ML112380028
| ML112380028 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/14/2011 |
| From: | Szabo A Division of Inspection and Regional Support |
| To: | |
| Szabo, A L, NRR/DPR, 415-1985 | |
| References | |
| Download: ML112380028 (2) | |
Text
Datasheet 2 Signature: Kosmas Lois Date: 7/6/2011 Secondardy Signature: Jo Ann Simpson Date: 07/13/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio Month:
12 3
BWR 3758
$135,000,000 111.3 2.08 0.65 2.32 1.676 191.4 114.2 3.049 250.0 82.0 0.13 2.307 0.22 12.54
% Owned:
Category 12.58%
2 87.42%
2 2%
15.21 2%
2%
2%
7 Parent Company Guarantee1
$27,500,000
$624,345,222 NO Shortfall:
NO Does Licensee Pass:
Does Licensee Pass:
YES Total of Steps 1 thru 3:
Accumulation:
Step 2:
Earnings Credit:
$411,029,051 Decom Period:
$0 Total Annuity Real Rate of Return per year Total Fund Balance:
$411,029,051 Total Step 1 + Step 2
$555,544,472
$41,300,750 Total Earnings for Decom:
Decom Period:
Real Rate of Return per year Total Annuity:
Step 3:
$0 Total Earnings:
$555,544,472 Real Rate of Return per year Value of Annuity per year (amount/See Annuity Sheet)
Number of Annual Payments:
Real Rate of Return per year Site Specific:
Total Step 2:
Years Left in License 15.21 Does Licensee Pass:
NO
$0
$555,544,472 Years remaining after annuity Amount of NRC Minimum/Site Specific:
Ohio Edison Company 50-440 18 31 Termination of Operations:
2026 1986$
Day Base Fx Plant name:
2010 Year:
Perry Nuclear Power Plant Docket Number:
Date of Operation:
Fx Latest Month Px BWR/PWR MWth Px Trust Fund Balance:
Step 1:
Total Earnings:
Bx Ex Lx ECI Base Lx Base Px Latest Month Fx FENGenCo
$538,576,335
$351,552,756
$59,476,295 Amount in Trust Fund:
Licensee:
$77,502,749 NRC Minimum:
$616,079,083
Datasheet 2 Signature: Kosmas Lois Date: 7/6/2011 Secondardy Signature: Jo Ann Simpson Date: 07/13/2011 Spreadsheet created by: Aaron Szabo, Shawn Harwell Formulas verified by: Clayton Pittiglio Month:
12 3
50-440 18 31 Termination of Operations:
2026 Day Plant name:
2010 Year:
Perry Nuclear Power Plant Docket Number:
Date of Operation:
2.00%
15.21 2.00%
2.00%
2.00%
7 1 FENOC has obtained a $95 Million Parental Guaranty (PCG). The FENGenCO share of the BVPS-1 nuclear decommissioning trust has a shortfall of approximately 66 million dollars and the FENGenCo share of the Perry Nuclear Power Plant has a shortfall of approximately $26 million dollars. The NRC staff decided to account for the guaranty such that $67.5 Million is for Beaver Valley and $27.5 Million is for Perry.
NRC staff took the NRC minimum value required for decommissioning and subtracted it from the $95 million of the new PCG. The figure ($3 Million) was divided in half and added to Beaver Valley and Perry PCG's accordingly. This is how the $67.5 million and $27.5 million was derived.
Real Rate of Return per year Accumulation:
Value of Annuity per year
$411,029,051 Total Annuity:
Number of Annual Payments:
Step 5:
Real Rate of Return per year Total Earnings:
$555,544,472 NO If licensee is granted greater than 2% RRR YES
$41,300,750 Total Step 5 Total of Steps 4 thru 6:
$624,345,222 Does Licensee Pass:
Total Earnings:
15.21
$555,544,472
$0
$0 Decom Period:
Step 6:
$555,544,472
$0 Does Licensee Pass:
Real Rate of Return per year Total Annuity Parent Company Guarantee1
$27,500,000 NO Total Step 4 + Step 5 Total Earnings for Decom:
Decom Period:
Does Licensee Pass:
Shortfall:
NO 0
Real Rate of Return per year Years remaining after annuity Trust Fund Balance:
Years Left in License Earnings Credit:
Step 4:
$0