ML102030266

From kanterella
Jump to navigation Jump to search
G20100460/LTR-10-0335/EDATS: SECY-2010-0378 - Ltr Fm Rep. Lois Capps & Bob Filner Seismic Issues Surrounding Diablo Canyon Nuclear Power Plant
ML102030266
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/19/2010
From: Capps L, Filner B
US Congress, US HR (House of Representatives)
To: Jaczko G
NRC/Chairman
rihm R, 415-1717
Shared Package
ML102210203 List:
References
CORR-10-0073, G20100460, LTR-10-0335, SECY-2010-0378
Download: ML102030266 (5)


Text

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jul 21, 2010 10:11 PAPER NUMBER:

ACTION OFFICE:

LTR-10-0335 EDO LOGGING DATE: 07/21/2010 AUTHOR:

AFFILIATION:

ADDRESSEE:

SUBJECT:

ACTION:

DISTRIBUTION:

LETTER DATE:

ACKNOWLEDGED SPECIAL HANDLING:

REP Lois Capps CONG Gregory Jaczko Seismic issues surrounding the Diablo Canyon nuclear power plant Signature of Chairman RF, OCA to.Ack 07/19/2010 No Commission Correspondence NOTES:

'FILE LOCATION:

ADAMS 08/1 1/2010 DATE DUE:

DATE SIGNED:

EDO -- G20100460

Tongress of t!l Uiteib *tates lIv hington, BT 20515 July 19, 2010 The Honorable Gregory B. Jaczko Chairman U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, DC 20555-0001

Dear Chairman Jaczko:

We are writing to make you aware of efforts underway in our state to gather and analyze the most current data on the seismic issues surrounding the Diablo Canyon Nuclear Power Plant (DCNPP). We are also concerned with the NRC's evaluation of a newly discovered earthquake fault offshore of DCNPP that is based on a preliminary report that uses information gathered in the past.

Our state regulatory agencies have a responsibility for maintaining both the reliability and economic viability of California's energy planning strategies, along with concerns for protection of health, safety and security. Moreover, the legislature has mandated that a new, updated seismic study using advanced methods be undertaken for the DCNPP area, and has made completion of these studies in a timely fashion a requirement for any state processes that affect relicensing of the DCNPP.

We specifically ask the NRC to collaborate with our state's regulatory agencies and create a joint panel to review-upon their completion-the seismic studies requested of the utility by our state regulators and legislature. In recent years, the California Energy Commission (CEC) has facilitated similar panels when deliberating on energy planning and nuclear policy issues, which also included participation of federal agencies such at the NRC and the U.S. Department of Energy. To assist with their most recent seismic vulnerability assessment, the CEC formed a Seismic Vulnerability Advisory Team made up of seismic safety experts from California's Seismic Safety Commission, California Geological Survey, and the California Coastal Commission. It is likely that a similar team could be assembled for the proposed joint review panel.

The CEC, the California Public Utilities Commission and the California Coastal Commission have all filed comments in the DCNPP license renewal proceedings, indicating that many seismic uncertainties remain unstudied and unresolved. The urgency of resolving the state's seismic concerns necessitates the formation of a joint PRINTED ON RECYCLED PAPER

review panel made up of experts and we urge the NRC to take immediate steps to ensure it has the tools and resources it needs.

Thank you for your attention to this request.

Sincerely, LOIS CAPPS Member of Congress MR