ML15183A360

From kanterella
Jump to navigation Jump to search
Notification of Inspection (NRC Inspection Report 05000298/2015003 and Request for Information
ML15183A360
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/02/2015
From: Vincent Gaddy
Division of Reactor Safety IV
To: Limpias O
Nebraska Public Power District (NPPD)
J. Kirkland
References
IR 2015003
Download: ML15183A360 (9)


See also: IR 05000298/2015003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

July 2, 2015

Mr. Oscar A. Limpias

Vice President-Nuclear and CNO

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000298/2015003 AND REQUEST

FOR INFORMATION

Dear Mr. Limpias:

From August 10 - 14, 2015, inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will perform the baseline biennial requalification inspection at Cooper Nuclear

Station, using NRC Inspection Procedure 71111.11B, Licensed Operator Requalification

Program. Experience has shown that this inspection is a resource intensive inspection both for

the NRC inspectors and your staff. In order to minimize the impact to your on-site resources

and to ensure a productive inspection, we have enclosed a request for documents needed for

this inspection. These documents have been divided into three groups. The first group

(Section A of the enclosure) identifies information to be provided prior to the inspection to

ensure that the inspectors are adequately prepared. The second group (Section B of the

enclosure) identifies the information the inspectors will need upon arrival at the site. The third

group (Section C of this enclosure) identifies the items which are necessary to close out the

inspection and are usually sent a few weeks after the team has left the site. It is important that

all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the on-site portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Jodie Olberding of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact the lead inspector John Kirkland at (817) 200-1771

(John.Kirkland@nrc.gov) or Steve Garchow at (817) 200-1426 (Steve.Garchow@nrc.gov).

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required

O. Limpias

- 2 -

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-298

License: DPR-46

Enclosure:

Biennial Requalification Inspection

Document Request

cc: Electronic Distribution for

Cooper Nuclear Station

ML15183A360

SUNSI Review

By: VGG

ADAMS

Yes

No

Publicly Available

Non-Publicly

Available

Non-Sensitive

Sensitive

Keyword:

RGN-002

OFFICE

SOE:OB

C:OB

NAME

JKirkland

VGaddy

SIGNATURE

/RA/

/RA/

DATE

7/2/15

7/2/15

Letter to Oscar A. Limpias from Vincent G. Gaddy, dated July 2, 2015

SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000298/2015003 AND REQUEST

FOR INFORMATION

Distribution:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Acting Senior Resident Inspector (James.Nance@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer (Paul.Nizov@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

- 1 -

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

TO:

Jodie Olberding

Licensing Specialist, Cooper Nuclear Station

FROM:

John Kirkland

Senior Operations Engineer, NRC RIV

817-200-1771

SUBJECT: Information Request to Support August 10 - 14, 2015, Licensed Operator

Requalification Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than July 20, 2015

Electronically to: John.Kirkland@nrc.gov (lead inspector)

cc: Steve.Garchow@nrc.gov, Brian.Larson@nrc.gov (inspectors)

Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd.

Arlington, TX 76011

ATTN: John Kirkland

General Requests:

List of licensed operators (senior reactor operators (SRO) and reactor operators

(RO)) by crew (operating and staff).

Training and Operations Department organization charts (with qualified licensed

operator requalification (LOR) evaluators identified).

Procedures that identify process for revising and maintaining LO continuing training

program up to date.

List of outstanding LOR program changes.

List of plant events and industry operating experience incorporated into LOR

program since last BRQ (biennial requalification).

Audits and/or self-assessment reports addressing the licensed operator

requalification training program.

Last two years of simulator review committee (or equivalent) meeting minutes

Last two years of CRC (or equivalent) meeting minutes.

02.03: Biennial Requalification Written Examination Quality

The current and approved biennial written examination schedule.

The current requalification cycle written examination results for both SRO and RO

that have already been administered up to the week prior to the inspection team

arrival on-site.

- 2 -

All written examinations that have been approved for administration up to and

including the week before the inspection team is on-site. This will need to have

adequate password protection if e-mailed or double envelope protection if mailed via

regular mail per NUREG-1021.

The current requalification cycle examination methodology (sample plan).

