Letter Sequence Request |
|---|
TAC:ME1081, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEAR05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0108, License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions2009-10-0909 October 2009 License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions Project stage: Request ML0928005432009-10-19019 October 2009 Nonacceptance with the Opportunity to Supplement Letter for Extended Power Uprate Project stage: Other ML0929305162009-10-22022 October 2009 Request for Additional Information from Mechanical and Civil Engineering Branch Auxiliary Feedwater Modification Project stage: RAI ML0929308342009-10-22022 October 2009 Request for Additional Information from Balance of Plant Branch Auxiliary Feedwater Modification Project stage: RAI ML0929201272009-10-28028 October 2009 Summary of Meeting with FPL Energy Point Beach, LLC on the Auxiliary Feedwater Modification Amendment Project stage: Meeting ML0930205422009-11-0404 November 2009 Acceptance Review of Requested Licensing Action Regarding Extended Power Uprate Project stage: Acceptance Review ML0930603312009-11-0505 November 2009 Request for Additional Information from Technical Specification Branch Non-conservative Setpoint Changes (TAC Nos. ME1083 & ME1084) Project stage: RAI ML0930603012009-11-0606 November 2009 Request for Additional Information from Technical Specifications Branch Regarding Auxiliary Feedwater Project stage: RAI NRC 2009-0114, Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study2009-11-13013 November 2009 Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study Project stage: Request ML0931402312009-11-16016 November 2009 Request for Additional Information from Balance of Plant Branch Regarding Main Feedwater Isolation Valves Project stage: RAI NRC 2009-0125, License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System2009-11-20020 November 2009 License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System Project stage: Response to RAI NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint2009-11-20020 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0932400282009-11-24024 November 2009 Request for Additional Information from Reactor Systems Branch Regarding Extended Power Uprate Project stage: RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0935002032009-12-22022 December 2009 Request for Additional Information from Reactor Systems Branch EPU Expedited Portions Project stage: RAI NRC 2010-0003, License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information2010-01-0808 January 2010 License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information Project stage: Request ML1000800812010-01-13013 January 2010 Request for Additional Information from Balance of Plant Branch Extended Power Uprate Project stage: RAI NRC 2010-0005, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-01-13013 January 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI ML1002500112010-01-22022 January 2010 Response Request for Additional Information License Amendment Request 261 Extended Power Uprate Project stage: Request NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request ML1001203312010-02-0101 February 2010 Request for Additional Information from Electrical Engineering Branch Auxiliary Feedwater - Round 2 Project stage: RAI NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1006803682010-03-10010 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss the Alternative Source Term, Auxiliary Feedwater, and Extended Power Uprate Amendments Project stage: Meeting ML1007806102010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007506852010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1008103682010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007804772010-03-31031 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI 2009-04-08
[Table View] |
Text
January 22,201 0 ENERGY@
POINT BEACH 7
NRC 201 0-0009 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units I and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 261 Extended Power U~rate Res~onse to Request for Additional Information
References:
(I)
FPL Energy Point Beach, LLC letter to NRC, dated April 7, 2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
(2)
NRC letter to NextEra Energy Point Beach, LLC, dated December 22, 2009, Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional lnformation from Reactor Systems Branch RE: Extended Power Uprate (TAC Nos. ME1 044 and ME1 045) (ML093500203)
(3)
NextEra Energy Point Beach, LLC letter to NRC, dated January 13,201 0, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional lnformation (MLl00140163)
NextEra Energy Point Beach, LLC (NextEra) submitted License Amendment Request (LAR) 261 (Reference 1) to the NRC pursuant to 10 CFR 50.90. The proposed amendment would increase each unit's licensed thermal power level from 1540 megawatts thermal (MWt) to 1800 MWt, and revise the Technical Specifications (TS) to support operation at the increased thermal power level.
The NRC staff determined that additional information was required (Reference 2). MextEra provided responses to these questions in Reference (3), with the exception of Question 2.8.5.2-2. The NRC and NextEra agreed on January 8, 2010, that this question would be responded to via separate correspondence no later than January 22,201 0. Enclosure 1 provides the NextEra response to Question 2.8.5.2-2 of Reference (2).
This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 The information contained in this letter does not alter the no significant hazards consideration contained in Reference (1) and continues to satisfy the criteria of 10 CFR 51.22 for categorical exclusion from the requirements of an environmental assessment.
In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 22,201 0.
Very truly yours, NextEra Energy Point Beach, LLC sitemvice-President Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW
ENCLOSURE 1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 261 EXTENDED POWER UPRATE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION The NRC staff determined that additional information was required (Reference 1) to enable the Reactor Systems Branch to continue its review of License Amendment Request (LAR) 261, Extended Power Uprate (EPU) (Reference 2). The following information is provided by NextEra Energy Point Beach, LLC (NextEra) in response to Question 2.8.5.2-2 from Reference (1).
Question 2.8.5.2-2 Please explain the assumptions regarding auxiliary feedwater (AFW) flow: The AFW flow was initiated 30 seconds after the low-low steam generator water level setpoint was reached; from 30 to 60 seconds, the AFW flowrate ramped from 0 percent to 80 percent of total flow; from 60 to 120 seconds, the AFW flowrate ramped from 80 percent to 100 percent of total flow; beyond 120 seconds, 100 percent of total flow (275 gpm) was maintained.
NextEra Response The auxiliary feedwater ( A M ) flow to the steam generators (SGs) noted above, and included in LAR 261, present a conservative representation of the motor-driven auxiliary feedwater (MDAFW) pump delivered flow when operated in automatic. The flow from the MDAFW pump to each SG will be controlled by a flow control valve. The turbine-driven auxiliary feedwater (TDAFW) pump starts and discharges through a normally throttled discharge valve to each SG.
The TDAFW flow response is not dependent on a flow controller. The flow from the MDAFW pump is more limiting than flow from the TDAFW pump from a minimum delivered flow standpoint. The assumptions regarding AFW flow are based on a conservative representation of a flow control valve response in automatic. The table below provides a summary of the limiting MDAFW flow assumptions as noted in Reference (2), the basis for those assumptions and the expected response.
Page 1 of 2
References:
(1)
NRC letter to NextEra Energy Point Beach, LLC, dated December 22,2009, Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information from Reactor Systems Branch RE: Extended Power Uprate (TAC Nos. ME1 044 and ME1 045) (ML093500203)
EXPECTEDRESPONSE Pump starts and control valves (discharge and recirculation) will begin to stroke well within 30 seconds.
Control valves will near correct positioning and near full flow will be delivered from the pump.
Near stable full pump flow delivered to the SGs.
Stable operation with full pump flow delivered to the SGs.
ASSUMPTION 0-30 seconds - 0 gpm 30-60 seconds - Ramp from 0 to 80% flow 60 to 120 seconds -
Ramp from 80 to 100%
flow Beyond 120 seconds -
1 00% flow (2)
FPL Energy Point Beach, LLC letter to NRC, dated April 7, 2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
BASIS FOR ASSUMPTION Accommodates time delay for pump start signal after SG water level reaches low-low level AFW start setpoint.
Accommodates time for pump to reach full speed.
Accommodates time for the discharge flow control valves to SGs to reach the near correct throttle position and recirculation valves to close.
Accommodates time for the pump to reach 100% of flow control set point.
Stable pump flow above the minimum value.