WAmeren Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITIlliOLD UNDER 10 CFR 2.390 June 29, 2011 ULNRC-05805 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 50.90 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 SUPPLEMENT TO REOUEST FOR APPROVAL OF THE CYBER SECURITY PLAN
References:
- l.
- 2.
- 3.
AmerenUE Letter ULNRC-05719, "Request for Approval of the Callaway Plant Cyber Security Plan (License Amendment Request LDCN 10-0022)," dated August 12,2010 Ameren Missouri Letter ULNRC-05778, "Response to NRC Request for Additional Information Regarding Request for Approval of the Callaway Plant Cyber Security Plan (License Amendment Request LDCN 10-0022, TAC No. ME4536)," dated April 1, 2011 Letter to Mr. A. Heflin, Union Electric Company, from Mr. M. Thadani, NRC; "Callaway Plant, Unit 1 - Request for Additional Information Regarding Revision to the Facility Operating License and Request for Review and Approval of the Cyber Security Plan (TAC No. ME4536),"
dated March 4, 2011 By letter dated August 12,2010 (Reference 1), Ameren Missouri submitted a license amendment request for approval of the Cyber Security Plan for Callaway Plant in accordance with 10 CFR 73.54.
The Enclosure to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of the Enclosure, this letter is uncontrolled.
SECURITY-RELATED INFORMATION - WITIlliOLD UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com
ULNRC-05805 June 29,2011 Page 2 The purpose of this license amendment was to provide an Implementation Schedule, provide a table of Callaway Plant deviations from NEI 08-09 Revision 6, and add a sentence to the existing Callaway Plant Operating License condition for Physical Security to require Ameren Missouri to fully implement and maintain in effect all provisions of the Commission approved Cyber Security Plan.
By letter dated April 1, 2011 (Reference 2), Ameren Missouri submitted responses to additional information requested by the NRC in its Request for Additional Information dated March 4, 2011 (Reference 3). Ameren Missouri wishes to clarify the actions associated with Milestone #6 indicated in the Enclosure to that letter. This clarification is provided in the enclosure to this letter.
The modified response to the request for additional information does not expand the scope of the application and does not impact the conclusions of the no significant hazards consideration determination provided in Reference 1.
This letter and the enclosure contain no new commitments. Should you have any questions, please contact Scott Maglio at (573) 676-8719.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: _...;..{p+!_cQ_q....... l_'_' __
Enclosure:
Cyber Security Plan Implementation Schedule Sincerely, Stephanie P. Banker Manager, Protective Services
ULNRC-05805 June 29,2011 Page 3 cc:
(copy w/out Enclosure except as noted with asterisk*)
us. Nuclear Regulatory Commission (Original and 1 copy)*
Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins, Jr.
- Regional Administrator US. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*
Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*
Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738
ULNRC-05805 June 29,2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
(electronic copy w/out Enclosure)
A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. A. Maglio S. L. Gallagher
~SFUB Secretary T. B. Elwood Ms. Diane M. Hooper (WC~OC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (pG&E)
Mr. Wayne Harrison (STP~OC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)