Other: BSEP 13-0097, Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, Aug, BSEP 14-0100, Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805, ML13277A041, ML14079A234, ML14079A235, ML14079A236, ML14079A237, ML14079A238
|
MONTHYEARML12152A1452012-05-31031 May 2012 20120531 Bnp NRC Pre-LAR Application Meeting Final Project stage: Meeting BSEP 12-0106, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2012-09-25025 September 2012 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request BSEP 12-0126, Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Request BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2012-11-27027 November 2012 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident Project stage: Request ML13004A3382013-01-0808 January 2013 Acceptance for Review of License Amendment Request for NFPA Standard 805 (TAC Nos. ME9623 and Me9624) Project stage: Acceptance Review ML13123A2312013-05-15015 May 2013 Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML13141A6222013-05-23023 May 2013 RAI Re. Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051) Project stage: RAI BSEP 13-0066, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-06-28028 June 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 13-0070, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-07-15015 July 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML14079A2382013-07-16016 July 2013 Fourth Quarter 2012 Fire Protection Program Health Report, Enclosure 6 Project stage: Other ML14079A2372013-07-16016 July 2013 Fourth Quarter 2011 Fire Protection Program Health Report, Enclosure 5 Project stage: Other BSEP 13-0083, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-07-31031 July 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report2013-07-31031 July 2013 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report Project stage: Request BSEP 13-0097, Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, Aug2013-08-28028 August 2013 Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, August Project stage: Other ML13246A2762013-08-29029 August 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 Project stage: Response to RAI ML13277A0412013-09-19019 September 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Other BSEP 13-0107, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624)2013-09-30030 September 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Response to RAI ML14079A2352014-01-0909 January 2014 FIR-NGGC-0009, NFPA 805 Transient Combustibles and Ignition Source Controls Program, Enclosure 3 Project stage: Other ML13365A3202014-01-14014 January 2014 Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML14079A2362014-01-24024 January 2014 Fourth Quarter 2013 Fire Protection Program Health Report, Enclosure 4 Project stage: Other ML14028A1782014-02-12012 February 2014 Second Set of Probabilistic Risk Assessment Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0023, Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-02-28028 February 2014 Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Request BSEP 14-0029, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-03-14014 March 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 14-0035, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-04-10010 April 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML14079A2342014-04-30030 April 2014 BNP-PSA-086, Bnp Fire PRA - Fire Scenario Data, Enclosure 2, Attachment 25 Project stage: Other 05000324/LER-2014-004, Regarding Fire Related Unanalyzed Condition That Could Impact Equipment Credited in Safe Shutdown Analysis2014-05-16016 May 2014 Regarding Fire Related Unanalyzed Condition That Could Impact Equipment Credited in Safe Shutdown Analysis Project stage: Request ML14155A2092014-06-0404 June 2014 E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0076, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-06-26026 June 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Response to RAI ML14205A5922014-07-24024 July 2014 Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML14220A2132014-08-0808 August 2014 E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0092, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624)2014-08-15015 August 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624) Project stage: Response to RAI BSEP 14-0100, Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-08-29029 August 2014 Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Other ML14297A2662014-10-24024 October 2014 Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14 Project stage: Approval BSEP 14-0122, Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 8052014-11-20020 November 2014 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Request BSEP 14-0134, Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-12-18018 December 2014 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Request ML14310A8082015-01-28028 January 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(C) Project stage: Approval 2014-01-09
[Table View] |
Text
DUKE George T. Hamrick Vice President
- ENERGY, Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 o: 910.457.3698 August 29, 2014 Serial: BSEP 14-0100 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)
References:
- 1. Letter from Michael J. Annacone (Carolina Power & Light Company) to U.S.
Nuclear Regulatory Commission (Serial: BSEP 12-0106), License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition), dated September 25, 2012, ADAMS Accession Number ML12285A428
- 2. Letter from Michael J. Annacone (Carolina Power & Light Company) to U.S.
Nuclear Regulatory Commission (Serial: BSEP 12-0140), Additional Information Supporting License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition), dated December 17, 2012, ADAMS Accession Number ML12362A284
- 3. Letter from Christopher Gratton (USNRC) to Michael J. Annacone (Carolina Power & Light Company), Brunswick Steam Electric Plant, Units I and 2 - Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624), dated May 15, 2013, ADAMS Accession Number ML13123A231
- 4. Letter from George T. Hamrick (Duke Energy Progress, Inc.) to U.S. Nuclear Regulatory Commission (Serial: BSEP 13-0107), Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624), dated September 30, 2013, ADAMS Accession Number ML13277A040
U.S. Nuclear Regulatory Commission Page 2 of 3
- 5. Electronic Mail from Andrew Hon (USNRC) to William R. Murray (Duke Energy Progress, Inc.), Brunswick Steam Electric Plant, Units 1 and 2 -
Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (TAC Nos. ME9623 and ME9624), dated August 8, 2014, ADAMS Accession Number ML14220A213 Ladies and Gentlemen:
By letter dated September 25, 2012 (i.e., Reference 1), as supplemented by letter dated December 17, 2012 (i.e., Reference 2), Duke Energy Progress, Inc., submitted a license amendment request (LAR) to adopt a new, risk-informed, performance-based (RI-PB) fire protection licensing basis for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.
