NFPA 805 Non-Pilot Workshop 9/29/2010 Potential Workshop Topics Monitoring program What is the level of detail that a licensee must submit to NRC under Oath & Affirmation about licensees NFPA 805 Monitoring Program?
Enforcement discretion Please expand upon the various enforcement discretion scenarios. For example, what can a licensee expect if they submit their LAR after their enforcement discretion period ends?
If a licensee submits their LAR more than six months after the staff issues the SER, will the licensee receive enforcement discretion during the LAR review period?
PRA peer reviews The NRC performed audits of the pilots PRAs. What level of review is the NRC expecting to do for non-pilots?
If the NRC determines that a licensees peer review was deficient, or the findings improperly resolved, what will the NRC do?
How will the issue of peer reviews of then-incomplete PRAs be addressed (for example the recent peer review at Palisades the the NRC observed)?
Safe and stable What is the NRCs position regarding this issue?
What information is required by the NRC regarding this issue?
What level of detail is required?
Acceptance review process (LIC-109)
What is the role of the NRCs acceptance review process in the NFPA 805 LAR review effort?
Will the NRC be following this process for the non-pilots?
LAR prioritization and sequencing How does the NRC intend to manage the concurrent review of 20+ NFPA 805 LARs?
Will the reviews be sequenced (as for license renewal)?
If so, what will be the criteria for prioritization?
RAI process and SharePoint technology
NFPA 805 Non-Pilot Workshop 9/29/2010 The pilot plants used SharePoint to assist the RAI process. Should the non-pilots expect to do the same?
License condition What can non-pilot licensees expect to see in their license conditions?
Will this be different from what is in the current version of Regulatory Guide 1.205?
Implementation items (post-SE)
How will implementation items be handled for the non-pilots?
How will these items be finally closed-out?
New information post-LAR-submittal How does the NRC intend to handle new information developed after a licensee has submitted their LAR?
If there is the possibility of re-work, how will this be resolved?
Bounds of self approval What are the boundaries of the post-transition self-approval process?
Are there some changes that must receive specific NRC approval?
Unanalyzed PRA methods How will the NRC handle novel or previously unanalyzed PRA methods?
Fire modeling in the fire risk evaluation performance-based approach What information needs to be submitted to the NRC regarding fire modeling when the fire risk evaluation approach?
What level of detail is required?
Design changes during the LAR review period How should potentially unrelated plant changes be addressed during the LAR review period?
How do the power uprate and license renewal processes interact with the LAR review/transition process?
PRA Model maintenance What are the regulatory expectations with respect to PRA model maintenance?
Plant changes?
Method changes?
Data changes?
What are the responsibilities of the licensee when new information leads to increases in CDF? Decreases in CDF?