UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 April 10, 2014 MEETING
SUMMARY
LICENSEE:
FACILITY:
Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem)
Hope Creek Generating Station (Hope Creek)
SUBJECT:
Summary of Annual Assessment Meeting with PSEG On March 27, 2014, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open-house at the PSEG Energy & Environmental Resource Center in Salem, NJ. The NRC conducted the open-house to discuss its assessment of the safety performance at Salem and Hope Creek for 2013.
A notice of the open house was issued on March 11, 2014, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14070A470.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and was available to discuss its assessment of the safety performance of Salem and Hope Creek for the period of January 1 through December 31, 2013, as documented in our letters dated March 4, 2014, ADAMS Accession No. ML14062A013 and ML14062A017. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRCs Annual Assessment Process and the safety performance of Salem and Hope Creek can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.
Members of the media and public, along with State and local officials, attended the open-house, and were offered the opportunity to question the NRC regarding Salems and Hope Creeks performance and the role of the agency in ensuring safe plant operations.
/RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects
ML14062A013 and ML14062A017. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRCs Annual Assessment Process and the safety performance of Salem and Hope Creek can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.
Members of the media and public, along with State and local officials, attended the open-house, and were offered the opportunity to question the NRC regarding Salems and Hope Creeks performance and the role of the agency in ensuring safe plant operations.
/RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution:
G. Dentel J. Hawkins C. Ott R. Barkley P. Finney M. Draxton S. Ibarrola B. Reyes A. Ziedonis
DOCUMENT NAME: G:\\DRP\\BRANCH3\\COMMUNICATIONS\\PUBLIC MEETINGS\\2014 ANNUAL ASSESSMENT MEETING\\SAL_HC\\MEETING
SUMMARY
\\SAL_HC MEETING
SUMMARY
2014 REV 0.DOCX ADAMS Accession No.: ML14100A024 SUNSI Review Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MD/ MD GTD/ GTD DATE 04/08/14 04/09 /14