On May 15, 2013 (i.e., Reference 3), the NRC provided a request for additional information (RAI) regarding the radiation releases. By letter dated September 30, 2013 (i.e., Reference 4);
Duke Energy responded to the RAI. Subsequently, on August 8, 2014 (i.e., Reference 5), the NRC provided an electronic, follow-up RAI regarding the information provided in Reference 4.
The response to the follow-up RAI is provided in the Enclosure of this letter.
This document contains no new regulatory commitments.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on August 29, 2014.
Sincerely, George T. Hamrick GTH/mkb
Enclosure:
Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805
U.S. Nuclear Regulatory Commission Page 3 of 3 cc (with enclosure):
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. W. Lee Cox, III, Section Chief (Electronic Copy Only)
Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov
Enclosure Page 1 of 2 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 By letter dated September 25, 2012, as supplemented by letter dated December 17, 2012, Duke Energy Progress, Inc., submitted a license amendment request (LAR) to adopt a new, risk-informed, performance-based (RI-PB) fire protection licensing basis for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.
On May 15, 2013, the NRC provided a request for additional information (RAI) regarding the radiation releases. By letter dated September 30, 2013, Duke Energy responded to the RAI.
Subsequently, on August 8, 2014, the NRC provided an electronic, follow-up RAI regarding the information provided in the September 30, 2013 letter.
Duke Energy's response to the RAI is provided below.
Radiation Release RAI 02.01 For the outside areas listed in Attachment E where radioactive materials may be stored, please provide the following information:
- a. Identify the type of container used (e.g., sea land type containers) to store the radioactive material.
- b. Describe the administrative controls that limit the amount of activity which may be present in these containers.
- c. Provide a bounding calculation that demonstrates that the radioactive releases from a fire in a container stored in outside areas will not exceed the applicable 10 CFR Part 20 limits. The analysis should include the assumptions, a summary of the methodology and calculations, and resulting doses.
- d. Provide any administrative controls that will be used to control the release of liquids which may become contaminated from fire-fighting activities.
Response
- a. As described in site procedure OE&RC-0293, Management of Radioactive Material &
Radwaste Containers at BNP, the following types of storage/waste containers can be used to store radioactive materials.
125 to 275 gallon poly totes for liquids (or similar for bulk liquids) 90 cubic foot lift liners (i.e., soft sided containers) 55 gallon steel drum - approximately 7 cubic foot capacity or 50 gallons 0
B-12 Steel Box - approximately 40 cubic foot capacity, approximately 72 inches long, 24 inches high, and 48 inches wide B-25 Steel Box - approximately 90 cubic foot capacity, approximately 72 inches long, 48 inches high, and 48 inches wide 0 Steel Cargo Van - Standard 20 foot general purpose cargo vans, approximately 20 feet or 40 feet long, 8 feet high, 8 feet wide
- b. Storage of radioactive material and equipment containers in outside areas (i.e., material NOT stored in a building) at BSEP is controlled by site procedure OE&RC-0293, Management of Radioactive Material & Radwaste Containers at BNP. The procedure
Enclosure Page 2 of 2 provides for an administrative limit of less than or equal to 80 millirem/hour at 30 centimeters, which was considered when providing the bounding calculation described in section 'c' below.
- c. Calculation BNP-RAD-027, Evaluation of Dose Consequence from a Fire in a Radwaste Container Stored in an Outside Area, is a bounding calculation that demonstrates that the radioactive releases from a fire in a container stored in outside areas will not exceed the applicable 10 CFR Part 20 limits. This analysis has determined that a fire in a container stored at the Container Van Storage Area, which contains the maximum quantity of procedurally allowed radioactivity, will result in a dose at the site boundary of 0.26 millirem in one hour. Calculation BNP-RAD-027 includes the assumptions, a summary of the methodology and calculation, resulting dose, and has been posted to the Brunswick NFPA 805 SharePoint location for detailed review.
- d. Release of liquids to any unrestricted area due to the direct effects of fire suppression activities will be controlled by Pre-Fire Plan OPFP-TRM, Transient Radioactive Material Pre-Fire Plan, which is described as an Implementation Item in Attachment "S", Table S-2, Item 2.