02.04: Annual Requalification Operating Test Quality

The schedule for the operating tests (JPMs & scenarios) to be given the week of

August 10, 2015.

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of August 10, 2015.

Current requalification cycle operating tests (SRO and RO) and results up to the

week prior to the inspection team arrival on-site.

All of the previous years NRC required annual operating tests.

Current requalification cycle operating test methodology (sample plan).

All portions of the updated safety analysis report that identify operator response

times for time critical operator actions.

02.05: Licensee Admin of Requalification Examinations

All procedures used to administer the annual operating test.

All procedures used to assess operator performance.

All procedures that describe conduct of simulator training.

All procedures used to test, operate, and maintain the simulator.

02.06: Requalification Examination Security

Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, technical support calls,

etc.) on a periodic basis.

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current examination cycle tests and prior year examinations.

List of all condition reports since the last biennial requalification inspection related to

examination security and overlap.

02.07: Licensee Remedial Training Program

List of remedial training conducted or planned since last requalification examinations

(includes training provided to operators to enable passing requalification

examinations and training provided to correct generic or individual weaknesses

observed during previous requalification examination cycle).

Remediation plans (lesson plans, reference materials, and attendance

documentation).

- 3 -

02.08: Conformance with Operator License Conditions

All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators.

All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection.

02.09: Simulator Performance

For the following cases, send the most recent transient test packages, which may be

electronic or in paper single test packages and shall be complete with test

procedures for each test, the acceptance criteria, and results. For each transient test,

the reference chart should be included or an equivalent subject matter expert review

versus the simulator results with a write-up for any differences beyond the American

National Standards Institute (ANSI) 3.5 standard requirements. The team lead

should pick a few samples from the list in the ANSI 3.5 standard as deemed

appropriate for the inspection. A few examples are listed below:

o Transient test 1, Manual Rx trip

o Transient test 3, simultaneous closure of all main steam isolation valves

o Transient test 5, single recirculation pump trip

o Steady State tests for low and 100% power test)

All simulator management and configuration procedures if not already provided for

Section 02.05 above.

Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between July 1, 2013, and July 1, 2015.

Malfunction Tests for loss of normal feedwater or normal feedwater system failure

(item 9), control rod failure, including stuck rods, uncoupled rods, drifting rods, rod

drops, and misaligned rods (item 12), and reactor pressure control system failure,

including turbine bypass failure for boiling water reactors (item 25). If these are

included in an SBT package then the review of that package would be acceptable.

Two examples of primary parameters tested in order to verify core physics

parameters (such as MTC, IRW). The applicable reference graphs from the Plant

physics data book (electronic or other means as available) should also be included

as well as the test procedures used and the acceptance criteria with results for the

selected samples.

All simulator modification packages that are on hold, delayed, or just not completed

in the last two years.

A list of simulator modification packages completed in the last two year window.

02.10: Problem Identification and Resolution

A summary report of all condition reports related to operator actions/errors in the

control room.

Any revised requalification training that was based on licensed operator performance

issues.

- 4 -

B. The following information is requested in order to support the on-site inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on August 10, 2015

02.02: Examination Results / 02.03 and 02.04: Written Examination and Op Test Quality

All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after on-

site week.

All results up to the day the team leaves the site.

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews).

Access to licensed operators training attendance records.

Access to licensed operators medical records.

02.09: Simulator Performance

Simulator discrepancies (DRs) from July 1, 2013, through June 30, 2015. This

should include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

All current model deficiencies, including final safety analysis report vs design

differences in the simulator (any documentation on this).

Summary list of modifications from July 1, 2013, through June 30, 2015.

Plant modifications (both hardware and software) completed on the simulator by due

date from July 1, 2013, through June 30, 2015.

Simulator Differences Lesson Plan used in training (current to August 2015).

The complete book of all simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

All simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for simulator testing.

02.10: Problem Identification and Resolution

All condition reports related to operator actions/errors in the control room.

- 5 -

C. The licensee is required to send the final results summary and any remaining

examinations and operating tests that have not been reviewed to the regional office

lead inspector for this inspection for final review and comparison against the

Significance Determination Tools in order to communicate the exit results for the

inspection.