ML11292A005
| ML11292A005 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/14/2011 |
| From: | Markey E US HR (House of Representatives), US Congress, US SEN (Senate) |
| To: | Jaczko G NRC/Chairman |
| Rihm R 301-415-1717 | |
| Shared Package | |
| ML11307A315 | List: |
| References | |
| G20110747, LTR-11-0568, SECY-2011-0556, corr-11-0129, FOIA/PA-2012-0121 | |
| Download: ML11292A005 (4) | |
Text
EDO Principal Correspondence Control FROM:
DUE: 11/03/11 EDO CONTROL: G20110747 DOC DT: 10/14/11 FINAL REPLY:
Representative Edward J.
Markey TO:
Chairman Jaczko FOR SIGNATURE OF :
GRN CRC NO: 11-0568 Chairman Jaczko DESC:
ROUTING:
Safe Operation of the Davis-Besse Nuclear Power Plant (EDATS: SECY-2011-0556)
DATE: 10/18/11 Borchardt Weber Virgilio Ash Mamish OGC/GC
- Leeds, NRR Satorius, RIII
- Burns, OGC
- Schmidt, OCA ASSIGNED TO:
EDO CONTACT:
Rihm SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
NRR and Region III to provide input to Roger Rihm,
- OEDO, if required.
Roger Rihm to coordinate response with OGC and OCA.
CA. ~L(iJ ~o V-i E
EDATS Number: SECY-2011-0556 Source: SECY GnrInformatio Assigned To: OEDO Other Assignees:
Subject:
Safe Operation of the Davis-Besse Nuclear Power Plant
==
Description:==
CC Routing: NRR; RegionIll; OGC; OCA ADAMS Accession Numbers -
Incoming: NONE OEDO Due Date: 11 /3/2011 11:00 PM SECY Due Date: 11/7/2011 11:00 PM Response/Package: NONE OhrInfomaio Cross Reference Number: G20110747, LTR-11-0568 Related Task:
File Routing: EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO B
Prcs Infomaio Action Type: Letter Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region IllI to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
Doumn Infrmaion Originator Name: Representative Edward J. Markey Originating Organization: Congress Addressee: Chairman Jaczko Incoming Task Received: Letter Date of Incoming: 10/14/2011 Document Received by SECY Date: 10/18/2011 Date Response Requested by Originator: NONE Page 1 of I
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Oct 17, 2011 16:3 6 PAPER. NUMBER:
ACTION OFFICE:
LTR-1 1-0568 EDO LOGGING DATE:
10/17/2011 AUTHOR:
AFFILIATION:
ADDRESSEE:
SUBJECT:
ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
NOTES:
FILE LOCATION:
REP Edward Markey CONG Gregory Jaczko Expresses concerns regarding the safe operation of the Davis Besse plant Signature of Chairman RF, OCA to Ack 10/14/2011 No Chairman Correspondence ADAMS 11/07/2011 DATE DUE:
DATE SIGNED:
EDO -- G20110747
COMMITTEES NATURAL RESOURCES RANKING DEMOCRAT ENERGY AND COMMERCE EDWARD J. MARKEY 71TH DiSTRICT, MASSACHUSETTS Con greg of the Ein tb 19tateg Jtlouge of Repregentatibeg in*tlinoton, 3N 20515-2107 October 14, 2011 2108 RAYBURN HOUSE OFFICE BUILDING WASHINGTON, DC 20515-2107 f202) 228-2836 DISTRICT OFFICES:
5 HIGH STREET, SUITE 101 MEDFORD, MA 02155 (781) 396-2900 188 CONCORD STREET, SUITE 102 FRAMINGIHAM, MA 01702 15081 875-2900 http://markey.house.gov The Honorable Gregory B. Jaczko, Chairman Nuclear Regulatory Commission Washington, D.C. 20555-0001
Dear Chairman Jaczko:
Media reports indicate that the troubled Davis-Besse nuclear power plant in Ohio, which previously was forced to close when the Nuclear Regulatory Commission (NRC) found that acid in its cooling water had nearly burned a hole through the reactor's pressure head, now has a 30 foot crack in its protective outer containment. Apparently these cracks may be related to the licensee having cut a hole into the side of the shield building in order to install a new reactor vessel head.
This raises the question of whether it is safe for this reactor to ever be returned to operation, and what other structural safety problems the reactor may be experiencing. I, therefore, request that you report on the causes and consequences of the reported crack, whether there are other structural integrity issues may exist at the Davis Besse nuclear power plant and what actions the NRC, its staff, and the licensee are taking in response to this-situation.
Thank you for your assistance and cooperation in responding to this request.
Sincerely, Edward 3. Markey Member of Congress IS N-i'l) ON }IMCf(;*.F-D FAPER