ML093560228

From kanterella
Jump to navigation Jump to search
Acceptability Review, Part 73, Exemption
ML093560228
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/15/2009
From: Farideh Saba
NRC/NRR/ADRO
To: David M, Mccabe B
- No Known Affiliation
Saba F, NRR/DORL/LPL2-2, 301-415-1447
References
Download: ML093560228 (2)


Text

From:

Saba, Farideh Sent:

Tuesday, December 15, 2009 10:22 AM To:

McCabe, Brian; Miller, David (Bryan)

Cc:

Herrin, Dennis W.; Wengert, Thomas; Feintuch, Karl

Subject:

Initial Review of Received Part 73 Exemptions

Brian, The 10 CFR 73.5 exemption request for Crystal River Nuclear Generating Plant, Unit 3 has been initially reviewed, by the NRC staff, for adequate technical content and appropriate documentation and has been found to contain both the technical content and documentation for further review:

Though initial reviews have been conducted, the thorough technical review of the exemption request must be conducted to arrive at a determination.

Thanks, Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV E-mail Properties Mail Envelope Properties ()

Subject:

Initial Review of Received Part 73 Exemptions Sent Date: 12/15/2009 10:16:50 AM Received Date: 12/15/2009 10:21:00 AM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:

Brian.McCabe@pgnmail.com (McCabe, Brian)

Tracking Status: None David.Miller@pgnmail.com (Miller, David (Bryan))

Tracking Status: None Dennis.Herrin@pgnmail.com (Herrin, Dennis W.)

Tracking Status: None Thomas.Wengert@nrc.gov (Wengert, Thomas)

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None

Post Office:

Files Size Date & Time MESSAGE 11124 12/15/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: True Return Notification: False Sensitivity: olNormal Recipients received: