ML13003A416

From kanterella
Jump to navigation Jump to search
Mip - La Crosse Boiling Water Reactor Master Inspection Plan- Calendar Year 2013
ML13003A416
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 12/28/2012
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Berg W
Dairyland Power Cooperative
Christine Lipa
References
Download: ML13003A416 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 December 28, 2012 Mr. W. L. Berg President and CEO Dairyland Power Cooperative 3200 East Avenue S.

P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -

CALENDAR YEAR 2013

Dear Mr. Berg:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, and Inspection Manual Chapter 2690, Appendix A, Inspection Program Guidance for Reactor Site Independent Spent Fuel Storage Installations (ISFSI),@ the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LaCrosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of activities planned for the site for the period of January - December 2013 (CY13). The plan outlines how we intend to focus our Regional inspection resources to provide oversight for ISFSI and significant decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of ISFSI and significant decommissioning activities for CY13, the plan and the focus of NRC inspection activities may change to reflect a change in your planned activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning (MCID) Branch staff informed of any significant changes in your proposed schedule of activities. You will be informed of any significant changes to the LACBWR inspection schedule.

We currently project the Region will conduct three inspections at LACBWR through December 2013 to evaluate ISFSI and decommissioning activities. The inspection areas include routine decommissioning and ISFSI security. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if ISFSI or decommissioning activities warrant.

Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action

W. Berg Inspection Procedure Title IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials IP 81311 Physical Security Requirements for ISFSIs IP 81810 Protection of Safeguards Information IP 85102 Material Control and Accounting In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have any questions, please feel free to contact the following members of my staff: Gene Bonano (Security) at (630) 829-9826, Peter Lee (Decommissioning) at (630) 829-9870, and Jeremy Tapp (ISFSI) at (630) 829-9862.

Sincerely,

/RA by Wayne J. Slawinski acting for/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos. 050-00409; 072-00046 License No. DPR-45 cc :

D. Egge, Plant Manager J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson J. Kitsembel, Chairman, Wisconsin Public Service Commission G. Kruck, Chairman, Town of Genoa S. Burmaster, Coulee Region Energy Coalition State Liaison Officer P. Schmidt, Manager, Radiation Protection, Bureau of Environmental and Occupational Health State of Wisconsin

W. Berg Inspection Procedure Title IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials IP 81311 Physical Security Requirements for ISFSIs IP 81810 Protection of Safeguards Information IP 85102 Material Control and Accounting In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have any questions, please feel free to contact the following members of my staff: Gene Bonano (Security) at (630) 829-9826, Peter Lee (Decommissioning) at (630) 829-9870, and Jeremy Tapp (ISFSI) at (630) 829-9862.

Sincerely,

/RA by Wayne J. Slawinski acting for/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket Nos. 050-00409; 072-00046 License No. DPR-45 cc :

D. Egge, Plant Manager J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson J. Kitsembel, Chairman, Wisconsin Public Service Commission G. Kruck, Chairman, Town of Genoa S. Burmaster, Coulee Region Energy Coalition State Liaison Officer P. Schmidt, Manager, Radiation Protection, Bureau of Environmental and Occupational Health State of Wisconsin DISTRIBUTION:

See next page ADAMS Accession Number:

DOCUMENT NAME: G:\\DNMSIII\\Work in progress\\MIP - LaCrosse BWR CY13 MIP.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME PJLee: jc: WJS for JETapp: WJS for GBonano: WJS for CALipa: WJS for DATE 12/28/12 12/28/12 12/28/12 12/28/12 OFFICIAL RECORD COPY

Letter to W. L. Berg from Christine A. Lipa dated December 28, 2012

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -

CALENDAR YEAR 2013 DISTRIBUTION:

Sandra Wastler Douglas Garner Bruce Watson John Hickman Allan Barker Harral Logaras Viktoria Mitlyng Prema Chandrathil Anne Boland Jared Heck MCID Distribution