ML14183B460

From kanterella
Jump to navigation Jump to search
Er 05000269-14-302, 05000270-14-302 and 05000287-14-302, 06/05/2014, Oconee, Notification of Licensed Operator Initial Examination
ML14183B460
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/01/2014
From: Widmann M
NRC/RGN-II/DRS/EB1
To: Batson S
Duke Energy Corp
References
50-269/OL-14, 50-270/OL-14, 50-287/OL-14
Download: ML14183B460 (4)


See also: IR 05000269/2014302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

July 1, 2014

Scott Batson

Vice President, Oconee Nuclear Station

Duke Energy Corporation

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT:

OCONEE NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000269/2014302, 05000270/2014302, AND

05000287/2014302

Dear Mr. Batson:

During a telephone conversation on June 05, 2014, between Mr. Louis Nowell, NRC Exam

Development Supervisor, and Mr. Michael Meeks, Senior Operations Engineer, arrangements

were made for the administration of licensing examinations at the Oconee Nuclear Plant. The

operating test is scheduled to be administered during the week of December 08, 2014. The

written examination is scheduled to be administered the week of December 15, 2014. The on-

site preparatory week is scheduled for the week of November 10, 2014.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by September 22, 2014. Mr. Meeks provided the written examination outline to your staff

in May, 2014. The written examination and the supporting reference materials identified in

Attachment 3 to ES-201 will be due by October 06, 2014. The operating examination will be

due by October 23, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal

Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall

approve the outline, examination, and test before they are submitted to the NRC for review and

approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

S. Batson

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-

302,your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

S. Batson

3

Thank you for your cooperation in this matter. Mr. Nowell has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail:

Michael.Meeks@nrc.gov), or me at (404) 997-4550, (Internet E-mail:

Malcolm.Widmann@nrc.gov ).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DRP-55

cc: Distribution via Listserv

__ML14183B460___________

x

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

MKM3

MTW

NAME

MEEKS

WIDMANN

DATE

7/1/2014

7/1/2014

7/ /2014

7/ /2014

7/ /2014

7/ /2014

7/ /2014

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO