Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD., SUITE 100
KING OF PRUSSIA, PA 19406-2713
March 4, 2015
Mr. Larry Coyle
Site Vice President
Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR
GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND
Dear Mr. Coyle:
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter
informs you of the NRCs assessment of your facility during this period and its plans for future
inspections at your facility.
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that
preserved public health and safety and met all cornerstone objectives. The NRC determined
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., Green) safety significance, and all PIs
indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will
perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage
Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and
Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides
the inspection plan to allow for the resolution of any scheduling conflicts and personnel
availability issues. The NRC will contact you as soon as possible to discuss changes to the
inspection plan should circumstances warrant any changes. This inspection plan does not
include security-related inspections, which will be sent via separate, non-publicly available
correspondence.
L. Coyle
2
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules
of Practice, a copy of this letter will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Please contact me at (610)337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos.
50-247 and 50-286
License Nos. DPR-26 and DPR-64
Enclosure:
Indian Point 2 & 3 Inspection/Activity Plan
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
OFFICE
RI/DRP
RI/DRP
NAME
TSetzer/TCS
ABurritt/ALB
DATE
02/23/15
03/02/15
Page 1 of 2
03/02/2015
15:16:39
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Indian Point
Inspection / Activity Plan
01/01/2015 - 06/30/2016
5/11EXAM
- U3 INITIAL OL EXAM
5
3
FY15-IP3 INITIAL OPERATOR LICENSING EXAM
U01908
04/13/2015
04/17/2015
3
FY15-IP3 INITIAL OPERATOR LICENSING EXAM
U01908
05/11/2015
05/15/2015
71124
- RETS
1
2, 3
IP
Radiation Monitoring Instrumentation
02/09/2015
02/13/2015
2, 3
IP
Radioactive Gaseous and Liquid Effluent Treatment
02/09/2015
02/13/2015
71124
- HP
1
3
IP
Radiological Hazard Assessment and Exposure Controls
03/02/2015
03/06/2015
3
IP
Occupational ALARA Planning and Controls
03/02/2015
03/06/2015
7111108P
- U3 INSERVICE INSPECTION
1
3
IP
Inservice Inspection Activities - PWR
7111108P
03/09/2015
03/20/2015
- GROUNDWATER MONITORING
5
2
IP
Problem Identification and Resolution
05/04/2015
05/07/2015
71124
- HP
1
2, 3
IP
Radiological Hazard Assessment and Exposure Controls
05/07/2015
05/13/2015
2, 3
IP
Occupational ALARA Planning and Controls
05/07/2015
05/13/2015
7111107T
- TRIENNIAL HEAT SINK
1
2, 3
IP
Heat Sink Performance
7111107T
07/06/2015
07/10/2015
- COMPONENT DESIGN BASIS INSPECTION
8
2, 3
IP
Component Design Bases Inspection
7111121
07/20/2015
07/24/2015
2, 3
IP
Component Design Bases Inspection
7111121
08/03/2015
08/07/2015
2, 3
IP
Component Design Bases Inspection
7111121
08/17/2015
08/21/2015
7111111B
- IP3 REQUAL INSP W/ P/F RESULTS
2
3
IP
Licensed Operator Requalification Program
7111111B
09/21/2015
09/25/2015
71124
- HP
1
2, 3
IP
Occupational Dose Assessment
08/10/2015
08/14/2015
2, 3
IP
Radiation Monitoring Instrumentation
08/10/2015
08/14/2015
2, 3
IP
Performance Indicator Verification
71151
08/10/2015
08/14/2015
- EP PROGRAM INSPECTION
1
2, 3
IP
Alert and Notification System Testing
7111402
08/17/2015
08/21/2015
2, 3
IP
Emergency Preparedness Organization Staffing and Augmentation System
7111403
08/17/2015
08/21/2015
2, 3
IP
Correction of Emergency Preparedness Weaknesses and Deficiencies
7111405
08/17/2015
08/21/2015
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2
03/02/2015
15:16:39
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Indian Point
Inspection / Activity Plan
01/01/2015 - 06/30/2016
- ISFSI LOADING INSPECTION
2
2, 3
IP
Operation Of An ISFSI
60855
08/17/2015
08/21/2015
2
IP
Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1
08/17/2015
08/21/2015
2516-001
- TI 2516-001 U3 LR COMMITMENTS INSPECTION
1
3
IP
Review of License Renewal Activities
2516/001
11/16/2015
11/20/2015
- RADWASTE
1
2, 3
IP
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
11/16/2015
11/20/2015
- PI&R - BIENNIAL
4
2, 3
IP
Problem Identification and Resolution
11/30/2015
12/04/2015
2, 3
IP
Problem Identification and Resolution
12/14/2015
12/18/2015
71124
- HP
1
2
IP
Radiological Hazard Assessment and Exposure Controls
03/07/2016
03/11/2016
2
IP
Occupational ALARA Planning and Controls
03/07/2016
03/11/2016
- U2 INSERVICE INSPECTION
1
2
IP
Inservice Inspection Activities - PWR
7111108P
03/14/2016
03/25/2016
- EP EXERCISE EVALUATION
4
2, 3
IP
Exercise Evaluation
7111401
06/27/2016
07/01/2016
TRI FI
- TRIENNIAL FIRE PROTECTION
4
2, 3
IP
Fire Protection [Triennial]
7111105T
05/23/2016
05/27/2016
2, 3
IP
Fire Protection [Triennial]
7111105T
06/06/2016
06/10/2016
- REMP
1
2, 3
IP
Radiological Environmental Monitoring Program
06/20/2016
06/24/2016
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.