W Summary of PU plant Dose Rate Survey No.
of Measurements Plutonium Plant Yard Inside Building Rem/hr.
Max.
Min. Avg.
6 3
5 7
4 5
98 99
Plutonium Plant Building Dose Rate Survey On October 11,1989, a dose rate survey was made in the Plutonium plant building using a low energy Bicron p Rem instrument (serial No.
A 905N) equipped with an extended detector.
The instrument was calibrated by Bicron Corporation on September 24,
- 1989, and the calibration was rechecked by Ron Fine, Cimarron, on October 3, 1989.
The dose rate measurements were taken one meter above the floor. From one to four measurements were taken in each room or area, depending upon the size of the room or area.
(see attached maps.)
Room or Area V Rem/hr.
Guard Shack 5
Foyer 5
Rm.
100/101 Front offices 5
5 6
Rm.
102 Manager's Office 6
Rm.
103 Lunch room 5
6 Rm.
104 Men's Change Room 5
6 Rm.
107 Men's Change Room Air Lock 6
Rm.
105 Women's Change Room 6
Rm.
111 Women's Change Room Air Lock 6
Rm.
106 Laundry 6
Rm.
112 Janitor's Closet 6
Rm.
108 Count Room 6
Room or AreaR
. 11 Rem/hr.
Rm.
Rm.
Rm.
Rm.
109 110 114 113 Health Physics Office Firt Aid Room Decontamination Room Corridor (H.P. Area)
Airlock Corridor (Production Area)
Corridor (Production Area) 6 6
6 6
6 6
6 6
6 6
5 Rm.
Rm.
115 125 Rm.
118 Rm.
116 Rm.
117 Maintenance Shop Boiler Room Airlock to Rm.
121 Airlock to Dock Inspection & Assembly Rm.
Rmn.
Rm.
119 120 121 5
6 6
7 6
6 4
4 6
5 5
5 6
7 5
6 6
Rm.
Rm.
122 123 X-Ray Fabrication Pellet Processing Rm.
124 6
6 6
(2)
Room or Area P Rem/hr.
Rm.
126 Rm.
127 Rm.
128 Rm.
BO-I Rm.
BO-I Vault Scrap Recovery Wet Processing Scrap Recovery Wet Processing & Waste Treatment Solvent Extraction Middle Lower Mechanical Tunnel Rm.
BO-5 4
5 4
5 5
5 4
4 4
4 5
4 4
4 4
5 5
6 6
6 6
5 5
6 5
5 6
5 6
6 5
5 Rm.
129 Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
Rm.
130 131 132 133 134 135 136 137 138 139 140 General Lab Store Room Lab. offices Gas Analysis Emission Lab. Office Metallography Dark Room Airlock Densitometer Room/Office Sample Prep.
Uranium Lab (3)
Room or Area -R/
p Rem/hr.
Rm.
140N Rm.
141 Rm.
142 Rm.
143 Uranium Lab Mass. Spec.
Sample Prep.
Mass.
Spec. Maint.
Mass.
Spec. Lab 5
5 7
5 6
6 6
4 5
5 5
5 5
5 Rm.
200 Rm.
201 Uranium Lab Corridor Fanroom Airlock Exhaust Fan Room Supply Fan Room Rm.
202 6
4 4
5 5
5 Chemcial Make-up 11 Tliýk (4+)
Plutonium Plant Yard Dose Rate Survey On October 4, 1989 a dose rate survey was made in the plutonium plant yard using a low energy Bicron Rem instrument (serial No.
A 905 N) equipped with an extended detector.
The instrument was calibrated by Bicron Corporation on September 25,
- 1989, and the calibration was rechecked by Ron Fine on October 3, 1989.
The dose rate measurements were taken one meter above ground level on ten meter grid.
Additional readings were taken at the sides of the building and at the fence lines which were not on ten meter grid points.
A copy of the grid map is attached.
Grid Point
- 20E, 190N
- 20E, 200N
- 20E, 210N
- 20E, 220N
- 20E, 230N
- 20E, 240N
- 20E, 250N
- 20E, 260N
- 20E, 270N
- 20E, 280N
- 20E, 287.8N
- 10E, 190N
- 10E, 200N
- 10E, 210N
- 10E, 220N
- 10E, 230N Rem/hr.
4 4
5 4
4 5
6 4
5 4
4 5
4 4
5 5
North Fence
Grid Point
- 10E, 240N
- 10E, 250N
- 10E, 260N
- 10E, 270N
- 10E, 280N
- 10E, 287.8N OE, 190N OE, 195.6N 3.2E, 200N 3.2E, 210N 3.2E, 220N 5.2E, 222N 3.2E,.230N 3.2E, 240N 3.2E, 248N OE, 251N OE, 260N OE, 270N OE, 280N OE, 287.8N
- 1OW, 190N
- 1OW, 195.6N
- 1OW, 251N
- 1OW, 260N
- 1OW, 270N
- 1OW, 280N
- 1OW, 287.8N
- 20W, 190N
- 13W, 253N 19.5W, 251N
- 20W, 260N Rem/hr.
5 5
4 5
4 4
4 5
6 5
4 4
6 5
6 6
5 5
5 5
5 4
5 6
5 5
4 4
5 4
North Fence South Wall of Bldg.
East Wall of Bldg.
East Wall of Bldg.
East Wall of Bldg.
Under M.C.
Room Stairs East Wall of Bldg.
East Wall of Bldg.
Roof Drain North Wall of Bldg.
North.Fence South Wall of Bldg.
North Wal of Bldg.
North Fence Laundry Drain Excavation Bldg. Drain-North Bldg. Wall 4
(2)
Grid Point
- 20W, 270N
- 20W, 280N
- 20W, 287.8N
- 30W, 190N 26.3W, 199.7N
- 30W, 200N 26.3W, 210N
- 30W, 210N 26.3W, 280N
- 30W, 220N
- 30W, 230N
- 30W, 240N
- 31W, 248N
- 30W, 250N
- 30W, 260N
- 30W, 270N
- 30W, 280N
- 30W, 287.8N
- 40W, 190N
- 40W, 200N
- 40W, 210N
- 40W, 220N
- 40W, 230N
- 40W, 240N
- 40W, 250N
- 40W, 260N
- 40W, 270N
- 40W, 280N
- 40W, 287.8N
- 50W, 190N
- 50W, 200N
- 50W, 210N Rem/hr.
3 4
4 3
5 5
4 4
6 4
5 6
5 4
4 4
4 4
4 4
4 4
4 3
4 4
4 4
5 5
4 5
North Fence Asphalt Driveway Bldg. Drain-West Bldg Wall Asphalt Driveway West Wall-Change Room Asphalt Driveway West Wall-Boiler Room Over Dock Ramp Drain Sidwalk-West Wall-Rm.
121 Sidwalk-West Wall Rm.
121 Low Spot Collects Dock Drainage Sidewalk-West Wall-Rm 121 North Fence North Fence (3)
Grid Point
- 50W, 220N
- 50W, 230N
- 50W, 240N
- 50W, 250N
- 5OW, 260N
- 50W, 270N
- 50W, 280N
- 50W, 287.8N 54.6W, 190N 54.6W, 200N 54.6W, 210N 54.6W, 220N 54.6W, 230N 54.6W, 240N 54.6W, 250N 54.6W, 260N 54.6W, 270N 54.6W, 280N 54.6W, 287.8N V Rem/hr.
5 5
5 5
5 5
4 3
4 5
5 5
5 5
4 4
4 5
4 North Fence West Fence West Fence West Fence West Fence West Fence West Fence West Fence West Fence West Fence West Fence Northwest Corner of Fence (4)