ML110830634
| ML110830634 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/22/2011 |
| From: | Werner G E NRC/RGN-IV/DRS/PSB-2 |
| To: | Schwarz C J Entergy Operations |
| References | |
| IR-11-404 | |
| Download: ML110830634 (4) | |
See also: IR 05000313/2011404
Text
" " March 22, 2011 Christopher J. Schwarz, Site Vice President Arkansas Nuclear One Entergy Operations, Inc. 1448 SR 333 Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000313/2011404 AND 05000368/2011404
Dear Mr. Schwarz:
On March 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Arkansas Nuclear One facility. The inspection covered a key attribute of the Security Cornerstone of the NRC's Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on March 11, 2011, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the Entergy Operations, Inc. - 2 enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/
Gregory E. Werner, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-313; 50-368 License Nos.: DPR-51; NPF-6 Nonpublic
Enclosure:
NRC Inspection Report 05000313/2011404; 05000368/2011404
w/Attachment:
Supplemental Information cc w/enclosure: Bryan Lovin Manager, Security Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 cc w/o enclosure:
Senior Vice President & Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. - 3 Thomas Palmisano Vice President, Oversight Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995 Mark Giles Acting Manager, Licensing Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Dale E. James Director, Nuclear Safety Assurance Entergy Nuclear Operations Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802-0967 Joseph A. Aluise Associate General Counsel - Nuclear Entergy Services, Inc 639 Loyola Avenue New Orleans, LA 70113 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. - 4 Distribution w/enclosure: Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) Resident Inspector (Jeff.Rotton@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) Project Engineer (Jim.Melfi@nrc.gov) Resident Inspector (William.Schaup@nrc.gov) ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Kaly.Kalyanam@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource OEDO RIV Coordinator (Nathan.Sanfilippo@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov) Report:
SUNSI Review Completed: DCG ADAMS: Yes G No Initials: DCG G Publicly Available G Non-Sensitive Non-Publicly Available Sensitive Letter Only: SUNSI Review Completed: DCG ADAMS: Yes G No Initials: DCG Publicly Available Non-Sensitive G Non-Publicly Available G Sensitive PSB2 PSB2 C:PSB2 C:DRP/ C:PSB2 DCGraves LCCarson GEWerner JAClark GEWerner /RA/ /RA//RA//RA//RA/ 3/21/11 3/17/11 3/22/11 3/22/11 3/22/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax