ULNRC-05790, Facility Operating License NPF-30, Cyber Security Plan Supplement (Lcdn 10-0022 Suppl 1)

From kanterella
(Redirected from ML111660624)
Jump to navigation Jump to search

Facility Operating License NPF-30, Cyber Security Plan Supplement (Lcdn 10-0022 Suppl 1)
ML111660624
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/14/2011
From: Banker S
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML111660618 List:
References
LDCN 10-0022, ULNRC-05790
Download: ML111660624 (4)


Text

~rt.

WAmeren MISSOURI Callaway Plant SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 June 14, 2011 ULNRC-05790 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 50.90 10 CFR 73.54 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 CYBER SECURITY PLAN SUPPLEMENT (LDCN 10-0022 SUPPL 1)

Reference:

1. Letter from Michael Moon (NERC) to Kirit Shah (Ameren), sent via eMail, Dated November 8, 2010,

Subject:

"Update on 706-B Bright-Line"

2. Ameren Missouri letter ULNRC-05719, "Request for Approval of the Callaway Plant Cyber Security Plan (License Amendment Request LDCN 10-0022)," dated August 12, 2010
3. Ameren Missouri letter ULNRC-05732, "Notification Letter Designating Callaway Balance-of-Plant Systems within the Cyber Security Rule Scope,"

dated September 27, 2010

4. Ameren Missouri letter ULNRC-05739, "Update to Notification Letter Designating Callaway Nuclear Plant Unit 1 Station Balance-of-Plant Systems within the Cyber Security Rule Scope," LDCN 10-0022, dated November 29, 2010.

Enclosures 1, 2, and 3 to this letter contain sensitive information.

Withhold from public disclosure under 10 CFR 2.390.

Upon removal of Enclosures 1, 2, and 3, this letter is uncontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

~rt.

WAmeren MISSOURI Callaway Plant SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 June 14, 2011 ULNRC-05790 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 50.90 10 CFR 73.54 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 CYBER SECURITY PLAN SUPPLEMENT (LDCN 10-0022 SUPPL 1)

Reference:

1. Letter from Michael Moon (NERC) to Kirit Shah (Ameren), sent via eMail, Dated November 8, 2010,

Subject:

"Update on 706-B Bright-Line"

2. Ameren Missouri letter ULNRC-05719, "Request for Approval of the Callaway Plant Cyber Security Plan (License Amendment Request LDCN 10-0022)," dated August 12, 2010
3. Ameren Missouri letter ULNRC-05732, "Notification Letter Designating Callaway Balance-of-Plant Systems within the Cyber Security Rule Scope,"

dated September 27, 2010

4. Ameren Missouri letter ULNRC-05739, "Update to Notification Letter Designating Callaway Nuclear Plant Unit 1 Station Balance-of-Plant Systems within the Cyber Security Rule Scope," LDCN 10-0022, dated November 29, 2010.

Enclosures 1, 2, and 3 to this letter contain sensitive information.

Withhold from public disclosure under 10 CFR 2.390.

Upon removal of Enclosures 1, 2, and 3, this letter is uncontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05790 June 14, 2011 Page 2 By letter dated August 12,2010 (Reference 2), Union Electric Company (dba Ameren Missouri) resubmitted a request for amendment of the facility Operating License for Callaway, including a request for approval of Callaway's proposed Cyber Security Plan (CSP). By subsequent letter dated September 27,2010 (Reference 3), Ameren Missouri responded to the Federal Energy Regulatory Commission (FERC) Order to clarify "balance-of-plant" systems, structures, and components (SSCs) in the Callaway CSP. In that letter, Ameren Missouri stated that the revised Callaway CSP would be submitted to the NRC on or before November 30,2010, consistent with the North America Electric Reliability Corporation's (NERC' s) expectation.

The intended submittal schedule was subsequently changed, however, due to an e-mail letter issued from NERC in November 2010 (Reference 1) in which NERC acknowledged the effort being undertaken by the NRC to address the issue of regulatory jurisdiction over continuity-of-power, balance-of-plant SSCs. In the letter, NERC acknowledged that licensees would provide their updated CSPs in accordance with a schedule determined by the NRC.

In response to the NRC's current expectation for licensees to submit their revised CSPs, Ameren Missouri is hereby providing the updated/revised CSP for Callaway as Enclosure 1 to this letter.

Along with the revised CSP, an updated implementation schedule (table) is provided as Enclosure 2, and an updated summary of deviations (also a table) is provided as Enclosure 3.

This letter does not contain new commitments.

Should you have any questions concerning this letter, or require additional information, please contact Scott Maglio at (573) 676-8719.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

(P I J +/11

--~Y,~~~-----

Enclosures:

Sincerely, Stephanie P. Banker Manager, Protective Services - Cyber Security Plan for Ameren Missouri (Union Electric Company) Callaway Plant Unit 1 - Cyber Security Plan Implementation Schedule - Summary of Deviations from NEI 08-09, Revision 6 ULNRC-05790 June 14, 2011 Page 2 By letter dated August 12,2010 (Reference 2), Union Electric Company (dba Ameren Missouri) resubmitted a request for amendment of the facility Operating License for Callaway, including a request for approval of Callaway's proposed Cyber Security Plan (CSP). By subsequent letter dated September 27,2010 (Reference 3), Ameren Missouri responded to the Federal Energy Regulatory Commission (FERC) Order to clarify "balance-of-plant" systems, structures, and components (SSCs) in the Callaway CSP. In that letter, Ameren Missouri stated that the revised Callaway CSP would be submitted to the NRC on or before November 30,2010, consistent with the North America Electric Reliability Corporation's (NERC' s) expectation.

The intended submittal schedule was subsequently changed, however, due to an e-mail letter issued from NERC in November 2010 (Reference 1) in which NERC acknowledged the effort being undertaken by the NRC to address the issue of regulatory jurisdiction over continuity-of-power, balance-of-plant SSCs. In the letter, NERC acknowledged that licensees would provide their updated CSPs in accordance with a schedule determined by the NRC.

In response to the NRC's current expectation for licensees to submit their revised CSPs, Ameren Missouri is hereby providing the updated/revised CSP for Callaway as Enclosure 1 to this letter.

Along with the revised CSP, an updated implementation schedule (table) is provided as Enclosure 2, and an updated summary of deviations (also a table) is provided as Enclosure 3.

This letter does not contain new commitments.

Should you have any questions concerning this letter, or require additional information, please contact Scott Maglio at (573) 676-8719.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

(P I J +/11

--~Y,~~~-----

Enclosures:

Sincerely, Stephanie P. Banker Manager, Protective Services - Cyber Security Plan for Ameren Missouri (Union Electric Company) Callaway Plant Unit 1 - Cyber Security Plan Implementation Schedule - Summary of Deviations from NEI 08-09, Revision 6

ULNRC-05790 June 14, 2011 Page 3 cc:

(copy w/out Enclosures 1, 2, and 3 except as noted with asterisk*)

u.s. Nuclear Regulatory Commission (Original and 1 copy)*

Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins, Jr.

  • Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U. S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*

Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B1A Washington, DC 20555-2738

ULNRC-05790 June 14, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

(electronic copy w/out Enclosures 1, 2, and 3)

A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. A. Maglio S. L. Gallagher T. L. Woodward (NSRB)

L. M. Belsky (NSRB)

T. B. Elwood Ms. Diane M. Hooper (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Mr. Dru Buntin (DNR)