From:
Mike Mulligan [steamshovel2002@gmail.com]
Sent:
Sunday, May 26, 2013 1:53 PM To:
Guzman, Richard
Subject:
Pilgrim: Evacuation Plan Broken During Blizzard Nemo And Unenforced By The NRC Power Reactor Event Number: 49062 Facility: COOPER Region: 4 State: NE Unit: [1] [ ] [ ]
RX Type: [1] GE-4 NRC Notified By: NATHAN L. BEGER HQ OPS Officer: CHARLES TEAL Notification Date: 05/23/2013 Notification Time: 15:45 [ET]
Event Date: 05/23/2013 Event Time: 10:19 [CDT]
Last Update Date: 05/23/2013 Emergency Class: NON EMERGENCY 10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE Person (Organization):
NEIL OKEEFE (R4DO)
Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode 1
N Y
100 Power Operation 100 Power Operation Event Text TEMPORARY LOSS OF METEOROLOGICAL MONITORING SYSTEM DURING PLANNED MAINTENANCE "At 1019 CDT, AC power was removed from the site meteorological monitoring system (MET) equipment for planned maintenance in order to remove abandoned equipment left in place since installing the new meteorological system in October 2012. Removing AC power was not expected to have an effect since all MET information would continue to be available due to an 8-hour battery backup system installed at the meteorological tower. However, when power was removed, all onsite meteorological data was lost to the control room via the Plant Management Information System (PMIS). PMIS is the only display of local direct meteorological conditions available. Subsequently, [Cooper Nuclear Station] CNS determined the interface between MET system and PMIS was not powered from the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> MET battery backup system which accounted for the lost MET indication. CNS corrected the condition and restored meteorological data to the control room via the PMIS system at 1219 CDT.
"Site backup assessment capability relies on Meteorological model estimates from the National Weather Service out of Valley, Nebraska or on default values derived from historical local weather patterns. Since there was no direct information of site meteorological conditions during the period of lost power, CNS considered this to be
a major loss of assessment capability and reportable under 10CFR50.72(b)(3)(xiii)."
The NRC Resident Inspector has been informed.
Mr Guzman, So here is an official concern to the NRC by me. I not crazy!
With LER 2013-003-00 Entergy admits the the plant information (PI) system stopped recording weather data. Whatever that means? Was the spinning cups out in the weather frozen and iced over during blizzard Nemo or did the instruments fail because of the power failure? Was it just a data recording issue or did the site lose wind speed and direction indication in the control room or at the tech support center?
Cover-Up: Public Notification And Radiation Evac Plan Broke During Accident http://steamshovel2002.blogspot.com/2013/05/loss-of-off-site-power-events-due-to.html I am calling it, they lost wind speed and direction indication in the control room and the evacuation plan was severely impaired.
2013-003-00: "During the storm on February 8, meteorological instruments at PNPS recorded sustained wind speeds between 42 and 49 mph through 2338 hours0.0271 days <br />0.649 hours <br />0.00387 weeks <br />8.89609e-4 months <br /> at which time the plant information (PI) system stopped recording weather data until 1840 hours0.0213 days <br />0.511 hours <br />0.00304 weeks <br />7.0012e-4 months <br /> the following day. The wind direction was predominantly from the ocean toward the switchyard during the storm So why didnt Pilgrim during the Nemo Blizzard make an event report like the Cooper station?
Cooper: "At 1019 CDT, AC power was removed from the site meteorological monitoring system (MET) equipment for planned maintenance in order to remove abandoned equipment left in place since installing the new meteorological system in October 2012 Why was there no major loss of assessment capability and reportable under 10CFR50.72(b)(3)(xiii)" like the Cooper station?
Cooper: Since there was no direct information of site meteorological conditions during the period of lost power, CNS considered this to be a major loss of assessment capability and reportable under 10CFR50.72(b)(3)(xiii)."
And it raises questions if this should have been reported in the emergency classification system such as a Unusual Event.
It raises issue if the Met instrumentation has failed in other power failures, blizzards and weather conditions and not reported as required?
It is beyond utter incompetence and negligence with public reporting on plant events with Entergy and the NRC on this atrocious incomplete statement:
"the plant information (PI) system stopped recording weather data". Entergy should have been forced to add a few sentences in the LER like, we still had wind speed and direction indication in the control room or this is how the site would have carried out the evacuation if we had become blind to knowing wind speed and direction.
Why didnt Entergy carry fully out their licensing reporting responsibilities during Blizzard Nemo and why is the NRC negligent with enforcing their rules?
I see the meteorological instrumentation issue wasnt carried at all in your most recent inspection report. And the diesel smoke in the reactor building wasnt covered in the LER. This is so shoddy documentation reporting by both of you.
Would you add this to the docket?
Sincerely, Mike Mulligan Hinsdale, NH