Inspection/Activity Plan 09/01/2009 - 12/31/2010
ML092440589
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/01/2009
From:
Reactor Projects Region 2 Branch 6
To:
Tennessee Valley Authority
References
Download: ML092440589 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 07:50:18 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar PSB1-RP

- RADIATION PROTECTION PUBLIC INSPECTION 3

1 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/31/2009 09/04/2009 1

IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/31/2009 09/04/2009 1

IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/31/2009 09/04/2009 1

IP Performance Indicator Verification 71151 08/31/2009 09/04/2009 EB3-HS

- HEAT SINK 1

1 IP Heat Sink Performance 7111107T 09/14/2009 09/18/2009 EB3ISI

- INSERVICE INSPECTION 2

1 IP Inservice Inspection Activities - PWR 7111108P 09/28/2009 10/02/2009 EB3TI172

- TI-172 RCS DM BUTT WELDS 1

1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/28/2009 10/02/2009 PSB1-RP

- RP ACCESS CONTROLS INSPECTION (OUTAGE) 1 1

IP Access Control to Radiologically Significant Areas 7112101 10/05/2009 10/09/2009 1

IP Performance Indicator Verification 71151 10/05/2009 10/09/2009 OL EXAM

- INITIAL EXAM PREP 6

1 WATTS BAR/NOVEMBER 2009 EXAM AT POWER FACILITIES V23317 11/09/2009 11/13/2009 OL EXAM

- INITIAL EXAM 6

1 WATTS BAR/NOVEMBER 2009 EXAM AT POWER FACILITIES V23317 11/30/2009 12/04/2009 CDBI

- COMPONENT DESIGN BASES INSPECTION 8

1 IP Component Design Bases Inspection 7111121 02/15/2010 02/19/2010 1

IP Component Design Bases Inspection 7111121 03/01/2010 03/05/2010 1

IP Component Design Bases Inspection 7111121 03/15/2010 03/19/2010 1

IP Component Design Bases Inspection 7111121 03/29/2010 04/02/2010 PSB1-RP

- RP GROUNDWATER PROTECTION 2

1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 06/07/2010 06/11/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Alert and Notification System Testing 7111402 06/07/2010 06/11/2010 1

IP Emergency Response Organization Augmentation Testing 7111403 06/07/2010 06/11/2010 1

IP Emergency Action Level and Emergency Plan Changes 7111404 06/07/2010 06/11/2010 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/07/2010 06/11/2010 1

IP Performance Indicator Verification 71151 06/07/2010 06/11/2010 OL EXAM

- INITIAL EXAM PREP 9

1 WATTS BAR/AUGUST 2010 EXAM AT POWER FACILITIES V23328 08/09/2010 08/13/2010 OL EXAM

- INITIAL EXAM - WEEK1 7

1 WATTS BAR/AUGUST 2010 EXAM AT POWER FACILITIES V23328 08/23/2010 08/27/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 07:50:18 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Watts Bar OL EXAM

- INITIAL EXAM - WEEK 2 7

1 WATTS BAR/AUGUST 2010 EXAM AT POWER FACILITIES V23328 08/30/2010 09/03/2010 FP

- TFPI 5

1 IP Fire Protection [Triennial]

7111105T 09/20/2010 09/24/2010 1

IP Fire Protection [Triennial]

7111105T 10/04/2010 10/08/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK1 2

1 IP Access Control to Radiologically Significant Areas 7112101 10/18/2010 10/22/2010 1

IP ALARA - Required 7112102-7112102R 10/18/2010 10/22/2010 1

IP Radioactive Material Processing and Transportation 7112202 10/18/2010 10/22/2010 1

IP Performance Indicator Verification 71151 10/18/2010 10/22/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 3

1 IP Access Control to Radiologically Significant Areas 7112101 11/01/2010 11/05/2010 1

IP ALARA - Required 7112102-7112102R 11/01/2010 11/05/2010 1

IP Radioactive Material Processing and Transportation 7112202 11/01/2010 11/05/2010 1

IP Performance Indicator Verification 71151 11/01/2010 11/05/2010 OL RQ

- REQUAL INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 11/15/2010 11/19/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure