NRC IMC 0350 Security Team Inspection Report 05000285-13-407
ML13213A497
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/01/2013
From: Hay M
NRC/RGN-IV/DRP
To: Cortopassi L
Omaha Public Power District
References
EA-11-035, EA-11-246 IR-13-407
Download: ML13213A497 (4)


See also: IR 05000285/2013407

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

EA-11-035

EA-11-246

Louis P. Cortopassi, Site Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION - NRC IMC 0350 SECURITY TEAM INSPECTION

REPORT 05000285/2013407

Dear Mr. Cortopassi:

On June 20, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental

inspection at your Fort Calhoun Station. The enclosed inspection report documents the

inspection results, which were discussed on June 20, 2013, with you and other members of your

staff.

In accordance with Inspection Manual Chapter (IMC) 0350, Oversight of Reactor Facilities in a

Shutdown Condition Due to Significant Performance and/or Operational Concerns, this

supplemental inspection was performed to follow-up on performance issues which occurred in

the first quarter of 2013 as documented in NRC Inspection Report 05000285/2013405. During

that inspection, the NRC identified significant problems with your staffs collective evaluation of

security-related violations that were of Greater than Green security significance. This led the

team to conclude that the fundamental performance issues within security, and their impact on

security processes, were not adequately identified nor corrected. Additionally, the team

identified issues related to the sites use of security-related operating experience, and security

problem identification and resolution processes.

The objectives of this supplemental inspection were to provide assurance that your staff had

corrected the issues identified during the previous inspection by performing a comprehensive

evaluation of the collective causes, to include the extent of these causes, for the Greater than

Green Findings, and to verify that security problems are being identified and resolved

adequately. Overall, the team concluded that your staff had performed a comprehensive

collective evaluation of security performance issues and that the corrective actions developed

during the evaluation were adequate. Additionally, the team determined that security problem

identification and resolution had improved since the last inspection and, overall, was functioning

at a level consistent with regulatory requirements. Based on these results the NRC determined

that Restart Checklist Items 1.d. (Security - Greater than green findings) and 5.i. (Security) are

closed.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

August 1, 2013

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

L. Cortopassi

- 2 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

One NRC identified finding of very low security significance (i.e., Green as determined by the

Physical Protection Significance Determination Process) was identified during this inspection.

The deficiency was promptly corrected or compensated for, and the plant was in compliance

with applicable physical protection and security requirements within the scope of this inspection

before the team left the area. This finding was determined to involve a violation of NRC

requirements.

If you contest this noncited violation (NCV) or the significance of this NCV, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-

0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement,

United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC

Resident Inspectors at Fort Calhoun Station

A cross-cutting aspect was assigned to the finding in the area of Problem Identification and

Resolution, because your staff failed to take appropriate actions to address a security issue

[P1.(d)]. If you disagree with the cross-cutting aspect assignment in this report, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspectors at

Fort Calhoun Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's Agencywide Document Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed contains Security-Related Information in accordance with

10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security

vulnerability. Therefore, the material in the enclosure will not be made available electronically

for public inspection in the NRC Public Document Room or from the PARS component of NRC's

ADAMS. If you choose to provide a response and Security-Related Information is necessary to

provide an acceptable response, please mark your entire response Security-Related

Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with

10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In

accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your

response.

Sincerely,

/RA/

Michael C. Hay, Chief

Reactor Project Branch F

Division of Reactor Projects

Docket No.: 50-285

License No.: DPR-40

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

L. Cortopassi

- 3 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Nonpublic Enclosure:

NRC Inspection Report 05000285/2013407

w/Attachment: Supplemental Information

cc w/enclosure:

Mr. Dennis A. Bakalar

Manager, Site Security

Omaha Public Power District

Fort Calhoun Station

Mail Stop FC-2-1

9610 Power Lane

Blair, NE 68008

cc w/o enclosure:

Electronic Distribution for Fort Calhoun Station

ML13213A497

Cover Letter Only

Non Sensitive JMR

Publicly Available JMR

SUNSI Review JMR

Sensitive

Non-Publicly Available

Cover Letter w/enclosure

Non Sensitive

Publicly Available

MD 3.4 Non-Public A.3

JMR

Sensitive Periodic Review

Required JMR

Non-Publicly Available JMR

SPSI:RIV:PSB1

SPSI:RII:PSB2

PSI:RIV:PSB1

PSI:NSIR:DSO

C:PSB1

JRollins

JWallo

JBuchanan

JClark

MHaire

/RA/

/RA/

/RA/

/RA/

/RA/

7/22/13

7/22/13

7/22/13

7/22/13

7/29/13

C:ACES

C:RPBF

HGepford

MHay

/RA/

/RA/

7/30/13

8/1/13