Letter Sequence RAI |
|---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems, L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-341, Firstenergy Nuclear Operating Cos Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0842003-01-22022 January 2003 Drawing No. LR-M039A, Revision 3, Piping & Instrument Diagram Miscellaneous Liquid Radioactive Waste. Job Code 12501 Project stage: Other ML11126A0762003-01-22022 January 2003 Drawing No. LR-M047, Revision 1, Piping & Instrument Diagram Radwaste Drumming Station Project stage: Other ML11126A0552003-08-12012 August 2003 Drawing No. LR-M030B, Revision 1, Reactor Coolant System Instrumentation Project stage: Other ML11126A0862005-08-23023 August 2005 Drawing No. LR-M040D, Revision 2, Piping & Instrument Diagram Reactor Coolant Pump & Motor. Job Code 12501 Project stage: Other ML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1 Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2 Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI L-11-037, Independent Spent Fuel Storage Installation - Changes, Tests, and Experiments2011-02-17017 February 2011 Independent Spent Fuel Storage Installation - Changes, Tests, and Experiments Project stage: Request ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power s Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application.2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application. Project stage: Response to RAI L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start Project stage: Other ML11126A0172011-04-29029 April 2011 Drawing No. LR-M006E, Revision 1, Piping & Instrument Diagram Condensate System Project stage: Other ML11126A0182011-04-29029 April 2011 Drawing No. LR-M007A, Revision 1, Piping & Instrument Diagram Steam Generator Secondary System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0202011-04-29029 April 2011 Drawing No. LR-M003B, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 2 Project stage: Other ML11126A0212011-04-29029 April 2011 Drawing No. LR-M003C, Revision 2, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 3 Project stage: Other 2011-02-17
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 26,2013 Mr. Raymond A. Lieb, Vice President Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760 SUB~IECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4640)
Dear Mr. Lieb By letter dated August 27, 2010, FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 for renewal of Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station (Davis-Besse). The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." By letter dated July 31,2012, the NRC provided the "Safety Evaluation Report with Open Items related to the License Renewal of the Davis-Besse Nuclear Power Station" (SER), and requested that FENOC review the SER and provide comments to the NRC staff. By letter dated September 14,2012, FENOC provided its comments.
During its review, the staff has identified areas where additional information is needed to complete the review. The staff's request for additional information (RAI) is enclosed.
The RAI was discussed with Mr. Clifford I. Custer of your staff, and a mutually agreed upon date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2946 or bye-mail at SamueI,CuadradodeJesus@nrc.gov.
Sincerely,
.(J::;f:;r amuel uadrado de Jesus, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc w/encl: Listserv
March 26, 2013 Mr. Raymond A. Lieb, Vice President Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4640)
Dear Mr. Lieb By letter dated August 27, 2010, FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 for renewal of Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station (Davis-Besse). The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." By letter dated July 31,2012, the NRC provided the "Safety Evaluation Report with Open Items related to the License Renewal of the Davis-Besse Nuclear Power Station" (SER), and requested that FENOC review the SER and provide comments to the NRC staff. By letter dated September 14, 2012, FENOC provided its comments.
During its review, the staff has identified areas where additional information is needed to complete the review. The staff's request for additional information (RAI) is enclosed.
The RAI was discussed with Mr. Clifford I. Custer of your staff, and a mutually agreed upon date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2946 or bye-mail at SamueI.CuadradodeJesus@nrc.gov.
Sincerely, IRA!
Samuel Cuadrado de Jesus, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc w/encl: Listserv DISTRIBUTION: See next page ADAMS Accession No.: ML13051A056
LA:DLR/RPB1*
PM:DLR/RPB1 BC:DLR/RPB1 OGC PM:DLR/RPB1 YEdmonds PMilano DMore BHarris SCuadradoo 02/19113 02/20/13 03/22/13 03/08/13 03/26/13
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4640)
DISTRIBUTION:
HARDCOPY:
DLR R/F E-MAIL:
PUBLIC RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDIrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource DMorey PMilano MMahoney EKeegan BHarris, OGC JCameron, Rill DKimble, Rill
REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE RENEWAL APPLICATION DAVIS-BESSE NUCLEAR POWER STATION RAI A.1-1
Background:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company (FENOC) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S.
Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants." By letter dated July 31,2012, the NRC provided the "Safety Evaluation Report with Open Items related to the License Renewal of the Davis-Besse Nuclear Power Station" (SER), and requested that FENOC review the SER and provide comments to the NRC staff. By letter dated September 14, 2012, FENOC provided its comments.
During the review of the Davis-Besse license renewal application (LRA) by the U.S. Nuclear Regulatory Commission (NRC) staff, FENOC made commitments related to aging management programs to manage the aging effects of structures and components prior to the period of extended operation. The list of these commitments, as well as the implementation schedules and the sources for each commitment, was included as Table A-1 in Appendix A to the SER with Open Items.
In Section 1.7, "Summary of Proposed License Conditions," of the SER with Open Items, the staff stated that following its review of the LRA, including subsequent information and clarifications provided by the applicant, the staff identified proposed license conditions. The first license condition requires the information in the updated safety analysis report (USAR) supplement, submitted pursuant to 10 CFR 54.21(d), as revised during the license renewal application review process, be made a part of the USAR. The second license condition in part states that the activities listed in Appendix A of the SER and the applicant's USAR supplement be completed no later than October 22,2016 (Le., 6 months prior to the period of extended operation).
The NRC plans to revise the second proposed license condition regarding the USAR supplement, which describes certain programs to be implemented and activities to be completed prior to the period of extended operation (PEO). Under the license condition, FENOC will be required to implement those new programs and enhancements to existing programs no later than 6 months prior to the PEO. In addition, the license condition will state that FENOC shall complete those inspection or testing activities as noted in certain commitments by 6 months prior to the PEO or the end of the last refueling outage prior to the PEO, whichever occurs later.
Enclosure
~2-Therefore, the license condition will be revised to state:
The USAR supplement submitted pursuant to 10 CFR 54.21(d), as revised during the license renewal application review process, and as supplemented by Appendix A of NUREG [XXXX], "Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station" dated [Month Year], describes certain programs to be implemented and activities to be completed prior to the period of extended operation.
- a. The licensee shall implement those new programs and enhancements to existing programs no later than 6 months prior to PE~.
- b. The licensee shall complete those inspection and testing activities, as noted in Commitment Nos. x through xx of Appendix A of NUREG XXXX, by the 6-month date prior to PEO or the end of the last refueling outage prior to the PE~, whichever occurs later.
The licensee shall notify the NRC in writing within 30 days after having accomplished item (a) above and include the status of those activities that have been or remain to be completed in item (b) above.
Issue:
As proposed in the Davis~Besse LRA Table A-1, the implementation schedule for some commitments may conflict with the implementation schedule intended by the generic license condition.
Request:
- 1.
Identify those commitments to implement new programs and enhancements to existing programs. Indicate the expected date for completing the implementation of each of these programs and enhancements.
- 2.
Identify those commitments to complete inspection or testing activities prior to the PE~.
Indicate the expected dates for the completion of each of these inspection and testing activities.