oversight Website:

- www.nrc.gov/info-finder/reactors/pilg/special-oversight.html Public Electronic Reading Room

- www.nrc.gov/reading-rm.html Public Document Room

- 800-397-4209