S EntErg00oEntergy Nuclear Operations, Inc.
En teW 600 Rocky Hill Road Plymouth, MA 02360 October 8, 2013 Pilgrim Nuclear Power Station ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
10 CFR 71.95 Report Issues Involving Radwaste Cask 8-120B Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER 2.13.080
Dear Sir or Madam:
Entergy Nuclear Operations, Inc (Entergy) hereby submits this report pursuant to 10 CFR 71.95(a)(3) regarding potential instances in which the conditions of approval in Certificate of Compliance (CoC) #9168 for the 8-120B cask may not have been observed in making shipments from Pilgrim Nuclear Power Station (PNPS). The attached notification from the certificate holder (EnergySolutions) provides the information related to the condition and requirements for 10 CFR 71.95 Reports (Attachment 1).
On August 11, 2013, the model 8-120B cask certificate holder notified Entergy staff at PNPS and other customers via email, that their investigation into the recent vent and drain port leak test finding was complete. Attachment 1, dated August 14, 2013, was developed by the certificate holder, and is applicable to the use of the 8-120B by Entergy at PNPS. Due to the time frame over which the discrepancy between the Air Pressure Drop Test Procedure TR-TP-002 and the 8-120B Safety Analysis Report (SAR) existed, Entergy cannot rule out that shipments may have occurred with the opening of the subject vent port seal and performed a leak test for 20 minutes, rather than the 60 minutes required by the SAR. The model 8-120B cask was last used at PNPS on August 30, 2012. Attachment 2 provides a listing of shipments from PNPS where the model 8-120B cask was used.
This report contains no new commitments. Please contact me at (508) 830-8403 if you have any questions regarding this information.
Sincerely, Joseph R. Lync Licensing Manager JRL/mew Attachments:
- 1. ENERGYSOLUTIONS Letter CD13-0232 - 10 CFR 71.95 Report on the 8-120B Cask
Letter 2.13.080 Page 2 of 2 cc:
Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 Ms. Nadiyah Morgan, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North Mail Stop O-8C2A 11555 Rockville Pike Rockville, MD. 20852 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Mr. Daniel B. Shrum Senior Vice President, Regulatory Affairs EnergySolutions 423 West 300 South Suite 200 Salt Lake City, UT 84101
Attachment I to Letter 2.13.080 10 CFR 71.95 Report on the 8-120B Cask (5 Pages)