Boyle, Patrick From:
Martin, Robert ýý\\
Sent:
Thursday, September 08, 2011 7:57 AM To:
Glitter, Joseph Cc:
Kulesa, Gloria; Boyle, Patrick
Subject:
FW: North Anna Meeting on seismic Attachments:
CAL for Perry 1986.docx My answer at this point would be:
I would say that we are relying on the authority in 10 CFR Part 100, Appendix A, V.a.2, "Determination of operating basis earthquake:"
The Operating basis earthquake will specified by the applicant after considering the seismology and geology of the region surrounding the site. If vibratory ground motion exceeding that of the Operating Basis Earthquake occurs, shutdown of the nuclear plant will be required. Prior to resuming operations, the licensee will be required to demonstrate to the Commission that no functional damage has occurred to those features necessary for continued operation without undue risk to the health and safety of the public.
For the Perry 1986 earthquake, Region III issued a CAL. I retyped the basic text of the CAL, as in the Attachment.
From: Leeds, Eric Sent: Wednesday, September 07, 2011 6:41 PM To: Glitter, Joseph; Boger, Bruce; Howe, Allen Cc: Kulesa, Gloria; Martin, Robert; Lund, Louise
Subject:
RE: North Anna Meeting on seismic I'll be there for the entire meeting, if possible. I'm concerned that we have the right technical folks there. What is the regulatory vehicle we're going to use to permit/deny restart?
Eric J. Leeds, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-1270 From: Glitter, Joseph Sent: Wednesday, September 07, 2011 12:07 PM To: Leeds, Eric; Boger, Bruce; Howe, Allen Cc: Kulesa, Gloria; Martin, Robert; Lund, Louise
Subject:
RE: North Anna Meeting on seismic Eric-I might be good if you good attend the beginning of the meeting to kick it off. We can prepare some opening remarks for you. I expect there will be lots of media. Your presence would show that we have senior mgt focus on the North Anna situation.
From: Leeds, Eric Sent: Wednesday, September 07, 2011 10:11 AM To: Boger, Bruce; Glitter, Joseph; Howe, Allen
Subject:
FW: North Anna Meeting on seismic Guys-1,.
/,
I saw the attendee list. Should I attend? If so, should I sit at the conference table? My gut is to attend. Bob is a very experienced, senior PM, so I am very comfortable with him running the meeting and doing the PM thing. Please let me know what my role should be - thanks!
Eric J. Leeds, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-1270 From: BurnellI, Scottf ~
Sent: Wednesday, Sep)tember 07, 2011 10:06 AM To: Martin, Robert; Leeds, Eric; Hiland, Patrick; Wilson, George; Glitter, Joseph Cc: Khanna, Meena; Kulesa, Gloria; McCoy, Gerald; Boyle, Patrick; Franke, Mark; Williamson, Edward; Spencer, Mary; Benner, Eric; Blechman, Paula
Subject:
RE: North Anna Meeting on seismic The press release has been posted to the public website.
From: Martin, Robert Sent: Wednesday, September 07, 2011 9:49 AM To: Leeds, Eric; Hiland, Patrick; Wilson, George; Glitter, Joseph Cc: Khanna, Meena; Kulesa, Gloria; McCoy, Gerald; Boyle, Patrick; Franke, Mark; Burnell, Scott; Williamson, Edward; Spencer, Mary; Benner, Eric; Blechman, Paula
Subject:
North Anna Meeting on seismic The licensee's email below forwards its list of attendees and key message for the meeting. Also attached is the Notice of the Meeting I think OPA is issuing a Press Release.
From: Tom Shaub [1]
Sent: Wednesday, September 07, 2011 9:15 AM To: Martin, Robert
Subject:
meeting attendees and purpose
- Bob, The key message from the meeting is to provide the NRC with an overview of the event and describe our restart readiness demonstration plan.
This includes an overview of the event, discussion of the seismic monitoring equipment, walkdown and test plans-the results to date, and some longer term actions.
The folks from Dominion attending the meeting are US citizens with one exception:
Eugene Grecheck - Vice President - Nuclear Development Nason Larry Lane - Vice President - North Anna Power Station Freddy Mladen - Director Nuclear Safety and Licensing Eric Hendrixson - Director Nuclear Engineering Mark Walker - Manager Nuclear Engineering Page Kemp - Project Manager Divakar Bhargava - Principle Engineer-Engineering Mechanics (Permanent Resident) 2
John _Maccrimmon - Supervisor Nuclear Engineering - Civil Thomas Brookmire - Supervisor Nuclear Engineering - Nuclear Fuel Projects David Sommers-Supervisor Nuclear Licensing E. Thomas Shaub-Nuclear Licensing Larry Lane, Site Vice President Call if you need anything else.
Dominion Resources Services, Inc.
Thomas Shaub Technical Consultant Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Phone: (804) 273-2763 Fax: (804) 273-3715 E-mail: Tom.Shaub(,dom.com CONFIDENT ITY NO
-'CE: This el-ectr fýýcmessage contains infrffiation which ma,-te legally confidential d/or privileged and does no n any case represent afiy ENERGY CO ODITY bid or offef relating t hreto which.binds the sender /fhout an additional ex ss written confirion to that effect. The informigfi'on is interded solely for thindividual or entity n above and acce y anyone else is unaufh'orized. If y~u are not the i tended recipient, any di osure, copying, tribution, or use o e contents of thfis inform tion is prohibite/dand may be unlawful.
you have receive this electronic tr mission in error, please repl mmediately to tl~e sender that you hav eceived the mess e in error, and de e it. Thank you.