ML102910687
Jump to navigation
Jump to search
| ML102910687 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/14/2009 |
| From: | Mark Franke NRC/RGN-II/DRS/EB3 |
| To: | Lake L NRC/RGN-II/DRS/EB3 |
| References | |
| FOIA/PA-2010-0116 | |
| Download: ML102910687 (2) | |
Text
Sengupta, Abhi lit From:
Sent:
To:
Subject:
Attachments:
Franke, Mark Monday, December 14, 2009 7:42 AM Lake, Louis FW: CR3 Root Cause Information 2009 Dec 11 - Root Cause Update for NRC.pptx 1P"l--
From: McCabe, Brian [mailto: Brian.McCabe@pgnmail.com]
Sent: Monday, December 14, 2009 7:29 AM To: Sykes, Marvin; Franke, Mark; Wert, Leonard; Kennedy, Kriss; Saba, Farideh; Orf, Tracy
Subject:
CR3 Root Cause Information As we discussed last Thursday, the root cause investigative work (not the report) is scheduled to be completed by 12/28.
Brian 11q
I Root Cause Analysis - Po Metrics as of Decf t
th2009 4&.
Open Failure Modes (yet to be supported or refuted) 19 0
80 70 60 50 40 30 20 10 0
Rm E, I ~
El IEmIl 011E 0
000 0
1
- (1) Inadequate Concrete Design due to High Local Stress 0
Progress Energy