MN 11-026, Public Meeting with Constellation Energy Nuclear to Discuss Constellation Fleet-Wide Performance

From kanterella
(Redirected from ML111950610)
Jump to navigation Jump to search
Public Meeting with Constellation Energy Nuclear to Discuss Constellation Fleet-Wide Performance
ML111950610
Person / Time
Site: Calvert Cliffs, Nine Mile Point, Ginna  Constellation icon.png
Issue date: 07/14/2011
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dental, G., RGN-DRP, 603-474-3580
References
MN 11-026
Download: ML111950610 (3)


Text

Licensee:

Facilities:

Docket No(s):

Time and Date:

Location:

Purpose:

Category:

Attendees:

NRC:

July 15, 20I1 u.s. NU.LEAR REGULAT'R' coMMrssroN MN No'11-026 REGION I NOTICE OF PUBLIC MEETING WITH LICENSEE Constellation Energy Nuclear Group, LLC Calvert Cliffs, R. E. Ginna, and Nine Mile Point Nuclear Generating Stations 50-317, 50-31 8, 50-244, 50-220, and 50-410 July 26,2Q11 9:00 a.m. - 2:30 p.m.

Constellation Energy Chandler Building, 2no Floor, Main Conference Room 100 Constellation Way Baltimore, MD 21202 Constellation requested meeting with NRC management to discuss Constellation fleet-wide performance.

This is a Category 1 Meeting, with the exception of a short, closed to public participation discussion around the lunch break on safeguards and security-related issues. Following the business portion of the meeting, members of the public will have an opportunity to discuss Constellation's performance and the role of the NRC in ensuring safe operations at the plants.

Martin J. Virgilio, Deputy Executive Director for Reactor and Preparedness Programs (DEDR)

William M. Dean, Region l, RegionalAdministrator Eric J. Leeds, Director, Otfice of Nuclear Reactor Regulation (NRR)

James T. Wiggins, Director, Nuclear Security and Incident Response (NSIR)

Glenn T. Dentel, Branch Chief, Division of Reactor Projects (DRP)

Brew Baron. President and Chief Executive Nuclear Officer Maria Korsnidk, Chief Nuclear Officer and Chief Operating Officer, Constellation Nuclear Group James Spina, Vice President, Corporate Site Operations Joe Pacher, Vice President, R.E. Ginna George Gellrich, Vice President, Calvert Cliffs Constellation:

2 Sam Belcher, Vice President - Nine Mile Point Sue Collins, Senior Vice President, Human Resources Joel Dogue, Senior Vice President, Support Services Bruce Montgomery, Manager, Nuclear Safety and Security Bernard Minvielle, Senior Vice President, Chief Financial Officer Steve Miller, Senior Vice President, Legal Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 61 0-337-5233 Glenn.Dentel@nrc.qov E-mail:

The NRC's Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web Site,W,andcontainsinformationregardingvisitorsandsecurity.Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by July 21, 2Q11, via telephone to the NRC meeting contact.

Approved by: /L*{ilM Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc wiencl: Distribution via ListServ

Meeting

Contact:

E-mail:

2 Sam Belcher, Vice President - Nine Mite Point Sue Collins, Senior Vice President, Human Resources Joel Dogue, Vice President Support Services Bruce Montgomery, Manager, Nuclear Safety and Security Bernard Minvielle, Senior Vice President, Chief Financial Officer Steve Miller, Senior Vice President, Legal Glenn T. Dentel, Chief, Projects Branch 1 610-337-5233 Glenn.Dentel@nrc.oov The NRC's Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002 applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.qov, and contains information regarding visitors and security. Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by July 21,2011 via telephone to the NRC meeting contact.

Approved by:

/RA/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution w/encl: (Via E-Mail).

Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OEDO Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nuclear Reactor Regulation, NRR Asst General Counsel Materials Litigation and Enforcement, OGC Director, Division of Inspection and Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRR/DORL Project Directorate l-1 (PD 1/2), NRR (RTDSNRRDORILPTl-1)

RIDSEDOMAILCENTER)

RIDSEDOMAILCENTER)

RIDSNRROD)

RIDSNRROD)

RIDSOGCMAILCENTER)

RTDSNRRDTRS)

RTDSNRRDORL)

W. Dean, RA D. Lew, DRA D. Roberts. DRP J. Clifford, DRP G. Dentel, DRP C. Miller, DRS P. Wilson, DRS N. Perry, DRP J. Hawkins, DRP S. Kennedy, DRP, SRI E. Torres, DRP, Rl T. Newgent, DRP, OA S. Bush-Goddard, Rl, OEDO SUNSI Review Complete: !p (Reviewer's Initials)

D. Screnci, PAO N. Sheehan, PAO N. McNamara. SLO D. Tifft, sLo DRS Div.Secretary, Rl DRP Div. Secretary, Rl DNMS Div Secretary, Rl G. Matakas. ORA C^ O'Daniell. ORA V. Lewis, Rl R OP repo rtsResou rce@ n rc. q ov RidsNrrPMCalvertCliffs Resource MLI 1 1950610 DOCUMENT NAME: G:\\DRP\\PUBLIC MEETING NOTICE\\Public Meeting with ConstellationT.26.2011.docx After declaring this document "An OfficialAgency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenUenclosure 'E' = Copy with attachmenUenclosure "N" = No OFFICE ssm RI/DRP RI/ORA RI/DRP NAME NPerrv/NP RBarkley/RB GDentel/GD DATE 07114t11 07t14t11 07t14111 OFFICIAL RECORD COPY