ML110691142
Jump to navigation
Jump to search
| ML110691142 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Indian Point, Wolf Creek, Oyster Creek, Crane |
| Issue date: | 11/06/2009 |
| From: | Lain P NRC/NRR/DRA/AFPB |
| To: | Boatright A NRC/NRR/DRA |
| References | |
| FOIA/PA-2011-0069 | |
| Download: ML110691142 (2) | |
Text
From:
To:
Cc:
Subject:
Date:
Importance:
Loatin, Paleem I Ua
- Aleem, Alex has requested you update the DRA action list file on the G drive prior to Monday morning's DRA meeting.
Take a look at my list of AFPB actions, then Dan's list below. Remove actions from the list that are marked complete.
Paul
- 1. Follow up on paperwork for >1 M$ contract for Jxxxx to PMDA (bulk of non-pilot LAR reviews) to obtain comments
- 2. Task 1 - Issue Revised Reg Guide 1.205 and SRP for NFPA 805
- i. ACRS Reliability & PRA Subcommittee November 13th, 2009 ii. Full Committee in December 3, 4, or 5, 2009.
- 3. Task 1 - Complete FAQ Clarification of NUREG/CR-6850 -
- i. 7 of 9 closed, ii. one, closure memo in concurrence (Incipient Detection) and iii. the other the staff is addressing comments (Hot Short Duration)
- 4. Brief the Commission on fire protection issues and status - Complete
- 5. Issue Pilot Plant SER (Oconee) - due date changed to 6/30/2009 From: Frumkin, Daniel 1 A Sent: Friday, November 06,%2U09 2:41 PM To: Boatright, Aleem Cc: Lain, Paul; Klein, Alex; Metzger, Brian
Subject:
RE: DRA Action List Status - see below, From: Lain, Paul X'x_.*
Sent: Friday, November 06, 2009 11:15 AM To: Frumkin, Daniel
Subject:
DRA Action List
- Dan, These topic are on the DRA action list:
- 1. ET Significant Topic Meeting re: Jurisdictional decision in Brodsky lawsuit -- Indian Point fire-protection exemption - COMPLETE
- 2. Task 3 - Issue Final Regulatory Guide for Fire Induced Circuit Failures -
COMPLETE
- 3. Task 3 - Establish Mechanism to Validate Circuit Issue Disposition Method -
PLANNING STAGES
COMPLETE
- 9. Complete Draft IN 2009-XX-Potential Failure of Fire Water Supply Pumps to Automatically Start Due to a Fire - WITH DPR No DRA ACTIONS REMAIN
- 10. Complete Draft IN 2009-XX-Failure to Ensure Step Contained in Emergency Procedures - HAVE ASKED DPR FOR MORE TIME TO ALLOW INCORPORATION OF ADDITIONAL INFORMATION
- 12. Issue memorandum to the regions providing guidance on application of multiple fire protection enforcement discretion policies - ONGOING - INSPECTION ACTIVITY AT BROWNS FERRY IS IMPACTING THIS ACTIVITY I've been tasked to update the status, any progress?
Paul Paul W. Lain, P.E.
Senior Fire Protection Engineer 301-415-2346 Paul.Lain~nrc.gov