August 21, 2014 MEMORANDUM TO:
Stephen Koenick, Acting Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Licensing and Inspection Directorate Office of Nuclear Material Safety and Safeguards FROM:
Sandra Wastler, Branch Chief /RA/
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF THE BEAVER VALLEY POWER STATION UNITS 1 AND 2 PHYSICAL SECURITY PLAN (REVISION 19) FOR THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY AND VERIFICATION OF ADDITIONAL SECURITY MEASURES INCORPORATION (TAC NO. L24936)
The staff has completed its review of Beaver Valley Power Station Units 1 and 2 Physical Security Plan (PSP) Rev.19, which was submitted by FIRSTENERGY NUCLEAR COMPANY (FENCO) to the U.S. Nuclear Regulatory Commission (NRC) via letter dated June 27, 2014.
Based on our review, we find the submitted Beaver Valley PSP to be acceptable, and that it has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR) Section 73.55, as well as the Additional Security Measures (ASM) imposed by NRC Order EA-13-112.
An on-site physical security inspection (IR No. 07201043/2014403) was completed during the week of July 28, 2014, to verify that the PSP successfully meets the objectives outlined in IP 81311. Based on staffs observations, the PSP has met the performance objectives and general requirements outlined in 10 CFR Section 73.55 and the ASMs imposed by the NRC.
Docket Nos. 50-334, 50-412, 72-1043 CONTACT: Douglas Garner, NSIR/DSP (301) 287-0929
ML14231A025 OFFICE DSP/MWSB MWSB/BC NAME DGarner SWastler DATE 08/19/14 08/21/14