ML102940101
| ML102940101 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/24/2010 |
| From: | Giles E Public Service Enterprise Group |
| To: | O'Hara T Division of Nuclear Materials Safety I |
| References | |
| FOIA/PA-2010-0334 | |
| Download: ML102940101 (3) | |
Text
OHara, Timothy From:
Giles, Edley [Edley.Giles@pseg.com]
Sent:
Monday, May 24, 2010 5:15 PM To:
OHara, Timothy Cc:
Colville, Kerry A.; Berrick, Howard G.
Subject:
RE: Salem ISI Program Dates Requested information; (1) Beginning and ending dates for Saiem Unit 1 second interval?
2127/1988 -511912001 (2) Beginning and ending dates for Salem Unit 2 second interval?
5/10/1992 -11/2712003 (3) Which periods within the Salem Unit 1 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?
Unit 1 2"nd Interval period dates I't Period [2127/1988 -412611991]
Outages IR8 (312811989-6118/1989) & 1R9 (212/1991 -412611991)
No IWA-5422 testing on buried piping performed 2'd Period [4/27/1991 -411711998]
Outages IR10 (4/4/1992 - 8117/1992), 1RII (10/2/1993 - 212/1994) &
SRI 2 (4/7/1995 - 4/17/1998)*** No IWA-5422 testing on buried piping performed 3V Period [4/18/1998-511912001] Outages 1R13 (9/1711999-10/26/1999) & IR14 (4)6/2001 -5/1912001)
No IWA-5422 testing on buried pip"in performed
- extended shutdown (4) Which periods within the Salem Unit 2 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?
Unit 2 2nd Interval period dates 1t Period [5/10/1992 - 5/1011995]
Outages 2R7 (3/17/1993 - 713/1993)& 2R8 (10/15/1994-2/1611995)
No IWA-5422 testing on buried piping performed 2 "d Period [5/11/1995 - 11/15/2000] Outages 2R9 (6/8/1995 - 8129/1997)***, 2R1 0 (413/1999 - 5/28/1999) &
2R111 (10/612000- 11/1512000) No IWA-5422 testing on buried piping performed 3V Period [11/16/2000 - 11/27/2003]Outages 2R12 (4/512002 -,5/1712002) & 2R13 (10/9/2003-11/27/2003)
No IWA-5422 testing on buried piping performed extended shutdown (5) Were the required tests performed on Unit 2 during the first interval?
- Yes; The ten-year hydro Pressure Drop Test technique used on Unit I during the 1t Interval was also used for Unit 2 1 st interval ten-year hydro, Have Pressure Test datasheet dated 319/1992 for Line to 22SG only (*have not found datasheet for line to 24SG yet).
- Have not found evidence that the required periodic pressure test were performed during the Ist intervals Ist and 2 nd periods as required by 74' edition 75' summer addenda, IWA-5440, IWD-2400 &
IWD-2600(b), still looking.
(6) What are the interval and period dates for interval 3? Have the tests been missed for interval 3 for Salem Unit 1 or 2?
3rd Intervals Unit 1 5/1912001 - 5/19/2011 1 st Period [5/19/2001 - 6/312004]
Outages IR15 (10/10/2002 - 11/0612002) & 1R16 (3/26/2004 -
613/2004) No IWA-5422 testing on buried piping performed h bmn aufon in this record wa s de Le.
i PMOIev
- r2rndPeriod [6/412004 - 512012008]
Outages IR17 (1011112005 -111612005) & IR18 (3127/2007 -
4/20/2007) No IWA-5422 testing on buried piping performed 3 rd Period [5121/2008-5/1912011] Outages 1R19 (10/1412008 -11/1112008) & 1R20 (4/3/2010-412312010) Pressure test on buried pipingt during replacement activities 1R20 Unit 2 11/27/2003 - 11/27/2013 1'st Period [11127/2003 - 11126/2006]Outages 2R14 (5/4/2005 - 5/11/2005) & 2R15 (10/10/2006 - 11/112006)
No IWA-5422 testing on buried piping Derformed 2 "r Period [11/27/2006 - 11/26/201 0]Outages 2R1 6 (3/11/2008 - 5/8/2008) & 2R1 7 (10/13/2009 -
11/11/2009) No IWA-5422 testing on buried piping performed YET!
3 rV Period [1112712010 - 11/2712013]Outages 2R1 8 (scheduled spring 2011) & 2R19 (scheduled fall 2012)
- Regards, Tim Giles From: OHara, Timothy [1]
Sent: Monday, May 24, 2010 2:19 PM To: Giles, Edley Cc: Colville, Kerry A.; Berrick, Howard G.
Subject:
Salem ISI Program Dates Hello Tim, Can you please provide the following information:
(1) Beginning and ending dates for Salem Unit 1 second interval?
(2) Beginning and ending dates for Salem Unit 2 second interval?
(3) Which periods within the Salem Unit 1 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?
(4) Which periods within the Salem Unit 2 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?
(5) Were the required tests performed on Unit 2 during the first interval?
(6) What are the interval and period dates for interval 3? Have the tests been missed for interval 3 for Salem Unit 1 or 2?
A reply via email is fine. If a phone call would be better let me know and we can do that also. Thanks.
Tim OHara 2
I CoPt/ itt