UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 24, 2013 Mr. Richard L. Anderson Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000331/2013008
Dear Mr. Anderson:
On September 3, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 baseline inspection at the Duane Arnold Energy Center. This inspection will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17.
The onsite portion of the inspection will take place on September 3 - 6, 2013, and September 16 - 20, 2013.
Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc and delivered to the regional office no later than July 19, 2013. The inspection team will review this information and, by August 5, 2013, will request specific items that should be provided for review in the regional office by August 19, 2013.
The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e. Item (1)), will be requested for review in the regional office prior to the inspection by August 19, 2013, as identified above. The remaining documents should be available by the first day of the onsite inspection, September 3, 2013.
The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. The remaining documents in group three should be available by the first day of onsite inspection, September 3, 2013. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
R. Anderson The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory contact for this inspection is Mr. Robert Murrell of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9743 or via e-mail at George.Hausman@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-331 License No. DPR-49
Enclosure:
Modification and 50.59 Inspection Document Request cc w/encl:
Distribution via ListServ'
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST 1
Enclosure Inspection Report: 05000331/2013008 Inspection Dates:
September 3 - 6, 2013, and September 16 - 20, 2013 Inspection Procedure:
Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Lead Inspector:
Mr. George M. Hausman (630) 829-9743 George.Hausman@nrc.gov Mr. Robert A. Winter Mr. Jorge J. Corujo-Sandin (630) 829-9758 (630) 829-9741 Robert.Winter@nrc.gov Jorge.Corujo-Sandin Observer:
Mr. David J. Oliver II (630) 829-9847 David.Oliver@nrc.gov I.
Information Requested for In-Office Preparation Week The following information is requested by July 19, 2013, or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspection team will select specific items from the information requested below and submit a list to your staff by August 5, 2013. We will request that certain items be made available to the regional office prior to the inspection by August 19, 2013. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection (i.e., September 3, 2013). All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 Inspection to the present.
The required information identified below should be provided on compact disc (CD).
Please provide three copies of each CD submitted (i.e., one for each inspector).
The preferred file format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
(1)
List of permanent plant modifications to systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)
The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST 2
Enclosure (2)
List of all 10 CFR 50.59 completed evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine operating configurations, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:
- a.
Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since the last inspection;
- b.
Modifications that are field work complete; and
- c.
Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.
(3)
A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(4)
A list of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.
(5)
A list of calculation changes that have been issued for use.
(6)
A list of corrective action documents (open and closed) that address permanent plant modifications or 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
(7)
Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings, and UFSAR updates.
(8)
UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.
(9)
Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST 3
Enclosure (10)
Electronic copy of the UFSAR and Technical Specifications, if available.
(11)
Name(s) and phone numbers for the regulatory and technical contacts.
(12)
Current management and engineering organizational chart.
II.
Information Requested to be Available Prior to and at the Start of the Inspection.
Requests will be made for specific Item (1) documents by August 5, 2013. Provide requested Item (1) documents to the Regional Office by August 19, 2013. Documents Identified in Items (2), (3), and (4) are requested to be available on the first day of the inspection (September 3, 2013).
(1)
Copies of all selected items from Group I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2)
Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
- a.
Updated Final Safety Analysis Report, if not previously provided;
- b.
Original FSAR Volumes;
- c.
Original SER and Supplements;
- d.
FSAR Question and Answers;
- e.
Quality Assurance Plan;
- f.
Technical Specifications, if not previously provided;
- g.
Latest IPE/PRA Report;
- h.
Vendor Manuals; and
- i.
The latest 10 CFR 50.59 UFSAR Update Submittal.
(3)
Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
- a.
Drawings supporting the modifications;
- b.
Procedures affected by the modifications; and
- c.
UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4)
Assessment and Corrective Actions:
- a.
The most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment; and
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST 4
Enclosure
- b.
Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.
III.
Information Requested to be Provided Throughout the Inspection (1)
Copies of any corrective action documents generated as a result of the inspection teams questions or queries during this inspection.
(2)
Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team leader.
R. Anderson The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory contact for this inspection is Mr. Robert Murrell of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9743 or via e-mail at George.Hausman@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-331 License No. DPR-49
Enclosure:
Modification and 50.59 Inspection Document Request cc w/encl:
Distribution via ListServ' DISTRIBUTION:
See next page DOCUMENT NAME: DAEC MOD/50.59 Notification Letter and RFI (GMH)
Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII NAME G.Hausman:bl RDaley DATE 6/20/13 6/24/13 OFFICIAL RECORD COPY
Letter to Mr. Richard L. Anderson from Mr. Robert C. Daley dated June 20, 2013.
SUBJECT:
DUANE ARNOLD ENERGY CENTER - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION DISTRIBUTION:
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak