UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 22, 2013 Mr. D. R. Madison Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

PUBLIC MEETING

SUMMARY

- EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366

Dear Mr. Madison:

This refers to the meeting conducted on April 17, 2013, in Vidalia, Georgia. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Edwin I. Hatch Nuclear Plant with the public for the period of January 1, 2012, - December 31, 2012. Enclosed are a list of attendees, copies of the poster boards displayed at the meeting, and the meeting handout.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4611.

Sincerely,

/RA By Jannette Worosilo For/

Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5

Enclosures:

1. List of Attendees
2. Poster Boards
3. Meeting Handout cc w/encls: (See page 2)

April 22, 2013 Mr. D. R. Madison Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

PUBLIC MEETING

SUMMARY

- EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366

Dear Mr. Madison:

This refers to the meeting conducted on April 17, 2013, in Vidalia, Georgia. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Edwin I. Hatch Nuclear Plant with the public for the period of January 1, 2012, - December 31, 2012. Enclosed are a list of attendees, copies of the poster boards displayed at the meeting, and the meeting handout.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4611.

Sincerely,

/RA By Jannette Worosilo For/

Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5

Enclosures:

1. List of Attendees
2. Poster Boards
3. Meeting Handout cc w/encls: (See page 2)

X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:____________

X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE Via email

/RA/

NAME EMorris JWorosilo DATE 04/19/2013 4/22/2013 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\DRPII\\RPB2\\HATCH\\Mid and End of Cycle\\2012\\Hatch 2012 Meeting Summary.DOCX

D. Madison 2

cc w/encls:

C. Russ Dedrickson Fleet Support Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution David R. Vineyard Plant Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. A. Lynch Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution C. R. Pierce Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution B. D. McKinney, Jr.

Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution (cc w/encls contd - See page 3)

D. Madison 3

cc w/encls contd:

L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution W. E. Duvall Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 31513 Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Arthur H. Domby, Esq.

Troutman Sanders Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 Amy Whaley Resident Manager Electronic Mail Distribution

D. Madison 4

Letter to Dennis R. Madison from Frank Ehrhardt dated April 22, 2013

SUBJECT:

PUBLIC MEETING

SUMMARY

- EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366 Distribution w/encls:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource

NRC Annual Assessment Summary Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2012.

Edwin I. Hatch Nuclear Plant

2 NRC Inspection Activities Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Two Major Team Inspections Component Design Bases Initial License Examination Edwin I. Hatch Nuclear Plant for 2012

3 NRC Plans for 2013 NRC plans baseline inspections at Edwin I.

Hatch Nuclear Plant for the remainder of 2013 Major Team Inspections Include:

Problem Identification and Resolution Initial License Examination Plant Modifications Inspection Emergency Preparedness Exercise Triennial Fire Protection Inspection License Renewal Phase 2

4 Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

5 Reactor Oversight Process Regulatory Framework NRCs Overall Safety Mission PUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATION REACTOR SAFETY Strategic Performance Areas RADIATION SAFETY PLANT SECURITY Cornerstones INITIATING EVENTS MITIGATING SYSTEMS BARRIER INTEGRITY EMERGENCY PREPAREDNESS PUBLIC RADIATION SAFETY OCCUPATIONAL RADIATION SAFETY PHYSICAL PROTECTION Human Performance Safety Conscious Work Environment Problem Identification and Resolution Cross-Cutting Areas

Edwin I. Hatch Nuclear Plant Annual Assessment Meeting 2012 Reactor Oversight Process Nuclear Regulatory Commission - Region II

2

3 Significance Threshold Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Performance Indicators Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue

4 NRC Annual Assessment Summary Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2012.

Edwin I. Hatch Nuclear Plant

5 NRC Inspection Activities Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Two Major Team Inspections Component Design Bases Initial License Examination Edwin I. Hatch Nuclear Plant for 2012

6 Edwin I. Hatch Nuclear Plant Performance Indicators and Findings All Green Performance Indicators All Green / Severity Level IV inspection findings January 1 through December 31, 2012

7 NRC Plans for 2013 NRC plans baseline inspections at Edwin I.

Hatch Nuclear Plant for the remainder of 2013 Additional Major Inspections Include:

Problem Identification and Resolution Initial License Examination Plant Modifications Inspection Emergency Preparedness Exercise Triennial Fire Protection Inspection License Renewal Phase 2

8

9