T. PRESTON GILLESPIE, Jr.
Duker Vice President
- Energy, Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.
Seneca, SC 29672 864-873-4478 864-873-4208 fax T. Gillespie@duke-energy. com February 2, 2011 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Site, Units 1, 2, and 3 Renewed Operating Licenses: DPR-38, 47, and 55 Docket Numbers: 50-269, 270, and 287 Re-registration for Use of General License Spent Fuel Cask Number 116 The purpose of this letter is to correct a date error in the original January 6, 2011, 30-day notification letter for General License Spent fuel Cask Number 116. Specifically, this letter stated that the storage occurred on Friday December 10, 2010, when in actuality, the storage occurred on Saturday December 11, 2010; consequently, this letter corrects the date and replaces the earlier letter sent to the NRC.
As such, in accordance with 10CFR72.212 (b)(1)(ii), Duke Energy Carolinas, LLC (Duke Energy), hereby notifies the Commission of storage of dry fuel under Cask Certificate of Compliance 72-1004, Amendment 9. The date of storage was December 11, 2010, and the cask load number was 116. The cask model is the Standardized NUHOMS 24PHB and the dry storage canister identification number is ONS-24PHBL-HZ1 16. The physical storage location at Oconee Nuclear Station's Independent Spent Fuel Storage Installation is Module W-64.
If there are any questions regarding this registration, please contact Stephen C. Newman, Oconee Regulatory Compliance Lead Engineer, at (864) 873-4388.
Sincerely, T. Preston Gillespie, Jr.
Vice President, Oconee Nuclear Station www. duke-energy. com
V U. S. Nuclear Regulatory Commission February 2, 2011 Page 2 cc:
Mr. Michael F. Weber, Director Office of Nuclear Material Safety and Safeguards Mailstop: EBB1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John M. Goshen, Project Manager Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Mailstop: E3 D2M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John Stang, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 8 G9A Washington, D. C. 20555 Mr. Cecil A. Fletcher Senior Fuel Facility Inspector USNRC, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Robert P. Carrion Senior Fuel Facility Inspector USNRC, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Luis A. Reyes USNRC - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station