ML100360743
| ML100360743 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 02/16/2010 |
| From: | Boska J Plant Licensing Branch 1 |
| To: | Entergy Nuclear Operations |
| Boska J, NRR, 301-415-2901 | |
| References | |
| TAC ME2869 | |
| Download: ML100360743 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 1h, 2010 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO.3 - LICENSE AMENDMENT REQUEST ON AC AND DC SOURCES ACCEPTED FOR REVIEW (TAC NO. ME2869)
Dear Sir or Madam:
By letter dated November 19, 2009, Agencywide Documents Access and Management System Accession No. ML093360509, as supplemented by letter dated January 28, 2010, Entergy Nuclear Operations, Inc. (Entergy) submitted a license amendment request for Indian Point Nuclear Generating Unit NO.3 (IP3). The proposed amendment would revise the acceptance criteria for the endurance test for the Emergency Diesel Generators (EDGs) and revise notes associated with Surveillance Requirements (SRs) for the direct current (DC) systems. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the Technical Specifications (TSs)) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to commence its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
- 2 Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely,
~oC::s~Manager 2t:~t ~ic:'nSing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv
- 2 Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely, IRA!
John P. Boska, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1-1 RidsNrrPMlndianPoint RidsOGCRp LPL1-1 Reading File RidsNrrLASLittie RidsAcrsAcnw_MailCTR MMcConnell RidsN rrDorlDpr RidsRgn1 MailCenter RidsNrrDeEeeb ADAMS ACCESSION NO'.. ML1000360743
- Via email OFFICE LPL 1-1/PM LPL 1-1/LA EEEB*
LPL 1-1/BC NAME
~IBoska SLittie MMcConnell RGuzman for NSalgado DATE 2/16/10 2/16/10 2/4/10 2/16/10 OFFICIAL RECORD COPY