2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
ML15061A401
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From: Arthur Burritt
Reactor Projects Branch 2
To: Coyle L
Entergy Nuclear Operations
Burritt A
References
FOIA/PA-2016-0148 IR 2014001
Download: ML15061A401 (5)


See also: IR 05000247/2014001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100

KING OF PRUSSIA, PA 19406-2713

March 4, 2015

Mr. Larry Coyle

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR

GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND

05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The

NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection

results and enforcement actions from January 1, 2014 through December 31, 2014. This letter

informs you of the NRCs assessment of your facility during this period and its plans for future

inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Indian Point Units 2 and 3 during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will

perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage

Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and

Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides

the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as soon as possible to discuss changes to the

inspection plan should circumstances warrant any changes. This inspection plan does not

include security-related inspections, which will be sent via separate, non-publicly available

correspondence.

L. Coyle

2

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules

of Practice, a copy of this letter will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Records component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos.

50-247 and 50-286

License Nos. DPR-26 and DPR-64

Enclosure:

Indian Point 2 & 3 Inspection/Activity Plan

cc w/encl:

Distribution via ListServ

ML15061A401

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DRP

RI/DRP

NAME

TSetzer/TCS

ABurritt/ALB

DATE

02/23/15

03/02/15

Page 1 of 2

03/02/2015

15:16:39

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Indian Point

Inspection / Activity Plan

01/01/2015 - 06/30/2016

5/11EXAM

- U3 INITIAL OL EXAM

5

3

FY15-IP3 INITIAL OPERATOR LICENSING EXAM

U01908

04/13/2015

04/17/2015

3

FY15-IP3 INITIAL OPERATOR LICENSING EXAM

U01908

05/11/2015

05/15/2015

71124

- RETS

1

2, 3

IP

Radiation Monitoring Instrumentation

71124.05

02/09/2015

02/13/2015

2, 3

IP

Radioactive Gaseous and Liquid Effluent Treatment

71124.06

02/09/2015

02/13/2015

71124

- HP

1

3

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

03/02/2015

03/06/2015

3

IP

Occupational ALARA Planning and Controls

71124.02

03/02/2015

03/06/2015

7111108P

- U3 INSERVICE INSPECTION

1

3

IP

Inservice Inspection Activities - PWR

7111108P

03/09/2015

03/20/2015

71152

- GROUNDWATER MONITORING

5

2

IP

Problem Identification and Resolution

71152

05/04/2015

05/07/2015

71124

- HP

1

2, 3

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

05/07/2015

05/13/2015

2, 3

IP

Occupational ALARA Planning and Controls

71124.02

05/07/2015

05/13/2015

7111107T

- TRIENNIAL HEAT SINK

1

2, 3

IP

Heat Sink Performance

7111107T

07/06/2015

07/10/2015

CDBI

- COMPONENT DESIGN BASIS INSPECTION

8

2, 3

IP

Component Design Bases Inspection

7111121

07/20/2015

07/24/2015

2, 3

IP

Component Design Bases Inspection

7111121

08/03/2015

08/07/2015

2, 3

IP

Component Design Bases Inspection

7111121

08/17/2015

08/21/2015

7111111B

- IP3 REQUAL INSP W/ P/F RESULTS

2

3

IP

Licensed Operator Requalification Program

7111111B

09/21/2015

09/25/2015

71124

- HP

1

2, 3

IP

Occupational Dose Assessment

71124.04

08/10/2015

08/14/2015

2, 3

IP

Radiation Monitoring Instrumentation

71124.05

08/10/2015

08/14/2015

2, 3

IP

Performance Indicator Verification

71151

08/10/2015

08/14/2015

EP

- EP PROGRAM INSPECTION

1

2, 3

IP

Alert and Notification System Testing

7111402

08/17/2015

08/21/2015

2, 3

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

08/17/2015

08/21/2015

2, 3

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

08/17/2015

08/21/2015

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2

03/02/2015

15:16:39

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Indian Point

Inspection / Activity Plan

01/01/2015 - 06/30/2016

ISFSI

- ISFSI LOADING INSPECTION

2

2, 3

IP

Operation Of An ISFSI

60855

08/17/2015

08/21/2015

2

IP

Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1

08/17/2015

08/21/2015

2516-001

- TI 2516-001 U3 LR COMMITMENTS INSPECTION

1

3

IP

Review of License Renewal Activities

2516/001

11/16/2015

11/20/2015

71124.08

- RADWASTE

1

2, 3

IP

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124.08

11/16/2015

11/20/2015

71152B

- PI&R - BIENNIAL

4

2, 3

IP

Problem Identification and Resolution

71152B

11/30/2015

12/04/2015

2, 3

IP

Problem Identification and Resolution

71152B

12/14/2015

12/18/2015

71124

- HP

1

2

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

03/07/2016

03/11/2016

2

IP

Occupational ALARA Planning and Controls

71124.02

03/07/2016

03/11/2016

ISI

- U2 INSERVICE INSPECTION

1

2

IP

Inservice Inspection Activities - PWR

7111108P

03/14/2016

03/25/2016

EP

- EP EXERCISE EVALUATION

4

2, 3

IP

Exercise Evaluation

7111401

06/27/2016

07/01/2016

TRI FI

- TRIENNIAL FIRE PROTECTION

4

2, 3

IP

Fire Protection [Triennial]

7111105T

05/23/2016

05/27/2016

2, 3

IP

Fire Protection [Triennial]

7111105T

06/06/2016

06/10/2016

71124.07

- REMP

1

2, 3

IP

Radiological Environmental Monitoring Program

71124.07

06/20/2016

06/24/2016

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.