MONTHYEARML14314A8722014-07-0101 July 2014 Attachment B: FPL Turkey Point Power Plant Additional Temporary Use of Water Conditions of Certification (PA 03-45D), Sfwmd File 720202-1 Project stage: Request L-2014-216, License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-10010 July 2014 License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Request L-2014-226, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval2014-07-17017 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval Project stage: Request ML14203A6182014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML14203A6142014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML15131A5752014-07-18018 July 2014 La - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI L-2014-221, Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131)2014-07-21021 July 2014 Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131) Project stage: Request ML14203A6202014-07-21021 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14204A8142014-07-22022 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-232, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-22022 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI L-2014-235, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information2014-07-22022 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information Project stage: Supplement ML14204A1292014-07-24024 July 2014 LTR - Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Sign. Hazards and Opportunity for Hearing (Exigent Circumstances) (TAC No. MF4392-4293) Project stage: Other L-2014-236, Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit2014-07-24024 July 2014 Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit Project stage: Request ML14199A1112014-07-24024 July 2014 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Sign. Hazards and Opportunity for Hearing (Exigent Circumstances) (TAC No. MF4392-4293) Project stage: Other ML14208A0102014-07-25025 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14206A8062014-07-25025 July 2014 Biological Assessment on the American Crocodile for Proposed License Amendment to Increase the Turkey Point Ultimate Heat Sink Temperature Limit Project stage: Other L-2014-249, Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink2014-07-25025 July 2014 Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink Project stage: Request L-2014-237, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-26026 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14208A0112014-07-26026 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI NRC-2014-0181, Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393)2014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393) Project stage: Other L-2014-253, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-28028 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14216A0722014-07-28028 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14209A0312014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit Project stage: Other L-2014-250, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1)2014-07-29029 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) Project stage: Supplement ML14210A1702014-07-29029 July 2014 Letter from C. Aubrey, Fws, to D. Wrona, NRC, Concurrence with NRCs Biological Assessment Determination and Conclusion of ESA Section 7 Consultation Project stage: Request ML14217A0042014-08-0303 August 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-259, Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-08-0404 August 2014 Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Request ML14199A1072014-08-0808 August 2014 Issuance of Amendments Under Exigent Circumstances Regarding Ultimate Heat Sink and Component Cooling Water Technical Specifications (Tacs MF4392 and MF4393) Project stage: Approval 2014-07-24
[Table View] |
Text
NRR-PMDAPEm Resource From: Klett, Audrey Sent: Monday, July 28, 2014 3:53 PM To: Tomonto, Bob (Bob.Tomonto@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com); 'Hanek, Olga' (Olga.Hanek@fpl.com)
Cc: Cross, William (WILLIAM.CROSS@fpl.com)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393)
By letter dated July 10, 2014, as supplemented by letters dated July 17, July 22, July 24, and July 26, 2014, Florida Power & Light Company (the licensee) submitted a license amendment request for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The licensee requested revisions to the Turkey Point Technical Specifications (TSs), Section 3/4.7.4, Ultimate Heat Sink [UHS].
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee and determined that it needs additional information to complete the review. The NRC staffs request for additional information (RAI) is as follows.
SCVB RAI-4 Please describe the changes that will be included in the UFSAR related to the license amendment request (e.g., regarding maintaining the component cooling water heat exchangers so that they are ready and capable of functioning as intended during normal and accident conditions).
BOP RAI-7 The licensees response to BOP RAI-1 states that the input to HX3/HX4 is TICW in, TICW out, TCCW in, TCCW out, and intake cooling water (ICW) Flow Rate.
The licensees response also states that The HX3/HX4 program equates the heat gain by the ICW system, the heat loss from CCW [component cooling water] and then determines the overall heat transfer coefficient, U, based on the surveillance heat transfer rate and logarithmic mean temperature difference. The HX3/HX4 program determines the TR [tube resistance] based on the surveillance overall heat transfer coefficient U, first principle equations and appropriate film coefficients.
When doing the surveillances, Q is unknown.
Equations:
- 1. QICW= (MICW) (CP ICW) (TICW out - TICW in)
- 2. QCCW = (MCCW) (CP CCW) (TCCW in -TCCW out)
- 3. Q = U0 (A) LMTD
- 4. Q= QICW = QCCW Where:
QICW = Heat Gain to ICW from CCW CP ICW = ICW Specific Heat MICW = ICW Mass Flow Rate TICW out = ICW Outlet Temperature TICW in = ICW Inlet Temperature QCCW = Heat Loss from CCW to ICW MCCW = CCW Mass Flow Rate CP CCW = CCW Specific Heat TCCW in = CCW Inlet Temperature TCCW out = CCW Outlet Temperature 1
U0 = Overall Heat Transfer Coefficient A = Total Tube Exterior Surface Area LMTD = log mean temperature differential Variables that are underlined are known.
Q is needed to get U0, which is needed to get TR (tube resistance), so that one can accurately enter Figure 3.5-1 of the licensees letter dated July 10, 2014, or the graphs of HX3/HX4. The unknowns are Q, CP ICW, MCCW, and U0. Considering equations 1, 2, and 3, there are 3 equations and 4 unknowns.
A. How does the licensee know the value of U0?
B. When the licensee knows the value of U0, how does it find TR knowing that the tube side film coefficient is affected by the algae?
C. How does the licensee know it has the correct TR when doing surveillances and thus is able to know that there is sufficient heat transfer capability for a design basis accident?
BOP RAI-8 In its response to BOP RAI-6 by letter dated July 26, 2014, the licensee stated, The RHR [residual heat removal] Pump mechanical seals are cooled by CCW [component cooling water] through mechanical seal coolers with process fluid on the tube side and CCW water on the shell side. Per Drawing 5610-M-450-96, Sheet 1, CCW is to be available at 145ºF [degrees Fahrenheit] initially, decreasing to 125ºF in 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />.
The licensee also stated, The CS [containment spray] Pump mechanical seal is cooled by CCW through a mechanical seal cooler. The maximum operating temperature for the Containment Spray Pump mechanical seal is 205ºF. Per the vendor data sheets for the mechanical seals on the Unit 4 CS pumps, 3 gpm [gallons per minute] of flow at 150ºF is needed for the CS pump seal coolers.
However, the peak CCW supply temperature to the RHR and CS pumps during a loss-of-coolant accident, double-ended pump suction (LOCA-DEPS) break approaches 160°F and stays above 150°F for several hours after the accident, according to the licensees letter dated July 24, 2014. The CCW supply temperature appears to be too high to meet the vendor-specified cooling requirements for these pumps. Discuss how the RHR and CS pumps will have adequate cooling to run continuously in order to perform their design basis function during a design basis accident.
Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489 2
Hearing Identifier: NRR_PMDA Email Number: 1465 Mail Envelope Properties (Audrey.Klett@nrc.gov20140728155200)
Subject:
Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393)
Sent Date: 7/28/2014 3:52:53 PM Received Date: 7/28/2014 3:52:00 PM From: Klett, Audrey Created By: Audrey.Klett@nrc.gov Recipients:
"Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>
Tracking Status: None "Tomonto, Bob (Bob.Tomonto@fpl.com)" <Bob.Tomonto@fpl.com>
Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Tracking Status: None
"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4613 7/28/2014 3:52:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: