1 DiabloCanyonNPEm Resource From:

Ferrer, Nathaniel Sent:

Friday, September 10, 2010 9:54 AM To:

Grebel, Terence; Soenen, Philippe R

Subject:

Draft Telecon Summaries for August 12 and August 18, 2010 Attachments:

Telecon Summary 08-12-10 RAI Response (set 5).doc; Telecon Summary 08-18-10 RAI Response (set 4).doc Terry & Philippe, Attached is a draft of the Teleconference Call Summaries for August 12 and August 18, 2010, conference calls. Please review and let me know if there are any corrections/changes needed.

Please let me know if you have any questions.

NathanielFerrer ProjectManager DivisionofLicenseRenewal OfficeofNuclearReactorRegulation U.S.NuclearRegulatoryCommission (301)4151045

Hearing Identifier:

DiabloCanyon_LicenseRenewal_NonPublic Email Number:

1151 Mail Envelope Properties (Nathaniel.Ferrer@nrc.gov20100910095400)

Subject:

Draft Telecon Summaries for August 12 and August 18, 2010 Sent Date:

9/10/2010 9:54:20 AM Received Date:

9/10/2010 9:54:00 AM From:

Ferrer, Nathaniel Created By:

Nathaniel.Ferrer@nrc.gov Recipients:

"Grebel, Terence" <TLG1@PGE.COM>

Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 447 9/10/2010 9:54:00 AM Telecon Summary 08-12-10 RAI Response (set 5).doc 100858 Telecon Summary 08-18-10 RAI Response (set 4).doc 89082 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 12, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 12, 2010, to obtain clarification on the applicants response to request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated July 19, 2010, PG&E sent the staff a response to RAI letter dated June 21, 2010, regarding structures aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the PG&Es response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on RAI responses for which the staff requested clarification. PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAIs, determined to be necessary, will be issued separately by a formal letter.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv

OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE

/ /10

/ /10

/ /10

/ /10

Memorandum to Pacific Gas and Electric Company from N. Ferrer dated August XX, 2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 12, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLICRidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck, RIV TBrown, RI GMiller, RIV NOKeefe, RIV ICouret, OPA VDricks, OPA WMaier, RIV JWeil, OCA EWilliamson, OGC SUttal, OGC RRihm, EDO

ENCLOSURE 1 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 12, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

Abdul Sheik NRC Bryce Lehman NRC Dan Naus Oak Ridge National Laboratory (ORNL)

Barry Oland ORNL Terry Grebel Pacific Gas and Electric Company (PG&E)

Philippe Soenen PG&E Gary Porter PG&E Rob OSullivan PG&E Kyle Duke PG&E

ENCLOSURE 2 Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information (Set 5)

Aging Management Programs RAI B2.1.28-1 In its July 19, 2010 response to request for additional information (RAI) B2.1.28-1, the applicant indicated that procedure nondestructive examination (NDE) VT 3C-1 has been revised.

However, the staff had the following observations:

1. The staff was unclear how the revised sections of the procedure NDE VT 3C-1 would preclude any confusion as to what is acceptable under design basis versus acceptability of continued operation by removing the third tier criteria from the procedure.

Discussion:

Pacific Gas and Electric Company (PG&E) agreed to make the revised procedure available for the staff to audit.

2. The staff was unclear if calculation 2305C, which still has discussion and evaluation for third tier criteria, would be revised.

Discussion:

The staff will issue a follow-up RAI to determine if or how calculation 2305C would be affected.

RAI B2.1.32-1 In its July 19, 2010 response to RAI B2.1.32-1, the applicant provided a comparison of Diablo Canyon Nuclear Power Plants (DCPPs) condition classification categories with ACI 349.3R evaluation criteria. However, the staff was unclear as to whether DCPPs condition classification involved any quantitative criteria, or whether it was all qualitative and based on the judgment of the responsible engineer.

Discussion:

The staff will issue a follow-up RAI to clarify whether quantitative criteria are used in the condition classifications.

RAI B2.1.32-2 In its July 19, 2010 response to RAI B2.1.32-2, the applicant indicated they have a ten year frequency of inspection of structures. The applicant states that DCPP procedures consider the guidance of ACI 349.3R-96 and establish frequencies based on aggressiveness of environmental conditions and physical conditions of the plant structures. However, the staff is unclear how guidance provided in Table 6.1 of ACI 349.3R has been used in developing the frequency of inspection of structures.

Discussion:

The staff will issue a follow-up RAI to clarify how the applicant developed the inspection frequency of structures.

RAI B2.1.32-4 In its July 19, 2010 response to RAI B2.1.32-4, the applicant provided details of the minor leak from the Unit 2 spent fuel pool and associated inspections and analyses. However, the staff made the following observations:

1. The staff was unclear if the frequency for analyses of the water collected from the leak chase channels and any criteria for evaluation or acceptance would be continued in the period of extended operation. In addition, the staff was unclear if any future video inspections of the leak chase channels would be conducted.

Discussion:

PG&E agreed to supplement the response to RAI B2.1.32-4 to clarify this portion of the RAI.

2. The staff was unclear if the leakage from Unit 2 spent fuel pool is contained within the leak chase system, and no leakage has ever been observed through the walls or floors of the spent fuel spent fuel pool.

Discussion:

The applicant confirmed that no leakage has ever been observed through the walls or floors of the spent fuel pool. Based on the discussion, this portion of the response is clear.

3. The staff is unclear why there is leakage from Unit 1 spent fuel pool during outages only, and increase in leakage from Unit 2 spent fuel pool during outages.

Discussion:

The staff will issue a follow-up RAI to address the increased spent fuel pool leakage during outages.

RAI B2.1.33-1 In its July 19, 2010 response to RAI B2.1.33-1, the applicant summarized the details of the intake structure refurbishment program. However, the staff had the following observations:

1. The staff was not clear on the applicants future inspection plan and frequency after refurbishment of the intake structure.

Discussion:

The staff will issue a follow-up RAI for clarification on the inspection frequency to be used during the period of extended operation on water-control structures.

2. The staff was unclear if applicant had any engineering evaluation which documented the degradation of the intake structure and corrective actions and if the engineering evaluation been documented in a calculation or report.

Discussion:

PG&E agreed to make the applicable engineering evaluations available for the staff to audit.

RAI B2.1.33-2 In its July 19, 2010 response to RAI B2.1.33-2, the applicant described the history and repairs on the discharge structure. However, the staff noted that the applicant states that DCPP procedures require inspection on refueling cycle interval. In addition, the applicant has stated that the discharge structure was partially inspected in 1991 and 1999. The staff is unclear if any inspections have been performed on interior surfaces of the discharge structure since 1999.

The applicants aging management program for water-control structures states that inspections are implemented in accordance with the guidance in RG 1.127. However, RG 1.127 requires an inspection frequency of five years.

Discussion:

The staff will issue a follow-up RAI in conjunction with follow-up RAI B2.1.33-1 for clarification on the inspection frequency to be used during the period of extended operation on water-control structures.

RAI B2.1.33-3 In its July 19, 2010 response to RAI B2.1.33-3, the applicant described the history and inspection techniques for the discharge circulating water conduits (DCWC). However, the staff made the following observations:

1. The staff noted that the response indicated that the DCWCs were last inspected in May 2002 Unit 1 outage and May 2001 Unit 2 outage. RG 1.127 requires water-control structures to be inspected every five years. The staff is unclear of the current inspection frequency and the inspection frequency of the DCWC for the period of extended operation.

Discussion:

The staff will issue a follow-up RAI in conjunction with follow-up RAI B2.1.33-1 to clarify the inspection frequency on water-control structures.

2. The staff noted that the applicant states that submerged structures, systems, and components that are continuously under water should be inspected every planned refueling outage; however, discretion on inspection frequency is left up to the system engineer so long as it does not exceed ten years. The staff is unclear how the ten year inspection frequency is justified.

Discussion:

The staff will issue a follow-up RAI in conjunction with follow-up RAI B2.1.33-1 to clarify the inspection frequency on water-control structures.

3. The staff was unclear from the response, which portions of the discharge structures are inaccessible for inspection due to marine growth. It is also unclear how frequently the marine growth is removed, and when it is removed, what portion of the inaccessible area is made accessible.

Discussion:

The staff will issue a follow-up RAI for clarification on the inspection technique and methodology for portions of the discharge conduit that are inaccessible due to marine growth.

LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicants response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated July 7, 2010, PG&E sent the staff a response to RAI letter dated June 14, 2010, regarding structures aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the PG&Es response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on RAI responses for which the staff requested clarification. PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAIs, determined to be necessary, will be issued separately by a formal letter.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv

OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE

/ /10

/ /10

/ /10

/ /10

Memorandum to Pacific Gas and Electric Company from N. Ferrer dated August XX, 2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLICRidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck, RIV TBrown, RI GMiller, RIV NOKeefe, RIV ICouret, OPA VDricks, OPA WMaier, RIV JWeil, OCA EWilliamson, OGC SUttal, OGC RRihm, EDO

ENCLOSURE 1 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 18, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

Bart Fu NRC Jim Gavula NRC Dwight Diercks Argonne National Laboratory Philippe Soenen Pacific Gas and Electric Company (PG&E)

James Hill PG&E Chris Beard PG&E Dan Gibbons PG&E Al Saunders Strategic Teaming And Resource Sharing (STARS)

David Kunsemiller STARS Rye Davis STARS

ENCLOSURE 2 Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information (Set 4)

Aging Management Programs RAI B2.1.16-2 In its July 7, 2010 response to request for additional information (RAI) B2.1.16-2, the applicant described the details of the One-Time Inspection Program inspection techniques. However, the staff was not clear if the scope of the program has been defined to include eddy current testing of heat exchanger tubes in an environment comparable to the non-regenerative heat exchangers.

Discussion:

Pacific Gas & Electric Company agreed to supplement the response to RAI B2.1.16-2 RAI B2.1.19-2 In its July 7, 2010 response to RAI B2.1.19-2, the applicant provided justification for the use of the ASME Code Class 1 Small-Bore Piping Program. However, the staff was unclear of the full history of failures in Class 1 small-bore piping. The staff was also unclear about the sampling size and methodology of the program.

Discussion:

The staff will issue a follow-up RAI to clarify the relevant plant-specific operating experience and the programs sampling size and methodology.