E-Mail from Conte to Alley, Followup Question
ML102940090
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/03/2010
From: Conte R
Division of Nuclear Materials Safety I
To: David Alley
Office of Nuclear Reactor Regulation
References
FOIA/PA-2010-0334
Download: ML102940090 (1)


Text

Caponiti, Kathleen From:

Conte, Richard.A Sent:

Monday, May Oil*,,', 4:'06 PM To:

Alley, David

Subject:

Followup Question The downrate in pressure to 1275 was to support a new min wall thickness. The tech eval says they never exceeded that pressure during system operations. I can give you details later. It was mostly done in conjunction with the Finite Element Analysis to support past operability on unit 1.

They are also reasoning that if the information they have on Unit 2 supports that coating was installed (albeit limited information), then Unit 2 can't be worse off than Unit 1; and, if Unit 1 piping has structural integrity of the pipe, then so does Unit 2.