UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
September 22, 2010
EA-10-185; EA-10-186; EA-10-187
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS -
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
Dear Mr. Pacilio:
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission
(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which
provide a response to our inspection report issued on August 3, 2010, concerning activities
conducted at Clinton Power Station. The three letters you sent each contested a separate
Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: 05000461/2010003-01 Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,05000461/2010003-02 Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS
Procedure 3711.01, and 05000461/2010003-04 Inadequate Emergency Plan Augmentation
Call-In Drills.
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be
thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform
you as soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief
Branch 1
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
cc: Distribution via ListServ
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
September 22, 2010
EA-10-185; EA-10-186; EA-10-187
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS -
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
Dear Mr. Pacilio:
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission
(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which
provide a response to our inspection report issued on August 3, 2010, concerning activities
conducted at Clinton Power Station. The three letters you sent each contested a separate
Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: 05000461/2010003-01 Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,05000461/2010003-02 Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS
Procedure 3711.01, and 05000461/2010003-04 Inadequate Emergency Plan Augmentation
Call-In Drills.
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be
thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform
you as soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief
Branch 1
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
cc: Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\\1-Secy\\1-Work In Progress\\Clinton Contested Violations 9-1-2010.docx
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl
"E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
E RIII
N RIII
E
NAME
MRing:cs
HPeterson
PLougheed for SOrth
DATE
09/22/10
09/22/10
09/22/10
OFFICIAL RECORD COPY
Letter to M. Pacilio from M. Ring dated September 22, 2010
SUBJECT:
ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS -
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003